Plating work orders and line scheduling

Lots pile up at the loading end. Their due dates do not follow the order they arrived in. This feature turns received lots into work orders by due date and finish. Compatible lots are grouped, and each tank shows what is queued next. Planners see the whole line, and operators see the next tank.

A morning of queues across the tanks

Lots wait at the loading end, and their due dates disagree with the order they arrived in. The day is sorted while the first rack is being made up. Operators need to see what each tank takes next. The office needs to see what is late.

The planner opens the day’s list

Received lots are listed by due date and finish. Today’s lots are picked and work orders issued. Each order carries the lot, the route and the finish. Anything without a drawing stays behind.

A rush lot lands mid-shift

A customer rings to say a batch of housings is needed urgently. The order moves up the queue. The nickel line sees the change on its screen. Nobody walks across the shop with a note.

Two lots share a rack

Two lots of zinc fasteners with the same thickness requirement can go on together. They are grouped under one run. Both lot numbers stay attached, so traceability survives the shared load.

The supervisor looks at what is late

Near the end of the shift, the supervisor reads the list of work orders past their due date. Each shows the stage it has reached. The conversation with the customer starts from a fact, not a guess.

Work order fields behind the schedule

A work order is the instruction that joins a received lot to a route and a date. It is short, and every field has a reader on the line. Operators read the queue. Planners read the dates. The office reads the status when a customer rings.

Order number linked to lot

Each work order carries its own number and the lot it covers. A lot with several part lines can have several orders. The link back to receiving is kept. Nobody asks the stores what the parts are.

Due date and priority

The date the customer needs the parts is stored with a priority set by the planner. A rush is marked so it rises in the queue. Priority changes carry a note saying why. Without one, the reason for the jump is hard to defend later.

Finish and route copied across

The finish and the ordered tank steps are copied from the part’s specification onto the order. The operator sees the route without opening another screen. A later edit does not rewrite an issued order. It applies afterwards.

Queue position at each tank

Every tank has a queue of orders waiting for it. The position shows which lot is next. When an order is marked done at one tank, it moves to the next tank on its route.

Four roles and one shared queue

The schedule is read in the office and on the line. The two groups want different things from it. One plans the day. The other works through it, tank by tank, and marks each step done.

For the planner setting the queue

Issues orders, sets priority and groups compatible lots. Sees every tank’s queue side by side. When a rush arrives, the planner moves it up and the line sees the change. Dates promised to customers come from this view.

For the operator at the zinc line

Sees the next lot for the tank in front of them, with its finish and quantity. Marks the step done when the rack comes out. Nobody asks what is next.

For the front office on the telephone

Answers a customer’s call from the work order. The lot, the stage it has reached and the due date are in plain view. A promise is made from the schedule rather than from a hunch.

For the owner checking late work

Reads the orders past their due date, by customer. Spots a pattern, such as one finish that always runs behind. Decides whether to add a shift or turn away a rush. The data supports the decision.

What the queue takes from other features

The schedule depends on what the rest of the product knows. It reads received lots, copies routes and hands grouped lots to the loading step. Those links spare the planner from re-entering finish or customer. Orders are assembled from records already held in the system. No field is typed twice.

  • Received lots feed the list of orders to issue
  • Route steps come from specifications and process routes
  • Grouped lots go on to rack and barrel loading
  • Bath analysis due dates show beside each tank’s queue
  • Finished orders move to inspection and then dispatch

Rules to agree before the queue goes live

A schedule is only as steady as the rules behind it. Shops differ on who may jump the queue and what counts as a compatible load. Settle these points with the supervisor. Do it before the first work order is issued.

Who may reorder the queue for work orders and line scheduling

A rush can be moved up by the planner, but the supervisor may also want a say. Decide who holds that right. Otherwise two people reorder the same tank and the operators see the list change twice.

What makes two lots compatible

Same finish is the start. Thickness, colour and customer rules may add to it. Agree the test for grouping in plain words. Applying it the same way each time removes any reliance on memory.

How the due date is chosen

The customer’s date and the shop’s date can differ. Decide which one goes on the work order and which is kept in a note. The late list means little unless everyone reads one date. Pick it early.

What the tank screen shows

A tank screen can show customer names or only lot numbers. Choose which the operators need. Some shops hide names so staff do not discuss a customer’s work. Others want them for quick recognition.

The edge of the tank queue

The queue orders work. It does not work out how long a tank takes, the number of racks a bath holds or what the line can carry in a week. Those judgments stay with the planner and the supervisor. A one-tank shop with a short list of jobs can run a whiteboard. Size of the line decides.

FAQ

Frequently asked questions

Can one work order cover several lots?

Compatible lots can be grouped under one run, and each lot number stays attached. Traceability survives the shared load. Each lot is still inspected and certified on its own, with its own count and results.

How does the planner choose which lots to group?

Grouping starts from the same finish and a thickness requirement that suits one load. The rule is the shop’s own. The screen lists lots by finish and due date so those pairs are easy to find.

What does an operator see at a tank?

The next lot queued for that tank, with its finish, count and customer reference if the shop wants it shown. The operator marks the step done. The lot then moves to the next tank on its route.

Can a rush order jump the queue?

The planner moves it up and the affected tanks show the change. The reason is noted. Orders pushed back keep their place in line behind it. The late list then reflects what really happened on the day.

Can the office see which orders are late?

Lots on the line are listed by stage and due date, and late orders stand out. The owner can read the list by customer. A customer’s call is answered from the same screen the supervisor uses.

Where it fits

How this feature fits the system.

Plating Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Customer lots and receiving

Every delivery is booked in as a numbered lot with count and weight, so the same parts can be traced from the gate to dispatch.

Batch and Serial Tracking

Work orders and line scheduling

A work order carries the finish, thickness and due date, and each tank sees which lots are queued next on its route.

Work Order Management

Racks, barrels and loading

Lots with a compatible finish are grouped onto racks or into barrels by count and surface area, before they enter the first bath.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements