Skip to main content
GullySystem

Purchase Orders for Manufacturing Units

Purchase begins from the shortage thrown up by open work orders. An order goes to a supplier, material is received against it, and the supplier account follows.

Raising the order

From the shortage list

Materials short for released work orders are shown together, so one order can cover several batches from the same supplier.

Rate history

The last few rates paid to each supplier for that grade are visible while the order is being made.

Terms on the order

Quantity, rate, GST treatment, delivery date, freight and payment days are stated on the order and sent to the supplier by mail or WhatsApp.

Approval before sending

An order above a value the owner fixes can wait for approval. Smaller store orders go straight out.

Receiving and inspecting

Material is received against the order, not loose. The storekeeper enters the weight or count that actually arrived, and a short or excess delivery shows against the ordered quantity without anybody reworking the order. Incoming inspection is recorded next. A grade that fails is held, marked for return to the supplier, and kept out of the stock the planner can issue against a batch.

Supplier records

Supplier master

Firm name, GST number, bank details, contact person and the materials that supplier normally sends.

Ledger and outstanding

Invoices received, payments made and the balance owed to each supplier, with the order each invoice belongs to.

Pending orders

Quantity ordered less quantity received for every open order, which the planner reads when a batch is waiting on material.

Supplier performance notes

Late deliveries and rejected lots are visible from the receipt records, so the owner can judge a supplier on what actually arrived.

What supplier ordering does not do

  • It does not send payments to a supplier bank account
  • It does not pick a supplier for you
  • It does not file your GST returns
  • Approval values and payment terms are agreed with the owner at set-up

Choosing among suppliers of the same grade

Price is one factor. A cheap bar that arrives late stops a batch, and a late batch costs more than the saving. Look at what has arrived before.

Delivery record

The receipt dates against promised dates show who is dependable.

Rejection history

Lots held for grade or size problems show who sends material you can use.

Certificates

Where buyers ask for mill certificates, a supplier who sends them without chasing saves your quality person hours.

Payment terms

Credit days differ. Weigh them against rate rather than ignoring them.

What buyers of material should confirm at scoping

  • Who approves a purchase order above a limit
  • Whether prices on the order may differ from the last rate
  • How a short or excess delivery is treated
  • Whether job work vendors share the supplier list
  • How supplier GST details are checked when added

Buying for several work orders at once

A busy unit seldom buys for one batch. Shortages from three or four orders for the same bar size can be grouped into one order, with one delivery and one freight charge. The risk is that the material then belongs to nobody in particular, and the store issues it to whichever batch asks first. Control this by issuing only against a work order number. Then the first batch to ask is the one the planner released, and the others wait their turn in the shortage list, visibly.

Purchasing through a working week

Buying for a plant is a run of small checks, repeated every day. It shows how each order is raised, chased, received and finally paid. The routine is plain. Each step leaves a record for the next person.

Starting from the shortage list

On Monday the clerk opens the shortage thrown up by open work orders. Each line names the grade, the size and the quantity needed. Orders go out before lunch. Lines are grouped by supplier, so one order covers several shortages.

Chasing a late lorry

A supplier promises steel on Wednesday and nothing arrives. The clerk opens the order, notes the new promise and marks the delay. The floor does not stop. The planner sees which batches will wait and moves them ahead of the delay.

Receiving at the store

The lorry arrives and the store keeper counts against the order. Size and grade are checked, and a short or wrong lot is noted on the receipt. Accepted material enters stock. The order balance falls and the shortage list shrinks with it.

Matching the bill before payment

The supplier’s bill reaches accounts on Friday. A difference in rate or quantity is queried first. Payment waits for agreement. The order, receipt and bill must match before money moves.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Ledger and outstanding

Can you explain the balance from its original documents?

Select a partly settled example in “Ledger and outstanding”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Purchase Orders for Manufacturing Units

Does receiving less than ordered leave the correct quantity open?

Bring a short delivery to the “Purchase Orders for Manufacturing Units” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.

Background reading: ERPNext: purchase receipts

FAQ

Frequently asked questions

Can one order cover several work orders?

Yes. Shortages from different batches are grouped by supplier, and the receipt still credits stock that any batch can draw from.

What if a supplier sends less than ordered?

The receipt records what came, and the balance stays pending until it arrives or the order is closed short with a reason.

Is rejected material taken into stock?

No. It is held separately and marked for return, so a planner cannot issue it to a batch by mistake.

Can job work vendors sit in the same supplier list?

Yes, with their process named. Their challans and charges are handled in the outside job work module rather than here.

Can I amend a purchase order after sending?

Yes, though the supplier must agree. Keep the changed order with its earlier version so the trail is clear.

How are freight and unloading handled?

Freight is stated on the order. Extra charges at receipt can be noted on the supplier account.

Can a purchase order be raised without a work order?

Yes. Routine stock such as fasteners and consumables can be ordered from reorder levels alone.

What stops duplicate orders for the same shortage?

Open orders are shown with the shortage, so a buyer sees material already on order before placing another.

Where it fits

How this feature fits the system.

Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Multi-level bill of materials and routing

Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.

Bill of Materials

Work orders and batch planning

Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.

Work Order Management

Work orders and batch planning

Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements