Production planning by line for PPE plants

A PPE plant runs masks, gloves and gowns on lines that share shifts, machines and stores. Production planning loads each confirmed order onto a line and a shift. It shows material on hand and machine hours before the plan is fixed, so the store is not the first place a shortage is found.

Planners, owners and stores around the line plan

Each morning the line plan is argued over. The planner builds it, the store says whether material is there, and sales wants dates. The outcome goes to the factory head. All of them look at the same plan.

For planners fixing the plan

Loading confirmed orders onto lines and shifts, the planner sees material on hand and machine hours, including changeover time, before fixing anything. A line already full is plain to see. Confirmation waits for the figures.

For stores warning of shortages

Stores see which planned runs will draw fabric, compound or elastic and check each against stock on the shelf. A shortfall is flagged to purchasing before the shift, not during it. The warning reaches the right desk.

For sales promising delivery dates

Sales looks at the line plan before telling a buyer when a tender can ship, whether a hospital or a distributor. A date that depends on a second shift is visible. Sales promises only what fits.

For the factory head reading line load

The factory head reads how full each line is across the coming days, which lines are idle and where a changeover is due. Shifts can be moved before overtime is needed. Staffing decisions stay with the factory head.

Entries that make up a line plan

Each plan is a set of commitments, and each one is written down. It names the order, the buyer, the product, the line, the shift and the quantity. Material and machine hours sit beside it. Changes are made by whoever the rule names.

Order lines awaiting a slot

Confirmed order lines come across from buyer accounts with product code, quantity and delivery date. Lines not yet placed wait in a queue the planner works through. Tender call-offs appear as separate lines against the same total. Each line keeps its buyer’s name.

Line and shift allocation

Each run is assigned to a line and a shift with a planned quantity. Masks, gloves and gowns run on different lines, so the allocation shows where each product is made. Idle shifts show too.

Machine hours and changeovers

Hours a run needs on a machine are held against the line, with time for changing from one product or size to the next. A plan that ignores changeover time looks full on paper. This record shows the true load.

Material cover for each run

Next to each run sits the material it will draw from the bill of materials and the stock on hand. Cover shows as enough or short. Shortages carry through to purchasing without anyone retyping the quantity.

Planning day by day on a PPE floor

New orders reach the planner from sales through the day. Some fit a free shift. Others push a run back. By evening the plan has moved, and everyone who depends on it needs to see where it landed. Stores and quality wait on the result.

Start of shift: placing new orders

Opening the queue of confirmed orders, a planner drops a mask run into the first free slot on line two. Material and machine hours show at once, beside the order. The slot holds because stock is there.

Midday: a rush order from a hospital

A hospital asks for gowns sooner than planned. A planner sees which run would give way and what material the rush draws. Sales hears the new date before the buyer is told. A swap is made on screen.

Afternoon: a material shortage appears

Stores report that elastic is short for tomorrow’s run. The plan shows which runs draw it, and the planner moves a glove run forward instead. Purchasing raises an order for the missing roll. The gown run waits.

Evening: confirming the next day

Before leaving, a planner fixes the next day’s runs and shifts, and supervisors read them while still on site. Work orders follow from the confirmed plan. Anything not fixed stays visible as open. Nobody guesses at the morning.

Rules to agree before the first line plan

Planning is only believed when its rules are known. Agree them with GullySystem staff while your lines and shifts are being laid out. Agree them early. Arguments later are about rules, not data.

Who may move a confirmed run

Once a run is fixed, moving it affects stores, quality and a buyer waiting. Decide who may reorder confirmed runs and whom they must tell. A hospital deadline may outrank the plan. Someone must decide that.

How changeover time is counted

A line moving from gloves of one size to another loses time on the changeover. Agree whether changeovers are entered as set blocks or per product pair. The count sets how full a shift looks. Keep it consistent.

How much of each line stays unplanned

Some shifts are kept as slack for rework and rush orders from hospitals. Decide how much of each line stays open. Leave none, and every shift fills. The first rush order then breaks the plan.

Whether short material blocks a run

Decide whether a plan with missing material can still be fixed, or whether the run is held. Some plants fix the run and let purchasing chase. Others refuse until stock arrives. The factory head decides.

What line planning leaves to the factory floor

The plan shows what fits and what is in stock. It cannot foresee a breakdown. Nor can it know that an operator is absent. Choosing between two buyers who want the same shift stays with the factory head and the owner. A plant with one line and one product can plan on a wall board.

Line plans reading orders and handing out work

It takes confirmed order lines from buyer accounts and quantities from the bill of materials. It hands runs to work orders and shortfalls to supplier purchasing. Quality and dispatch then work to the dates the plan set for each run.

  • Confirmed order lines arrive from buyer accounts and tenders
  • Material needs come from each product’s bill of materials
  • Stock on hand is read from warehouse locations
  • Fixed runs become work orders for each shift
  • Shortfalls pass to supplier purchasing as planned requirements
FAQ

Frequently asked questions

Does the plan show machine hours before confirming?

Yes, machine hours and material on hand are shown before the plan is fixed. A run can then be moved to another line or shift. Nothing is confirmed on a hunch. Both figures are on screen at the point of choice.

Can one large order be split across two lines?

A large order can be placed as several runs on different lines or shifts, each with its own quantity. The order total stays on the buyer account. Splits are agreed with your planner during set-up.

How does the plan react to a late delivery?

A late material delivery shows as short stock against the runs that need it. Planning then reorders the runs or waits for the delivery. Purchasing sees the same gap on its own screen. Nothing moves by itself.

Who sees the line plan on the floor?

Which roles read the plan itself and which read only work orders is agreed during set-up with your factory head. Supervisors need the next shift’s runs. Operators need their own. Planners keep the full picture.

Is the plan fixed once it is confirmed?

A confirmed plan can still be changed by whoever your rule allows. Stores, quality and sales then read the amended plan. Agree that rule first. A late move disturbs every desk that has already prepared.

Where it fits

How this feature fits the system.

PPE Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Buyer accounts and tender orders

Large and part-delivered orders are held with their schedules, so sales can see the quantity shipped and the balance still owed to the buyer.

Order Management

Product specifications and bills of materials

Each mask, glove or gown lists its fabric, compound, elastic and packing quantities, so a production run issues the correct material.

Bill of Materials

Production planning by line

Confirmed orders are loaded onto lines and shifts against material on hand, so changeovers and shortages show before a run is fixed.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements