Quality checks and test records for PPE lots
A PPE lot is released only when its checks are complete. Quality checks and test records hold the in-process checks, the sample tests, the attached lab results and the release or hold decision against the lot. Quality staff, planners and dispatch read one record rather than a folder of sheets.
Who records a check and who reads the result
Quality results are written by a few people and read by a wider group. The inspector writes, the lead decides, and the rest wait on the answer. Planners and dispatch need the outcome. Each needs a different part of the lot’s record.
Checks, tests and decisions held per lot
A lot gathers its evidence as it moves from run to release. In-process checks are made on the line. Sample tests are made on units pulled from the lot. The release decision closes the file, and lab results sit with the tests they belong to.
A day in quality, from line check to release
The day begins with a first-piece check on a new run. Through the shift inspectors log readings and pull samples. Late in the day a lab report arrives for an earlier lot. The lead decides each one. By evening one lot is released and another is held.
Quality decisions to settle before the first lot
Quality records carry weight in a dispute, so their rules matter. Settle what is checked, by whom and with what authority before the first lot is entered. Settle them with your lead. GullySystem staff then build the forms.
Limits of quality records in PPE production
This record shows what was checked and what was decided. It does not carry out a test. It does not replace a laboratory or tell you which standard a product must meet. Those questions belong to your quality lead and your regulatory adviser. Releasing is a judgement. A release is only as sound as the checks behind it. A small workshop making a few items can use a quality sheet and a signed log.
Quality results joining lots, documents and complaints
Quality sits on the lot. It connects to everything that touches the lot. Work orders supply the checks to record, goods receipt supplies the gate results and dispatch waits on the release. The document register and complaints read the same results later, long after the lot has shipped.
- Work orders carry the in-process checks made on the line
- Gate check results arrive from raw material goods receipt
- Release decisions open lots to dispatch and invoicing
- Test reports feed the certificate register for each product
- Complaints reopen the checks recorded against the lot
Frequently asked questions
Can a lot be released with a test pending?
That is a rule for your quality lead to set. Nothing is hidden. The list shows which tests are complete and which are pending. A release against a pending test is then a visible decision with a name on it.
Can checks differ between mask and glove lines?
Yes, checks and test fields are set per product, so a glove lot asks for different readings from a mask lot. GullySystem staff configure them with your quality lead. Changes follow when you ask, for each product.
What happens to a lot on hold?
A held lot stays on the list of lots awaiting release, with its reason. It is not counted as available stock. The lead can later release it, retest it or reject it. Each step is written down.
Can we see test results by product?
Test results can be read by product and by lot. That lets the quality lead see whether a reading is drifting across several lots. What counts as drift is the lead’s call. The figures are there to read.
Who signs the release decision?
The name entered is the person logged in when the decision is made. Which roles may decide is set before go-live with your lead. The record shows who, when and why. Nobody signs for someone else.
How this feature fits the system.
PPE Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Buyer accounts and tender orders
Large and part-delivered orders are held with their schedules, so sales can see the quantity shipped and the balance still owed to the buyer.
Order ManagementProduct specifications and bills of materials
Each mask, glove or gown lists its fabric, compound, elastic and packing quantities, so a production run issues the correct material.
Bill of MaterialsProduction planning by line
Confirmed orders are loaded onto lines and shifts against material on hand, so changeovers and shortages show before a run is fixed.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements