Sales Orders for Small Manufacturers
A confirmed order carries the part, the revision, the quantity and the week it is due. Each work order raised against it shows how much is still to make.
What the order records
Schedules and part deliveries
A buyer of machined parts, panels or packed goods may release a yearly quantity in monthly lots. Every lot sits on a separate line with a due week of its own, and each dispatch is booked against the lot it serves. The line then shows quantity ordered, made, dispatched and still pending at a glance. If the schedule changes by mail, no fresh order is needed, because the revision is recorded on the existing line.
How the order reaches the floor
What the client decides
- Whether a buyer purchase order is needed before a work order is released
- Who may change an agreed rate or a promised week
- How part deliveries against a schedule are numbered
- Which buyers may order on credit and up to what balance
Reading a buyer purchase order before accepting it
The purchase order is a contract in short form. A clerk who reads it closely saves the floor from a bad surprise.
What a planner needs from an order line
- A part and revision that exist in your item list, with a material list and stages
- A delivery week for each lot, not just a month
- A clear unit of measure, since kilograms and pieces get confused
- Special packing or labelling noted where it applies
- A named person who can approve a change in quantity
When buyers change their mind
Schedules move. Lots get cut, pulled forward, or moved to a different revision. Each change touches work orders already released and material already issued. Record the change on the same line, keep the earlier figure visible and tell the planner the same day. Waiting for a review at month end is how a unit ends up with finished stock nobody ordered. Decide at scoping who may accept a change by phone and who must see it in writing, since that rule protects the unit when a buyer later denies what was agreed.
Sales orders through a planner’s week
An order is not finished when it is entered. In practice, it is read, split, chased and closed over several weeks. This page follows those who handle a confirmed order, from the first schedule to the final invoice. Several hands touch it. Each sees only the lines it needs.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Part and revision
Which version applies to work that has already started?
Use a revised example from “Part and revision” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Work orders against the line
Is the plan based on demand that is still open?
Review “Work orders against the line” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Frequently asked questions
Can one order have several delivery dates?
Yes. A schedule holds part quantities with their own weeks, and dispatches are matched to the lot they belong to.
What happens when a buyer cuts the quantity?
The line is revised and the earlier figure stays visible. Released work orders are listed so the planner can stop or reduce them.
Can an order cover a part we have never made?
Yes, though the bill of materials and the stages have to be entered before a work order can be released for it.
Is a verbal order from a regular buyer allowed?
That is for the owner to set. The order can be saved with the mode noted as a call, with the written confirmation attached later.
Does an order need a work order straight away?
No. Hold orders until material arrives or until the delivery week comes within reach. Release is the planner decision.
Can the rate differ by lot?
Yes. Each lot line carries its own rate, which suits buyers with price revisions mid year.
How are export orders different?
They add documents and packing detail that the buyer specifies. Whatever applies to yours is confirmed during scoping.
Where do I see everything still owed to a buyer?
The pending quantity on each line adds up by buyer. It is ordered less dispatched, so it stays honest as lots leave.
How this feature fits the system.
Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Multi-level bill of materials and routing
Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.
Bill of MaterialsWork orders and batch planning
Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.
Work Order ManagementWork orders and batch planning
Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements