Skip to main content
GullySystem

Manufacturing · Software for precision component manufacturersFollow each drawing revision, setup, inspection reading and job work delivery note through one batch record.

Precision component manufacturers run CNC lathes, Swiss-type turning centres, machining centres and centreless grinders on small parts, each held to a drawing and tolerance for different buyers. Revisions, setup sheets, CMM printouts and plating dispatch notes sit in separate files. The software keeps a batch, its stages and its rejections together. Gauge calibration dates and buyer rejection registers are custom work.

At a glance

You turn, mill and grind shafts, bushes, spindles and dowel pins to a drawing, and a micrometer, bore gauge or CMM decides whether each one passes. Runs are short. The same bush returns under a new revision letter.

The floor knows how to hold a tolerance on a collet or a chuck jaw. What goes missing is the paper around it: the revision cut, the setup sheet, the Ra and diameter readings, the bar heat number, and the job worker who held the lot last.

How the work runs today

An enquiry arrives with a drawing and a quantity. Someone costs EN8 or 304 stainless bar, spindle hours, deburring and any outside process before the quotation goes back, and a purchase order then fixes a delivery date for each lot.

A planner prints the router. The store issues bar against it. The operator proves the first piece on the lathe. Then the run starts, and the inspector takes readings at set intervals with a snap gauge or an air gauge, sending failed parts to rework or scrap.

Zinc plating, case hardening or anodising leaves on a dispatch note with a job worker. Finished lots are inspected, packed with a report where the buyer wants one, and shipped with the invoice. A buyer’s rejection comes back weeks later.

Where it breaks

What goes wrong for precision component manufacturers without a proper system.

An old revision gets machined

A buyer revises a drawing by email, yet the router at the lathe still says revision B. A lot of 800 shafts is bored to the superseded diameter and scrapped, because the email sat in one inbox.

Inspection readings stay on paper

Bore, runout and Ra readings are written on sheets kept in a drawer beside the surface plate. A buyer’s query a month later means digging through that drawer by hand.

Rejection is counted but not explained

Scrap is totalled at month end with no stage, machine or cause beside it, so taper, chatter marks and insert burrs recur on the same bores. Nobody wrote down which spindle ran them.

Job work goes out and is not chased

Shafts sent for plating or case hardening are noted in a bound book, and returns are never set against what left. A short count surfaces only when the buyer’s truck is already waiting at the gate.

Tool and gauge records sit apart

Insert changes live in the operator’s head and calibration dates in the quality head’s diary. Nothing warns before a plug gauge, thread ring or micrometer falls out of date.

What changes

What precision component manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Only the current drawing revision gets machined

The router printed for a lot always refers to the live revision. A buyer’s drawing change replaces the old one in the system. The operator proving a first piece on the lathe holds the right sheet. Machining the wrong revision stops being an excuse. Old sheets leave the floor.

Inspection readings that explain the rejection

Snap gauge and air gauge readings are entered at the machine against the lot and the dimension. A rejection shows which feature drifted and on which shift. The inspector and the planner look at the same numbers. Corrective talk starts from data. Patterns across shifts become visible.

Plating and job work chased by date

Parts sent for plating or heat treatment are logged on a dispatch note with the date due back. The store sees what is outside and for how long. The buyer’s delivery date is not discovered to be at risk on the last day. Phone calls to the plater become targeted.

Quotes built from real spindle hours

The estimator costs bar, spindle time and deburring from the hours that similar lots took. A repeat enquiry for an EN8 shaft starts from the previous job. Quotes stop being fresh guesses. The owner sees which parts earn their machine time. Fresh quotes start from known hours, not hope.

Buyer rejections linked to the original lot

When a customer returns parts, the rejection register points to the lot, the machine and the inspection record. The reply to the buyer is built from facts. Repeat problems with one part number become visible across months. Replies to the buyer carry evidence. Arguments end sooner.

What the software does

What we would build for precision component manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Enquiries, drawings and revisions

Log each enquiry with its drawing and keep every revision letter against the part number. The order, the work order and the router all name the agreed revision, and a stale one is flagged before release.

Routers, work orders and job cards

Set the turning, milling and grinding sequence for each part, release a work order per lot, and record quantity passed, rejected and held at each stage. Operator and shift travel with every card.

Bar, sheet and consumable stock

Count bar, sheet, forgings and consumables by grade, diameter and heat number, with every issue tied to a work order. A tool and insert list is added as custom work.

Inspection readings and rejection

Save first-piece and in-process readings against the lot, hold a batch until the inspector clears it, and count rejection and rework by stage and reason. Gauge calibration dates are a separate addition, built with your quality head.

Job work dispatch notes

Send shafts and bushes out for plating, heat treatment or anodising on a dispatch note, and reconcile what came back against what went. Any shortfall stays on view until it is cleared.

Dispatch, invoices and buyer rejections

Pieces that pass inspection are packed into trays. Quantities on the dispatch papers come straight from what was counted into each tray. Nobody retypes a figure once the packing is done. A register linking each buyer rejection to the lot that shipped is built as custom work.

Machine load and the week’s plan

See the hours queued on each lathe, Swiss-type turning centre, mill and grinder, and move target dates by hand. There is no automatic scheduler.

Tool life and insert register

Cutting inserts, drills and taps are listed by job and machine, with pieces made before change. Operators log a swap. Planners see which tool is near its limit before a long run starts.

Customer first article approvals

First article reports are filed per drawing revision, with the buyer’s sign off and date. The inspector reads them before a repeat lot starts. A revised drawing asks for a fresh approval.

Plating and heat treatment lots

Parts sent for plating or hardening are booked by lot, process and outside vendor. Returns are checked for finish and hardness. Rejected lots stay with the vendor’s name for claims.

Before you talk to a supplier

A requirements checklist for precision component manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules precision component manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Bill of Materials

A turned part lists its bar grade and diameter, the cutting length, the outside process and the packing. Revised drawings create a new version. Stores issue bar against the version the router names.

Learn more

Work Order Management

A lot of shafts or bushes gets a job card with its router, bar issued and operation steps. Operators log quantities passed and scrapped at each. Closing the card sends good parts to inspection.

Learn more

Production Planning

Lathes, Swiss-type turning centres and grinders are loaded with the week’s lots against buyer delivery dates. Setup time between drawings is counted. A late bar delivery shows which machine will sit idle.

Learn more

Quality Control

Snap gauge and air gauge readings are recorded at set intervals against each lot, and failed parts are routed to rework or scrap. The final inspection sheet is built from those readings. Buyers receive it.

Learn more

Job Work Management

Components sent for plating, hardening or deburring leave on a dispatch note with count and weight. The return is checked against it. Pending outside lots show by processor and promised date.

Learn more

Purchase Order Management

Bar stock, inserts, gauges and packing material are ordered from approved suppliers with grade and diameter stated. Receipts close the order line. Buyers see which bar is awaited for the next lot.

Learn more

Order Management

Each customer purchase order is split into lots with their own delivery dates and drawing revision. Partial dispatches reduce the open balance. Sales can answer when the next lot of a part ships.

Learn more

Stock Tracking and Alerts

EN8 and 304 stainless bar, brass rod, inserts and coolant carry reorder levels by size. Stores see remaining length against lots planned. A short bar is flagged before the setup is done.

Learn more
AI by department

Where AI can help precision component manufacturers.

Each one reads records you already keep, and a person approves every decision.

Worldwide

Where we work with precision component manufacturers.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Inspection readings and rejection

Who decides whether a failed result blocks the next step?

For “Inspection readings and rejection”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Enquiries, drawings and revisions

Which version applies to work that has already started?

Use a revised example from “Enquiries, drawings and revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Common questions

Questions precision component manufacturers ask before they call.

Can machines send their counts to the system directly?

Not on its own. Operators tick off each job card on a tablet beside the lathe. Reading a Fanuc, Mitsubishi or Siemens controller depends on the make and the option fitted, and it is quoted as separate work once we have looked at the machine.

Does it produce first article reports in a buyer’s format?

Not as a ready module. Dimensional readings and check results are saved against each lot. A first article report in the layout a buyer expects, such as an AS9102 form, is custom work agreed once you share a sample.

Will it work out the actual cost of a finished batch?

No. Costing sits at the quotation stage, where bar stock, spindle time, deburring and job work are priced. Material consumed, rejection and job work for each batch stay on record for your accountant.

Can the figures reach my accounting software?

Nothing posts into your accounts system by itself. Your accountant can read the figures inside GullySystem, and a file for the books gets its own quotation after the ledger heads are fixed.

How is a small-parts machining shop quoted?

Lathes, Swiss-type centres and grinders to plan, the buyers and drawings to load, and the users from quoting to dispatch all count. Machine count links are separate. Calibrating gauges is custom work. A quotation follows after your job cards are seen.

What should a precision shop have ready?

A drawing with its revision, a router, a job card, inspection readings, a plating dispatch note and a buyer rejection report. A shop planner and an inspector will review the screens.

Who keeps batch and rejection records if we move away?

Batches, readings and buyer rejections are produced as spreadsheet files whenever asked. Ownership of the code stays with the shop. Those who wrote the software support it. GullySystem provides hosting, or the shop may keep its own.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Across India

Cities where precision component manufacturers are common.

Related

Related industries.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements