Skip to main content
GullySystem

Factory Job Cards by Production Stage

A job card belongs to one stage of one batch. The operator or the supervisor marks what passed, what failed and what went back for rework.

What a job card carries

Stage and work centre

The stage name your floor uses, and the machine, bay or line it ran on.

Quantity in and out

Pieces received from the previous stage, pieces passed on, pieces rejected and pieces held back for rework, each counted separately.

Operator and shift

Who ran the stage and in which shift, which later feeds piece-rate counting and the rejection view by operator.

Start and finish marks

When the stage was taken up and when it was handed on, entered by the person working it.

Notes and readings

A dimension checked, a weld run, a batch temperature or a filling weight can be written on the card where your part needs it.

How a batch moves on

Pieces passed at one stage become the quantity available at the next. The card at the next stage opens with that figure already in place, so a supervisor cannot claim more pieces than the previous stage cleared. Rejections drop out of the batch. Rework pieces go into a hold list and rejoin the batch at whichever stage the supervisor sends them back to, which keeps the final dispatch count honest.

Marking cards on the floor

On a phone or tablet

An operator or a supervisor opens the card, types the counts and saves it, without walking to the office.

At a shared terminal

Some sheds prefer one screen per section, where the supervisor marks every card for that stage at the end of a shift.

With a barcode on the card

For batch-heavy lines, a printed card with a barcode can be scanned to open the right record quickly.

What the client decides

  • Whether operators mark their own cards or a supervisor does it
  • Which stages need a reading or a measurement saved
  • Who may pass a rework decision at each stage
  • Whether a card can be edited after the shift closes

What a stage needs from the card

Put too many fields on a job card and it gets filled in from memory when the shift is over. Too few fields tell the owner nothing. Fit the card to the stage.

Cutting and sawing

Material issued, lengths cut and offcut returned. Few readings are needed.

Machining

First-piece result, tool change notes and the count at each operation. Dimension readings matter most here.

Welding and fabrication

Joint or weld checks, operator name and rework count. Add a coating thickness reading for coated parts.

Filling, moulding and packing

Weight or volume, batch temperature where relevant, and cartons packed with their label numbers.

Where job card data goes wrong

  • Counts typed in bulk at the end of the day, so timings mean nothing
  • Rework pieces not recorded, which hides the real loss at a stage
  • A shared login on the terminal, so no operator is named
  • Cards for a revised drawing printed from an old copy
  • Stages skipped on paper because the machine was down, then never explained

Reading the cards for a decision

Alone, the card is only a record. A stack of cards together is a picture of the floor. Pieces passed per shift show which section is keeping pace. Rejections by operator show where training is needed, but they also show where a machine has drifted, so look at the machine first. Time between start and handover shows queues rather than slow work. Owners who read cards weekly spot a stuck batch long before the buyer rings. Agree who reads them and when, otherwise the data collects and nobody acts.

A shift on the floor with job cards

A job card does its work between the first bell and the last. This page follows one shift in a small plant and shows who touches a card, when, and what they write on it. The cards are the day’s running record.

Cards handed out at shift start

The supervisor opens the stage list and assigns cards to operators by machine. Each card names the batch, the part and the quantity due. The rule is simple. An operator with no card at the machine asks first, and nobody starts a lot from memory.

Passed and failed at the machine

As the operator finishes a lot, the passed count and the failed count are entered on the card. A failed piece gets a reason. The next stage can see the true count before anyone carries parts across.

Rework sent back by the inspector

The inspector at the next stage finds a bore out of tolerance and marks those pieces for rework. The card returns to the earlier stage with the reason attached. The fault is seen at once. No walk across the shop is needed.

Closing the day’s open cards

At shift end the supervisor scans the list for cards still open. Each is either closed, held with a note, or carried to the next shift. Next morning the planner reads the same list. Held cards are named.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What a job card carries

Which observation would change the proposed scope?

For “What a job card carries”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

FAQ

Frequently asked questions

Can one operator work on several cards in a shift?

Yes. Cards are listed by stage and machine, and an operator can be named on every card the shift ran through.

What if a count is entered wrongly?

A correction is allowed within the limits you set, and the card keeps the earlier figure with a note of who changed it.

Does a card show the drawing?

The drawing or sketch held on the part revision can be opened from the card, so the operator sees the right version.

Can contract labour mark cards?

Yes, where you give them a login. Keep marking with the supervisor and name the contract worker on the card.

How many fields should a card have?

As few as the stage truly needs. Passed, rejected and rework counts are the core, and a reading or two where the part demands them.

Can a card be printed for a batch?

Yes. A printed card can carry the part, batch and a barcode so the right record opens when scanned.

Who closes a card?

The person you choose, such as the stage supervisor. Closing hands the passed quantity on to the next stage.

What if a machine breaks mid-batch?

The remaining pieces can be moved to another work centre and the card follows. The reason for the move can be noted on it.

Where it fits

How this feature fits the system.

Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Multi-level bill of materials and routing

Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.

Bill of Materials

Work orders and batch planning

Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.

Work Order Management

Work orders and batch planning

Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements