Raw material lots and goods receipt for PPE

Fabric, compound, elastic and packing reach a PPE plant on supplier trucks with a lot number on the slip. Goods receipt records each delivery against its purchase order and keeps that lot number. Material is checked at the gate and released to stock only when it passes, so every run draws known material.

Gate, store and lab around each delivery

Every delivery crosses three desks before it reaches a shelf. The gate counts it, quality looks at it, and the store puts it away. Purchasing waits to hear whether the order can close. Each desk sees its own step.

For storekeepers receiving at the gate

The storekeeper opens the purchase order, enters the quantities received and records the supplier lot from the slip. A short delivery shows against the order at once, before the truck has left the yard. The gate counts. The check decides release.

For quality staff checking arrivals

Quality staff inspect the delivery at the gate and record the result against the lot. A roll that fails is held, not released. The supplier then receives a complaint backed by a record, not a recollection.

For purchasing closing the order

Purchasing reads what has arrived against what was ordered and follows up on any balance still due. A delivery on hold stays visible on the order. Chasing the supplier starts from the lot number and the reason. The paper trail is already there.

For planners waiting on material

Planners see whether material for a planned run is received but not yet released. A roll on hold gives no cover for the run that needs it. Material that cannot be used never props up the plan. Cover means released stock.

Details kept for each delivery received

Every receipt is tied to a purchase order and a supplier lot. The record notes what arrived, in what quantity and in what state. The result of the gate check sits beside it. The release decision is the last entry.

Purchase order and supplier

Each receipt names the purchase order, the supplier and the delivery slip number. Quantities ordered and received sit side by side. A partial delivery leaves a balance on the order. The slip is matched, not taken on trust.

Supplier lot and roll numbers

The lot number on the supplier’s slip is entered, with roll or drum numbers where the supplier marks them. This is the number a later complaint will quote. It travels with the material into stock and into runs. Nothing needs retyping.

Gate check results

The inspection at arrival is recorded with its result and the name of the person who made it. The checks themselves are configured with you, to match your own procedure.

Hold, release and storage location

Material stays held until it is released, and the decision is written with its date. Released material is put into a storage location chosen at that point. Held material sits apart. It is not issued.

A delivery day at the receiving bay

A truck arrives with nonwoven rolls before the shift changes. A purchase order waits to be matched, a quality lead is on call and the store holds shelf space. By evening the delivery is either released or held. That is the whole day’s outcome.

Arrival: matching the slip

The storekeeper finds the purchase order for the nonwoven rolls and enters the quantity counted. The supplier lot is typed from the slip, along with the delivery slip number. A short count shows against the order immediately. Purchasing is told.

Inspection: a roll fails

Quality finds damaged edges on one roll and records the failure against the lot. That roll is held. The others pass. News goes to the supplier with the lot number attached, and the reason is written down.

Release: shelving the lot

Once the checks pass, the storekeeper releases the lot and sets its storage location. Cover for tomorrow’s planned run now includes it. The shelf label and the record agree on where it sits. A picker finds it.

Chasing a short delivery

A compound delivery arrives with fewer drums than ordered. Purchasing sees the balance still due and calls the supplier. The purchase order stays open until the rest arrives. Nobody searches a file for the slip.

Receiving rules to settle with your stores team

Receiving works when the gate follows one routine. Agree it with your storekeeper and quality lead before the first delivery is entered. Agree the routine first. The screens are then built to match.

Which deliveries need a gate check

Fabric and compound may be checked on every lot, while cartons are checked on sight. Decide which materials get a recorded inspection and which do not. A check nobody fills in is worse than none. Keep each check real.

Who may release material to stock

Name who can release a held lot, and whether quality alone can. Release makes material available to planners and stores for the next run. A rule that lets anyone release defeats the gate. Choose one name or role.

What to do with over-delivery

A supplier ships more than was ordered. Decide whether the excess is accepted, returned or booked against a later order. Purchasing and the owner should agree this before such a delivery turns up at the gate.

How supplier lot numbers are keyed

Supplier lot formats differ from one mill to the next. Decide how the lot is typed, with or without roll numbers, and who checks the entry. A mistyped lot breaks the link to the finished goods. Check it twice.

Where receipt records give way to your own inspection

The receipt records what was counted and checked. It does not inspect the material, and it does not set the quality standard for a roll or a drum. Supplier contracts, claims for damaged goods and payment of supplier bills stay with the owner and the accountant. A plant buying small quantities from one supplier can use a receiving book.

Receipts connecting purchasing, stock and traceability

This feature sits between buying and making. It closes the purchase order raised in supplier purchasing, puts released material into stock and gives each run a lot to draw from. The lot number it records is what traceability follows later, from the finished carton back to the roll.

  • Purchase orders from supplier purchasing are received against
  • Released lots enter stock at a warehouse location
  • Work orders issue material from the lots received
  • Supplier lot numbers feed lot traceability forward and back
  • Gate check results join quality checks and test records
FAQ

Frequently asked questions

Can material be received as a part delivery?

Yes, a partial delivery is recorded against the purchase order and the balance stays open. Purchasing sees what is still due. It can chase the balance. The released part is available to the plan straight away, so a run need not wait for the whole truckload.

Is the supplier lot kept after material is issued?

Yes, the supplier lot is kept with the receipt and linked to each run that draws from it. It appears again on the finished lot. Lot traceability follows exactly this number, so it must be typed with care at the gate.

What happens to material that fails the gate?

It stays on hold. No run can draw it. The failure is recorded against the lot with the reason given by quality. Purchasing and quality then agree what to tell the supplier, and whether the whole lot or one roll is affected.

Can receipts be entered without a purchase order?

Whether such receipts are allowed is a rule you set. A receipt without an order leaves purchasing blind to what was agreed with the supplier. Raising the order first is the safer rule. Set it before go-live.

Can a label be printed for a received roll?

Barcode and label printers can be linked, and label layouts are set up with you. A label carrying the lot and the location helps the store find the roll. Which fields appear is your choice.

Where it fits

How this feature fits the system.

PPE Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Buyer accounts and tender orders

Large and part-delivered orders are held with their schedules, so sales can see the quantity shipped and the balance still owed to the buyer.

Order Management

Product specifications and bills of materials

Each mask, glove or gown lists its fabric, compound, elastic and packing quantities, so a production run issues the correct material.

Bill of Materials

Production planning by line

Confirmed orders are loaded onto lines and shifts against material on hand, so changeovers and shortages show before a run is fixed.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.