Skip to main content
GullySystem

Bill of Materials for Manufacturers

Each part has a material list and a stage sequence held against its drawing revision. The store issues from that list and the floor works through those stages.

What the material list holds

The list answers one question. What must the store issue for one piece of this part at this revision, and what arrives ready-made from a supplier?

Material and grade

Bar, sheet, casting, resin or ingredient with its grade, section size and the quantity one piece consumes. Weight per piece can be held too.

Bought-out items

Bearings, fasteners, motors, seals, labels and cartons that come in ready and go into the part or its packing.

Scrap and process allowance

The extra material a cutting, machining or filling stage takes, so the issue quantity for a batch is not short on the shop floor.

Consumables noted apart

Electrodes, inserts, coolant, thinner or stretch film are listed as consumables, since they are not counted into one piece.

Routing and stages

Routing is the order the part travels in. Cutting, turning, milling, welding, grinding, filling, coating, assembly and packing are set in sequence for each part. Each stage names the machine or work centre it runs on. A stage done by an outside vendor is marked as job work, so the planner knows material will leave the premises. Standard time per piece can be held on a stage where your supervisors have a figure they trust.

Revisions and sub-assemblies

A part made this year is rarely the part made last year, because buyers revise drawings and suppliers change what they are able to offer.

Drawing revisions

Each revised drawing opens a fresh revision of the material list. Batches already built against the old drawing still show the list they used.

Sub-assemblies

A gearbox, a frame or a filled bottle can carry its own list and stages. A parent part then draws it in.

Where it is used

For any material or bought-out item, the parts that consume it can be listed. That saves a hunt through old files.

What the plant sets up for bills of materials

  • Part numbering and how a drawing revision is written
  • Scrap allowance against each stage or material
  • Which stages are done inside and which go to a vendor
  • Who may change a material list once it has been used
  • Whether standard times are kept on stages at all

Questions for a bill of materials vendor

Demos use tidy sample parts. Yours have odd history. Put a real part through before you decide anything.

Load a part you already make

Pick one with a sub-assembly and a drawing change. Watch whether the list, the stages and the old revision all survive the entry.

Ask how a revision is retired

A buyer may still order the old revision for a year. The system should let both live, with only one released to new work orders.

Ask what happens to open batches

A change mid-batch is common in a job shop. Find out whether the running work order keeps its list or picks up the new one.

Where material lists go wrong on the floor

  • A drawing changes on paper but the list in the office does not, so the store issues for the old part
  • Scrap allowance is guessed once and never reviewed against what the stage really loses
  • Bought-out items such as seals and cartons are left off, and the batch stops at packing
  • One list is copied for a near-identical part and then edited in two places by two people
  • Consumables are mixed into piece quantities, which makes every batch look over-issued

Who looks after the list

A material list is a living record. Somebody has to own it, and the shop knows who. In a job shop that is the design or planning person who receives the buyer drawing. The store reads the list but does not edit it. A change on a part already used in released work orders is best approved by the owner, because it shifts cost and issue quantities at once. Settle this at scoping, before the first part is keyed in. It costs nothing to decide and a great deal to dispute later.

One part from drawing to the floor

Accuracy at each step saves scrap later.

The engineer enters the list

The engineer opens the part and enters the materials and quantities against the drawing revision. Stages are added in order. Scrap allowance is stated. The part is ready to be released to the floor. The floor trusts it.

The store issues material

When a job is raised, the storekeeper reads the material list and issues exactly that. Nothing leaves the store on a verbal request. Records match issues. Stock stays honest.

The operator follows the stages

The operator at the machine reads the next stage on the job and records the pieces done. A step cannot be skipped without showing. Quality is checked where the list says it should be. Mix-ups are avoided entirely.

A revision arrives

The customer revises the drawing. The engineer adds the new revision with its material change. Jobs already started keep the old list. New jobs pick up the new one. Nobody mixes them. Scrap falls. Waste is visible.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Drawing revisions

Which version applies to work that has already started?

Use a revised example from “Drawing revisions” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Routing and stages

Is the plan based on demand that is still open?

Review “Routing and stages” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

FAQ

Frequently asked questions

Can a material list have more than one level?

Yes. Sub-assemblies carry their own lists and stages, and how deep your structures run is settled when the parts are entered.

What happens to old batches when a drawing changes?

They stay against the revision they were made to. The new revision applies from the work orders released after it.

Must every consumable be listed?

No. Keep electrodes, coolant and film as plain store items and leave them out of the piece-level list.

Can two parts share one material list?

A list can be copied to a near-identical part and then altered. The two stay separate afterwards, so a change to one leaves the other alone.

How long does it take to enter our parts?

The time follows your count of active parts and the state of your drawings. Most units start with the parts that run every month and add the rest as orders arrive.

Can a list show material cost per piece?

Quantities per piece are held. Costing is yours, so a rate for each material is something you decide to enter or leave out.

What if a buyer supplies the material?

The list can mark an item as buyer supplied, so the store receives it but does not buy it. Its stock is kept apart from your own.

Does the stage sequence have to match the drawing?

No. The sequence follows how your floor really works. The drawing revision is only noted beside it so the operator sees the right sheet.

Where it fits

How this feature fits the system.

Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Multi-level bill of materials and routing

Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.

Bill of Materials

Work orders and batch planning

Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.

Work Order Management

Work orders and batch planning

Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements