Manufacturing Software Connections to WhatsApp, Tally and Scales
A unit already uses a phone, a printer, a scale and an accountant. The production system connects to those rather than asking you to drop them.
Messages to buyers and vendors
Money, accounts and devices
What the factory needs from the other system
Every connection here has a second party, and that party sets the limits. A WhatsApp business number has to be approved by the provider, and the message templates it allows are the provider rule rather than ours. A payment gateway needs an account in your firm name. A scale or a gate reader must expose a port or a file another program can read. Some older models simply do not. Each make and model is therefore checked before a link is promised.
What factory scoping confirms
- Which messaging route each kind of alert will take
- The make and model of every scale, printer and gate device
- The ledger and tax heads an accounting export must match
- Which connections are included and which are quoted apart
Rules set by the other side of a connection
Every link depends on a second party, and that party can say no.
Questions to put to a connection vendor
- Which of these links are built, and which are promised for later
- Who owns the provider account, you or the vendor
- What happens to a message when the phone number is blocked or the buyer opts out
- Does a failed export say which row failed and why
- What does a scale link cost when you add a second weighbridge
- Who is called when the gate device stops sending
Order of rollout for a small unit
Do not switch on every link in week one. A unit that has never used a barcode label will not learn labels, scales and WhatsApp together. Start with the message routes, because they need no hardware. Add the accounts export once your accountant has seen a sample file and agreed the ledger names. Bring in scales and printers section by section, beginning with the store, where weight is typed most. Gate devices come last. They only help once shifts and operators are already clean on the system.
Connections through one day at the unit
A connection earns its place when someone touches it on a shift. Follow one day in a small factory, from the first message to the evening export. Each link below is touched by someone different. The hours differ too, from the first reminder at opening time to the file sent out when the office closes.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Weighing scales
Do purchasing, operating and billing quantities use the same unit?
Check the measurement unit and rounding used in “Weighing scales”. Compare the result with a known sample before accepting a converted quantity or calculated charge.
Background reading: ERPNext: units of measure
UPI and payment gateway
Can the same receipt be allocated without counting the money twice?
Take an unallocated amount in “UPI and payment gateway” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.
Background reading: ERPNext: payment allocation
Frequently asked questions
Will our existing weighing scale work?
It may. The make, model and output port are checked during scoping, and the link is quoted once that is clear.
Does it write into Tally without a person?
No. A file is prepared for your accountant to import, after the ledger layout has been agreed.
Can dispatch details reach a buyer automatically?
Yes. A message with part, quantity, challan and vehicle number can go out when the dispatch is saved.
Is a gate attendance device necessary?
Not at all. A supervisor can mark the shift list, and a device only removes that typing where you already own one.
Who pays the WhatsApp or SMS charges?
Those are charged by the provider on your own account. GullySystem sets up the connection and keeps the message records.
Can our accountant test the Tally file first?
Yes, and that is the sensible order. A sample file is prepared, your accountant imports it into a copy of the company, and the ledger names are corrected before real figures go in.
Do buyers have to install anything?
Buyers need nothing. They receive an ordinary message or mail with the document attached. Payment links open in the buyer phone browser.
What if the internet drops in the shed?
Anything that needs the provider will wait. Entries on the floor depend on how your network is set up, which is checked during scoping.
Can we change the WhatsApp wording later?
Yes, though a changed template may need fresh approval from the provider before it can be used. Plan changes ahead of busy weeks.
How this feature fits the system.
Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Multi-level bill of materials and routing
Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.
Bill of MaterialsWork orders and batch planning
Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.
Work Order ManagementWork orders and batch planning
Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements