Quality Checks and Rejections in Production
Checks happen where the work happens, at the stage and at final inspection. Rejection and rework are counted with the reason that caused them.
Where checks are recorded
Readings and check lists
What gets measured differs by trade. A machine shop records diameters and lengths against drawing limits. A fabrication unit notes weld checks and coating thickness, and a food unit records weight, temperature or a taste panel result. The check list for each part is entered once and then appears on the card. A reading outside the limit is flagged as it is typed, which is the point at which a supervisor can still act.
Rejection, rework and hold
What the client decides
- The reason list and which reasons count as rework rather than scrap
- Which stages need a first-piece check before running
- Who may release a held batch
- Whether readings are typed or only a pass mark is kept
What a quality system standard expects
ISO 9001 asks that product failing its requirements is identified and controlled so it is not used or delivered by mistake. In practice that means a few plain things.
Choosing reason codes that people will use
A list of forty reasons gets ignored and everything lands under other. A list of six hides the pattern. Aim for the dozen or so that your supervisors say aloud on the floor. Review the list after a month, merge the ones nobody picks and split any reason that holds half the rejections. Names matter too. Use the words operators already use, such as porosity or burr, not an abstract code a clerk invented.
Weak spots in small unit inspection
- First piece not checked after a tool change
- Gauges used past their calibration date
- Rework passed by the same person who made the fault
- Final inspection done on a sample with no record of the sample size
- Customer returns logged on paper and forgotten
Quality checks through a production shift
Quality work is spread across the shift and not left for the end. This page follows an inspector and an operator through one shift. It shows when each check is recorded and what happens when a piece fails. The pattern is steady. Each check leaves one entry that others can read.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Quality Checks and Rejections in Production
Who decides whether a failed result blocks the next step?
For “Quality Checks and Rejections in Production”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.
Background reading: ERPNext: inspection criteria
Scrap and its weight
Do purchasing, operating and billing quantities use the same unit?
Check the measurement unit and rounding used in “Scrap and its weight”. Compare the result with a known sample before accepting a converted quantity or calculated charge.
Background reading: ERPNext: units of measure
Frequently asked questions
Can we keep drawing limits on each check?
Yes. Upper and lower limits sit on the check line, and a reading outside them is marked when it is entered.
Are rejections shown by operator?
Yes, because the job card already names who ran the stage. How that view is used is for the owner to settle.
Does it produce an inspection report for a buyer?
Readings saved against a batch can be printed for the buyer. The format a particular buyer insists on is confirmed during scoping.
What happens to a batch that fails after packing?
It is brought back from finished goods with a reason, and the quantity available for dispatch drops by that much.
Does the system replace our inspection report format?
It holds readings and results, and a report can be printed from them. A buyer who insists on a particular layout is dealt with at scoping.
Can a lot be accepted with a concession?
That is a decision for your quality head. The record can note the concession, who agreed it and the buyer reference.
Where are gauge calibration dates kept?
Ask for this during scoping. A calibration register can be kept apart, and whether it joins this record is a choice.
How do we find the stage behind a customer complaint?
Log the complaint against the batch. The work order lists its stages and operators, so the stage behind the fault can be traced.
How this feature fits the system.
Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Multi-level bill of materials and routing
Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.
Bill of MaterialsWork orders and batch planning
Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.
Work Order ManagementWork orders and batch planning
Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements