Bill of Materials for Manufacturers
Each part has a material list and a stage sequence held against its drawing revision. The store issues from that list and the floor works through those stages.
What the material list holds
The list answers one question. What must the store issue for one piece of this part at this revision, and what arrives ready-made from a supplier?
Routing and stages
Routing is the order the part travels in. Cutting, turning, milling, welding, grinding, filling, coating, assembly and packing are set in sequence for each part. Each stage names the machine or work centre it runs on. A stage done by an outside vendor is marked as job work, so the planner knows material will leave the premises. Standard time per piece can be held on a stage where your supervisors have a figure they trust.
Revisions and sub-assemblies
A part made this year is rarely the part made last year, because buyers revise drawings and suppliers change what they are able to offer.
What the plant sets up for bills of materials
- Part numbering and how a drawing revision is written
- Scrap allowance against each stage or material
- Which stages are done inside and which go to a vendor
- Who may change a material list once it has been used
- Whether standard times are kept on stages at all
Questions for a bill of materials vendor
Demos use tidy sample parts. Yours have odd history. Put a real part through before you decide anything.
Where material lists go wrong on the floor
- A drawing changes on paper but the list in the office does not, so the store issues for the old part
- Scrap allowance is guessed once and never reviewed against what the stage really loses
- Bought-out items such as seals and cartons are left off, and the batch stops at packing
- One list is copied for a near-identical part and then edited in two places by two people
- Consumables are mixed into piece quantities, which makes every batch look over-issued
Who looks after the list
A material list is a living record. Somebody has to own it, and the shop knows who. In a job shop that is the design or planning person who receives the buyer drawing. The store reads the list but does not edit it. A change on a part already used in released work orders is best approved by the owner, because it shifts cost and issue quantities at once. Settle this at scoping, before the first part is keyed in. It costs nothing to decide and a great deal to dispute later.
One part from drawing to the floor
Accuracy at each step saves scrap later.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Drawing revisions
Which version applies to work that has already started?
Use a revised example from “Drawing revisions” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Routing and stages
Is the plan based on demand that is still open?
Review “Routing and stages” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Frequently asked questions
Can a material list have more than one level?
Yes. Sub-assemblies carry their own lists and stages, and how deep your structures run is settled when the parts are entered.
What happens to old batches when a drawing changes?
They stay against the revision they were made to. The new revision applies from the work orders released after it.
Must every consumable be listed?
No. Keep electrodes, coolant and film as plain store items and leave them out of the piece-level list.
Can two parts share one material list?
A list can be copied to a near-identical part and then altered. The two stay separate afterwards, so a change to one leaves the other alone.
How long does it take to enter our parts?
The time follows your count of active parts and the state of your drawings. Most units start with the parts that run every month and add the rest as orders arrive.
Can a list show material cost per piece?
Quantities per piece are held. Costing is yours, so a rate for each material is something you decide to enter or leave out.
What if a buyer supplies the material?
The list can mark an item as buyer supplied, so the store receives it but does not buy it. Its stock is kept apart from your own.
Does the stage sequence have to match the drawing?
No. The sequence follows how your floor really works. The drawing revision is only noted beside it so the operator sees the right sheet.
How this feature fits the system.
Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Multi-level bill of materials and routing
Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.
Bill of MaterialsWork orders and batch planning
Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.
Work Order ManagementWork orders and batch planning
Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements