Skip to main content
GullySystem

Labour and Piece Rate Records in Manufacturing

Shift attendance and job card output are kept in one place for operators and contract labour. Piece-rate counts come from cards already marked on the floor.

Who is on record

Own operators

Machine operators, welders, fitters, packers and helpers on your rolls, each with the stages or machines they run. Each carries an employee number.

Contract labour

Workers supplied through a contractor are held under that contractor, with the shifts they attended counted against the contractor’s name.

Supervisors and inspectors

Floor supervisors and quality staff, whose names appear on the cards they mark or the batches they clear. Those names stay on the record.

Shifts and attendance

Shift timings are set once for the unit and attendance is marked against them. A biometric or card device at the gate can feed the entry where you have one, and a supervisor list works where you do not. Overtime hours are entered against the shift. Leave and absence are marked, so the planner knows a machine may stand idle the next day. A stage with nobody on it shows before a batch is promised.

Counting piece-rate work

Output from the cards

Pieces passed at a stage are already on the job card with the operator named, so a piece-rate count needs no second register.

Rate per piece or per stage

Your own rate for a stage on a part is held against it, and the earning for a period is worked out from the passed quantity.

Rejections against the count

Whether rejected pieces are paid for is your rule. Passed and rejected counts appear separately, so either rule can be applied.

Figures for payroll

Shift counts, overtime hours and piece-rate quantities are listed by person and period. Nothing is worked into a wage figure.

What piece-rate records do not do

  • It does not calculate wages, deductions or statutory contributions
  • It does not file any return or challan for labour
  • It does not decide a piece rate for any stage
  • How these figures reach your payroll is a matter for the client and the accountant

Questions to settle before piece rates go in

Piece work looks simple until the first dispute. A few rules, agreed in advance and written down, save arguments at the gate.

Rate by stage or by part

The same stage on two parts may pay differently. Decide where the rate lives before you enter any.

Rejected pieces

Some units pay only for passed pieces. Others pay for all pieces and recover the loss on repeated faults. Both counts are shown, so either rule works.

Rework done by another person

Rework happens in the next shift. Say who earns on a reworked piece and mark it so the count is not paid twice.

Contract labour and the contractor bill

Workers supplied by a contractor are paid by the contractor, and you pay the contractor on a bill. That bill is where mistakes creep in. Shifts attended and pieces cleared are on your record already, grouped under the contractor’s name. Compare the bill with those counts before approving it. A gap does not prove the contractor is wrong, since a shift may have been logged late. It does tell you where to ask. This one check alone is worth the effort of marking cards properly.

Records that statutory registers draw on

  • Name, employee number and date of joining for own staff
  • Shifts and overtime hours by date
  • Contractor name against every contract worker
  • Output by person and period, from the job cards
  • Leave and absence marks

Labour records across a working week

Wages come from what was recorded during the week, so each day adds to the figure. The week is the unit. Employed operators and contract workers share the same records, so one weekly sheet can cover both.

Marking attendance at shift start

The gate clerk marks who has come in for the morning shift, by name and by section. A contract worker is entered against the contractor. Latecomers are shown separately, so the supervisor knows the true strength before assigning machines.

Piece counts through the shift

Each operator’s finished lots are read from the job cards marked at the machine. The count for a person builds up by rate and by part. Nobody counts again. The figure for each person comes straight from cards, with rate and part shown beside it.

The supervisor settles disputes

On Thursday an operator questions a count. The supervisor opens the cards behind the figure and sees which lots were passed and which were sent back. The query is answered from records, and the card is the proof.

Preparing the weekly payment sheet

On Saturday the accounts person reads the week’s attendance and piece totals for each person. Contractor totals are shown as one line per contractor. The sheet goes for approval. Cards behind each line can be opened by the person who signs.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Shifts and attendance

Can a correction be traced to the right date and session?

For “Shifts and attendance”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.

Background reading: Frappe HR: attendance records

Rejections against the count

Who decides whether a failed result blocks the next step?

For “Rejections against the count”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

FAQ

Frequently asked questions

Can a biometric device at the gate feed attendance?

It can, where the make and model allow a feed. The device is checked during scoping and the link is quoted separately.

Are contract workers counted the same way?

Their shifts and output are recorded, but they sit under the contractor so the contractor’s bill can be checked against them.

Does it handle wage payment?

No. It supplies shift and output figures only. The wage working stays with your payroll clerk or your accountant.

Can one worker earn piece rate on several parts?

Yes. Every card the worker is named on contributes its own stage rate, and the period total adds them up.

Can piece rate and shift pay mix for one worker?

Both counts are supplied for a period, shifts attended and pieces passed. How they combine in the wage is worked out by your payroll clerk or accountant.

What if a worker disputes the count?

Open the cards the worker is named on for that period. Each shows quantity passed and rejected, so the argument is about specific cards rather than memory.

Are statutory registers produced here?

No. This module holds the attendance and output figures those registers draw on. The registers themselves and their filing are for your compliance adviser.

Can night shift be kept separate?

Yes. Shifts are set once for the unit, and attendance and output are listed against each.

Where it fits

How this feature fits the system.

Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Multi-level bill of materials and routing

Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.

Bill of Materials

Work orders and batch planning

Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.

Work Order Management

Work orders and batch planning

Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements