Work orders and shift output in PPE plants

Each production run in a PPE plant starts with a work order that names the product, the line and the target quantity. Operators log output and rejects by shift against it. The factory head and the planner read progress from the record, not from a walk of the floor and a few spoken reports.

Who reads a work order, and why

This order passes through several hands in a shift. Operators write to it, stores issue to it, and quality samples against it. The planner watches the total.

For planners following the target

Planners read output against target for every open work order and see which runs are behind. A short shift is spotted while the next one can still catch up on it. The plan is adjusted on facts. Rumour plays no part.

For the factory head watching rejects

The factory head reads rejects and rework by line and shift to see where waste is building. A line with a rising reject count gets attention before a buyer complains. Where to act remains a judgement call.

For quality staff sampling a run

Quality staff open the work order to find which lot a run belongs to and which checks fall due. Samples are taken against that lot. An odd reject count prompts a visit to the line. The answer goes back on the order.

For stores issuing against the order

Stores issue fabric, compound and elastic against the work order, so the material drawn for a run is on record. A second issue for the same run shows as an extra. The storekeeper can explain it.

Entries held on each work order

Every order is opened for a run and closed when that run is done. In between it collects what each shift produces and what it throws away. It also holds the target, the dates and the material issued. Operators and supervisors make the entries.

Product, line and target quantity

The work order names the product from its specification, the line it runs on and the quantity to be made. The delivery it serves is shown beside it. Without a target nothing can be called behind.

Output logged by shift

At the close of a shift, the quantity made is entered against the order with the shift and the line. Two shifts on one run show as two entries. The running total updates for everyone reading.

Rejects and rework with reasons

Units that fail are logged as rejects or sent for rework. Each carries a reason, such as a pinhole in a glove or loose elastic on a mask. The reason is typed once, at the line. Quality reads the pattern later.

Material issued and lot numbers

The fabric, compound and elastic issued to the run are listed with their lot numbers. This ties the run to its material lots from the first day. Traceability later needs nothing re-entered. Nothing is typed twice.

A shift on the line, from issue to handover

A shift begins with a work order and ends with a handover. In between the machines run, rejects pile up and someone asks how far the run has got. The record answers that question. Nobody has to walk across the floor first.

Start: the supervisor opens the run

The line supervisor opens the work order, checks the material issued and confirms the target for the shift. The order is now live for planning and quality to see.

Mid-shift: output is entered

An operator or supervisor enters the quantity packed so far, with the line and the hour of the entry. Planning sees progress against the target without leaving the desk. Any run that is behind is noticed early.

A reject count climbs

Rejects on one machine rise during the shift, and the supervisor logs each with a reason. Quality reads the entries and walks to the line with a clear question. The fault is found early. The run is still open.

Handover: the next shift picks up

The next shift opens the same work order and sees what is made, what is rejected and what remains. The material still to be issued shows too. No notes travel on paper. The shift target is simply the unfinished balance.

Work order rules to settle before go-live

Work orders are trusted only when everyone logs the same way. Settle how output is counted and who may close a run before operators start. GullySystem staff set these up with you. Settle the counting rules first.

What counts as good output

Decide whether output is counted when units come off the machine or when they are packed. The two differ by the rejects caught at packing. Pick one point. Then shifts do not report different numbers.

Who may close a work order

A run is finished when its target is met, a buyer cancels, or material runs out. Decide who may close it, and what must be logged before closing. Output comes first. A half-closed order muddies the line plan.

How reasons for rejects are listed

A short fixed list of reasons gives patterns. Free typing gives nothing to count. Agree the reasons for each product with the quality lead, and who may add one to the list. GullySystem staff configure them when you ask.

When over-production is allowed

Output can pass the target, because cartons fill up or a buyer allows a margin. Decide whether the extra is accepted against the work order or opens another. Decide it once. It affects stock and invoices.

What shift output records do not decide

Work orders record what the line reports. They do not count a carton or inspect a seam, so the figures are only as accurate as the people entering them. They do not read machine counters. Wages, overtime pay and bonus schemes are for the owner and the accountant to settle. A plant with a single machine can run on a daily tally sheet.

Work orders linking plans, stock and quality

Each order is the link between the plan and the shop floor. It opens from a fixed line plan and draws the material the bill of materials lists. Output and rejects flow on to stock, quality and dispatch. Everything entered on it is read again later.

  • Fixed runs from production planning open as work orders
  • Materials listed in the bill are issued to the order
  • Finished output moves into stock by warehouse location
  • Rejects and results reach quality checks and test records
  • Lot numbers on the order feed lot traceability
FAQ

Frequently asked questions

Can an operator enter output from the line?

Which staff enter output is agreed during set-up, for example an operator at the line or the shift supervisor. The entry names the line and shift. Entering it where the work is done keeps the total current.

How are rejects and rework kept apart?

A unit sent back for rework is logged differently from one scrapped, each with its reason. The reports on rejects and rework by line and shift read both. The two are never mixed in one figure.

Can one work order cover two shifts?

A run that lasts beyond one shift keeps a single work order, with output logged by shift under it. Each entry shows the line and the shift. The running total sums them. Nobody adds them by hand.

What if the target is not reached?

The shortfall shows as the balance on the work order. Planning decides whether to add a shift, open a new order for the balance or tell sales. The system displays it. Management settles the choice.

Does output update stock as it is logged?

Output logged on a work order counts as work in progress until its lot is released. After release it is finished goods. Stock by location shows each stage, so a store never counts unreleased cartons as sellable.

Where it fits

How this feature fits the system.

PPE Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Buyer accounts and tender orders

Large and part-delivered orders are held with their schedules, so sales can see the quantity shipped and the balance still owed to the buyer.

Order Management

Product specifications and bills of materials

Each mask, glove or gown lists its fabric, compound, elastic and packing quantities, so a production run issues the correct material.

Bill of Materials

Production planning by line

Confirmed orders are loaded onto lines and shifts against material on hand, so changeovers and shortages show before a run is fixed.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements