Manufacturing Software Views for Owners, Planners and Supervisors
A unit has several people handling one batch, from the enquiry to the lorry. Each person signs in to the screens that part of the batch needs, and no more.
One batch, five roles
Through a working day
An enquiry arrives with a drawing and the office quotes it. A planner releases a batch against a confirmed order, and the store issues bars and fasteners for it. Supervisors mark the cards as the batch clears each stage. Material leaves for plating in the afternoon and comes back short by a few pieces. At closing, the dispatch clerk loads a lorry against two order lines and prints the challan and the invoice for them.
At month end
The owner reads production made, rejection by stage, material consumed against the material list and job work charges. The accountant reads sales, purchase and stock figures from the same records. Supervisors see what their section put out. Planning compares promised weeks against the weeks actually dispatched, which is the honest test of whether the floor is keeping up with sales.
What the client decides
- Which roles exist in your unit and who holds them
- What each role may release, edit, cancel or write off
- Who may approve a rate, a rejection or a job work loss
- Whether rates and buyer names are visible on the floor
- Which machines or sections a supervisor can read
How to decide who sees what
Fewer screens per person means fewer wrong entries. Role dashboards work best when each shows only a few measures that person acts on, rather than everything at once.
Small unit habits that cause trouble
- One shared login for the whole office
- The owner doing the storekeeper entries on the side
- Rates visible to the floor, causing quarrels
- A person leaving the firm with their login still active
- Permissions never reviewed after the first week
A day-one setup for a unit of thirty
Take a typical shop. One owner, one planner, three supervisors, a storekeeper, a dispatch clerk and an accountant. That is eight people and about five roles. Write each role on a sheet with the screens it opens and the actions it may take. Go through it with the owner in an hour. Names go in after. Most arguments about permissions are really arguments about trust, and having the sheet on the table brings them out early, when they are cheap to settle.
What each role opens through the day
A role view is easy to describe and hard to picture until a day is walked through. This page follows five people at a small unit and names the screen each opens first. Some screens are never opened. Each role stays short.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Production planners
Is the plan based on demand that is still open?
Review “Production planners” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Accounts and dispatch
Can you explain the balance from its original documents?
Select a partly settled example in “Accounts and dispatch”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.
Background reading: ERPNext: outstanding invoices
Frequently asked questions
Can a supervisor see buyer rates?
The owner decides that. Show the floor only part, quantity and date, and keep rates with the office.
Do operators need a computer in the shed?
No. A phone or a shared tablet at the section is enough for marking cards and reading the queue.
Can a second plant be kept separate?
Yes. Each plant holds its own work orders and store, and the owner reads both together.
Who changes what a role can open later?
Our staff edit a role when you ask. The first set of permissions is worked out while the unit is being set up.
Can a supervisor also hold the stores role?
Yes. In a small unit the owner is planner and approver too, and one person can also carry two roles.
What happens when an operator leaves?
Their login is switched off, and the cards and entries they made stay in the record under their name.
Can a supervisor mark cards for another section?
Not without your permission. Section limits are set per role and can be widened for a shift cover.
Is a mobile view available for the planner?
The planner screens work in a phone browser, though long lists are easier on a larger screen.
How this feature fits the system.
Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Multi-level bill of materials and routing
Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.
Bill of MaterialsWork orders and batch planning
Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.
Work Order ManagementWork orders and batch planning
Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements