Lot traceability for PPE masks, gloves and gowns
When a buyer reports a fault, the first question is which lot it came from and what went into it. Lot traceability links each finished PPE lot to its material lots, its machine run and its dispatches. Quality and dispatch can then follow a lot forward to buyers or back to suppliers.
Who traces a lot and what they look for
Tracing is rarely calm. A buyer is waiting on the phone, or a supplier has just reported a bad roll. Whoever asks needs the same chain, read from either end, and needs it now.
Links held between material, run and dispatch
A finished lot is a point with links in both directions. On one side sit the material lots and the machine run. On the other sit the dispatches and the buyers. Each link is made as the event happens. It is not rebuilt later from paper.
A supplier alert and a buyer complaint, traced
Two calls arrive in the same week. A supplier warns that a lot of nonwoven roll had a defect, and a buyer reports damaged gowns on the same day. Each starts from a different end of the same chain. The links answer both.
Traceability choices to make before the first lot
A chain is only as strong as its weakest link. Decide how lots are numbered and what level of detail is recorded before production moves onto the system. Gaps cannot be filled afterwards.
Limits of a lot trace in a real recall
The trace shows which lots and buyers are linked. It does not prove what caused a fault. It does not decide a recall. That judgement, and any notice to a regulator or a buyer, belongs to the owner, the quality lead and legal advisers. Records are only as complete as the entries made. A maker with a single product and a handful of buyers can trace from a batch book.
Traceability drawing on every earlier record
Traceability reads from receipt, work orders and dispatch. It feeds quality, complaints and recalls. Material lots come from goods receipt, run details from work orders, and the buyers’ destinations from dispatch. The chain is not a separate file kept by hand. It cannot drift from the facts.
- Supplier lots arrive from raw material goods receipt
- Work orders supply the line, shift and run details
- Quality checks and test results attach to each lot
- Dispatch records supply buyers and cartons shipped
- Complaints and recalls start from the lot number
Frequently asked questions
Can we trace forward from a supplier lot?
Yes, a supplier lot leads to the runs that drew it, the finished lots that resulted and the buyers who received them. The list is read, not compiled by hand. It starts from one number.
Does traceability need barcodes on cartons?
Cartons carry the product code and lot number on a label. Barcode and label printers can be linked if you want scanned labels, and the layouts are agreed with you. A barcode is optional. Plain text prints too.
What if a lot used two supplier lots?
Both supplier lots are linked to the finished lot. A trace from either one reaches that lot. The record shows how the run drew from each, so the answer is complete and a recall list does not miss a carton.
How far back does a trace go?
A trace goes as far as lots were recorded. That is simple. Material received before go-live and entered without a lot number cannot be traced beyond its receipt. Decide at set-up which older stock is loaded with lots.
Who can see the whole chain for a lot?
Access follows the roles you set up. Quality, dispatch and the owner can read the whole chain, while other staff see only their own step. The rule is yours. GullySystem staff then configure it for you.
How this feature fits the system.
PPE Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Buyer accounts and tender orders
Large and part-delivered orders are held with their schedules, so sales can see the quantity shipped and the balance still owed to the buyer.
Order ManagementProduct specifications and bills of materials
Each mask, glove or gown lists its fabric, compound, elastic and packing quantities, so a production run issues the correct material.
Bill of MaterialsProduction planning by line
Confirmed orders are loaded onto lines and shifts against material on hand, so changeovers and shortages show before a run is fixed.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements