Skip to main content
GullySystem

Manufacturing · Software for pPE manufacturersTrace every mask, glove and gown from raw material lot to the buyer’s delivery.

PPE manufacturing software holds each production lot as one record, from the nonwoven roll received to the carton shipped. Filtration, seam and fit results stay with the lot. Distributor, hospital and industrial orders draw from one stock. Which lot did this box come from? One search answers it.

At a glance

A PPE manufacturer makes masks, nitrile gloves, gowns, coveralls, face shields, safety eyewear or protective footwear, in large lots for distributors and institutional buyers. Buyers ask for lot numbers, test reports and certificates with the goods.

Those papers live in separate places. A stock register, a quality file kept by one person, the sales team’s email folders. The software keeps them together. Each lot record follows your own lines, from melt-blown roll to packed carton. Auditors and hospital buyers then read the same chain the plant reads, from the supplier lot of fabric through the welder and the lab test to the carton label.

How the work runs today

Raw material arrives as rolls of spunbond and melt-blown fabric, nitrile compound, ear-loop elastic, nose wire, lenses or leather. Stores check it at the gate and record the supplier lot. Planning turns confirmed orders into runs for each line, with a target quantity and a shift. Operators run the ultrasonic welders and dipping lines. Quality staff pull samples at set intervals, and a lot is released only when its checks are complete.

Finished goods are packed. Inner boxes, then cartons, each labelled with the product code and lot. Dispatch follows the buyer’s schedule. Some buyers want test reports with every shipment. Others tender once a year and call off in parts. Returns must match the lot. Otherwise a pinhole fault in one glove batch becomes a recall of everything. Audits are blunt. A hospital procurement team may ask for the lot history of one carton of gowns delivered last year, with its test report and source roll. The answer is expected the same day.

Where it breaks

What goes wrong for pPE manufacturers without a proper system.

Lots are not tied to raw material

The supplier lot of a melt-blown roll or a nitrile compound sits on the goods receipt note. Matching it to one finished carton months later means a search through paper, a call to stores and a guess about which shift ran it. By the time a complaint reaches the plant, the fabric has been welded into masks, the lot has shipped, and the only people who remember the line settings are on another shift.

Test records sit apart from the lot

Bacterial filtration, seam strength, fit and tensile results sit on a lab sheet that belongs to one person. The buyer wants a report. Someone goes looking.

Production plans follow orders by phone

Lines are loaded from whatever sales last agreed. Nobody sees stock, welder hours or the elastic on hand that day. Changeovers between mask styles are guessed.

Certificates and expiry dates are scattered

Product certificates, test reports and shelf-life dates are separate documents. A renewal gets noticed only when a hospital tender asks.

Call-off orders are hard to follow

One large order, delivered in parts. Which part has gone, which is pending and what was billed sit in three lists. Nobody reconciles them until the buyer does. The pattern repeats whenever a tender changes, because every line, every label and every test sheet has to follow the new specification on the same morning.

What changes

What pPE manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Every carton traced to its fabric roll

A distributor reports a faulty box, and the quality head searches the carton number. The record shows the packing shift, the welding line and the supplier’s spunbond or melt-blown lot. Containment is limited to the affected lots. Other stock keeps moving to buyers. The quality head can answer within minutes.

Release only when the lot is complete

A lot stays on hold until filtration, seam and fit checks are all entered. The packing line cannot take it before then. Quality staff see every lot still waiting on a result. Nobody packs from guesswork. Releases follow a visible rule rather than a verbal go-ahead.

Certificates found before the tender asks

Test certificates, expiry dates and product approvals sit against each product and lot. When a hospital buyer asks for a document, the sales desk finds it quickly. Expiring approvals show on a list. Nobody scrambles on submission day. Audits go smoothly before any buyer’s deadline arrives.

One stock for hospital and industrial orders

Hospital call-offs, industrial supply and distributor orders draw on the same finished stock. Planning sees what is promised against what sits on the shelf. A large tender order no longer starves a regular customer unnoticed. Planners see this when setting each line’s shift and promises to distributors stay honest. Shortages show early.

Call-off orders followed to the last carton

Buyers who release a large order in parts get a running balance. Dispatch shows delivered, pending and invoiced cartons per call-off. Accounts bill each part from the dispatch record. Customers ask where their balance stands. The answer is on screen without a call to the dispatch office.

What the software does

What we would build for pPE manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Buyer accounts and tender orders

Hold distributors, hospitals and industrial buyers as accounts, with their orders, delivery schedules and price lists.

Product specifications and bills of materials

Define each product with its materials, quantities and packing, so a run draws the right stock.

Production planning by line

Load confirmed orders onto lines and shifts, with material on hand and machine hours shown before the plan is fixed.

Raw material lots and goods receipt

Record material received against each purchase order, with the supplier lot, and check it at the gate before it enters stock.

Lot traceability and quality records

Tie each finished lot to its material lots, its in-process checks and its release, and keep test reports with the lot.

Certificates and documents

Keep product certificates, test reports and shelf-life dates against each product, with a reminder before a document lapses.

Dispatch, call-offs and invoices

Dispatch against the buyer’s schedule, track call-off balances on large orders, and raise tax invoices from what has actually shipped.

Sterilisation batch records

Gown and mask lots sent for sterilisation are logged with the cycle date, the processor and the indicator result. A release or a hold is decided. Packers see only released cartons.

Fit test and leak test log

Respirator samples are fit tested on a panel and leak tested at set intervals, with the operator and result noted. Failures hold the lot. Audit visits read the history.

Shelf life and expiry stock

Masks, gloves and gowns carry a manufacture and expiry date by lot. The warehouse picks the oldest first. Sales gets a near expiry list, so those lots move before they lapse.

Before you talk to a supplier

A requirements checklist for pPE manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules pPE manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Order Management

Hospital tenders, distributor orders and industrial contract buyers all draw from the same stock of masks, gloves and gowns. Call-offs against a standing order reduce its open quantity. Sales sees what remains to ship.

Learn more

Bill of Materials

One mask style lists spunbond, melt-blown layer, ear loop elastic, nose wire and carton board, with the allowance for trim waste. Change the elastic and the old version stays on record. Planning reads the live one.

Learn more

Production Planning

Lines for ultrasonic mask welding, nitrile dipping and gown sewing each get a run with a target quantity and shift. Planners see which line has no roll stock behind it. A rush hospital order can be slotted in.

Learn more

Work Order Management

A run on the welding line is opened with the style, the roll lots issued and the quantity wanted. Operators report output and rejects per shift. Closing it posts finished boxes to stock.

Learn more

Batch and Serial Tracking

Every production lot ties the melt-blown roll supplier lot to the cartons shipped. A buyer asking which lot a box came from gets one search. Affected cartons are listed by distributor.

Learn more

Quality Control

Filtration, breathability, seam strength and glove pinhole checks are logged at sampling points on each lot. A lot is released only when every check is complete. Failed samples keep their reason.

Learn more

Goods Receipt (GRN)

Rolls of nonwoven fabric, nitrile compound, nose wire and elastic are counted at the gate against the purchase order. The supplier’s lot number is typed in and kept. Short or damaged rolls are noted at once.

Learn more

Document Management

Test reports, conformity certificates, tender papers and factory audit files are filed by product style and lot. A buyer asking for a certificate gets the current one. Expired certificates are flagged.

Learn more
AI by department

Where AI can help pPE manufacturers.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Raw material lots and goods receipt

Does receiving less than ordered leave the correct quantity open?

Bring a short delivery to the “Raw material lots and goods receipt” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.

Background reading: ERPNext: purchase receipts

Dispatch, call-offs and invoices

Can a partial delivery be distinguished from a completed order?

For “Dispatch, call-offs and invoices”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Common questions

Questions pPE manufacturers ask before they call.

Can each finished carton be traced to a raw material lot?

Yes. Material lots are recorded at receipt and linked to each production run. A finished lot then shows the rolls, checks and release behind it.

Can test reports be kept with the lot they belong to?

Yes. Results from in-process checks and lab tests are saved against the lot. A report can go to a buyer from the same record.

Does it handle large orders delivered in parts?

Yes. A tender or blanket order holds a total quantity, and each dispatch draws it down. Sales and the plant both see the balance still to ship.

Does it make a product compliant with a standard?

No. It records the checks, documents and lots your quality system calls for. The standards and certificates your products fall under are something we go through with you during setup.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements