Skip to main content
GullySystem
Manufacturing · Software for industrial rubber parts manufacturers

Every rubber part tied to mould and cure.

Gaskets, bushes, diaphragms, grommets, O-rings and rubber-to-metal mounts are pressed in compression, transfer or injection moulds, cured, deflashed and checked against a gauge. Industrial rubber parts software ties each part number to the compound lot, rheometer result, preform weight, mould cavity, press and Shore A reading. Bonded parts also carry the insert and bond test.

At a glance

A rubber part leaves a hot mould with flash on its parting line and a cavity number moulded into its face. Behind it sit an EPDM or nitrile compound lot, a preform cut to weight, a cure time and, for a mount, a steel insert coated with bonding agent. Customers ask for all of it later.

Industrial rubber parts manufacturer software keeps those items on one job, so presses, moulds and the inspection bench read the same part record. Share your requirements, and one bush is traced from the mixing mill to the carton.

How the work runs today

A customer releases a monthly schedule for gaskets, bushes, diaphragms and engine mounts, and the planner converts it into press runs by mould. A sixteen cavity tool cannot be moved lightly, so the planner also checks mixed compound stock against the rheometer release before any run is fixed on the board. Preforms are cut from strip or extruded to a set weight, weighed on the bench and loaded into the cavity. For bonded parts, a steel insert goes in first, after it has been grit blasted, degreased, primed with bonding agent and left to dry on a rack.

The press operator sets platen temperature and cure time, closes the tool and unloads the shot, and trimming follows by hand knife, by tumbling or by cryogenic deflashing. At the bench the inspector reads Shore A hardness, checks the bore against a go and no-go gauge and tears a bonded sample to see where it fails. Parts are counted into cartons. Mounts get a label.

Where it breaks

What goes wrong for industrial rubber parts manufacturers without a proper system.

Compound lots are untraceable after the press

Mixed compound leaves the mill as slabs, which are cut into strips and preforms, and the batch number stays on the first slab alone. A returned bush cannot be traced.

Preform weight is set by feel

Short preforms make short fills with unfilled corners. Heavy ones push flash across the parting line. Weights are checked when the shift starts and then trusted for hours, while the cutter blade dulls and the strip thickness drifts.

Mould cavity wear goes unlogged

Cavities that have run thousands of shots start to throw oversize flash and clogged vent lines, yet the shot count lives on a hanging tag that gets updated when someone remembers.

Bonded parts lack a proof of adhesion

Blasting profile, primer thickness and flash-off time decide whether the rubber stays on the steel under load, and nobody records them per insert lot. The peel test is done and forgotten.

Schedules change faster than the press plan

A customer revises the monthly release halfway through, after mould changeovers, compound mixing and preform cutting have been planned for the old figure. The press crew hears last.

What the software does

What we would build for industrial rubber parts manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Compound lot and preform record

Hold each mixed lot with its rheometer and Mooney release result, then record preform weight checks against that lot and the press run that consumed it.

Mould and cavity register

Count shots per mould and per cavity, log repairs, polishing and vent cleaning, and flag a tool that is due back in the toolroom.

Press run and cure log

Record the press, platen temperature, cure time and shots made, and tie every part lot to the run that produced it.

Insert preparation and bond test

Note blasting, primer and drying for each insert lot, and save peel or pull tests with the bonded run so a mount can be traced.

Trim, hardness and gauge checks

Count rejects by cause such as short fill, backrinding or torn flash, record Shore A and gauge readings, and release or hold the part lot.

Customer schedule and dispatch

Load monthly releases, plan runs against them by mould and press, and print carton labels and delivery notes from the same record.

Before you talk to a supplier

A requirements checklist for industrial rubber parts manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for industrial rubber parts manufacturers.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

Industrial Rubber Parts Manufacturer Management Software

Compound batches, Mooney and rheometer checks, preform weights, cavity shot counts, press cures, insert bond peel tests and Shore A inspection for rubber parts makers.

See the product
Worldwide

Where we work with industrial rubber parts manufacturers.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Customer schedule and dispatch

Can a partial delivery be distinguished from a completed order?

For “Customer schedule and dispatch”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Preform weight is set by feel

Do purchasing, operating and billing quantities use the same unit?

Check the measurement unit and rounding used in “Preform weight is set by feel”. Compare the result with a known sample before accepting a converted quantity or calculated charge.

Background reading: ERPNext: units of measure

Common questions

Questions industrial rubber parts manufacturers ask before they call.

Does it cover bonded rubber-to-metal parts?

Yes. Insert lots, blasting and primer steps, and peel or pull test results are held against the press run that used them.

Can a multi-cavity mould be tracked?

Yes. Each cavity has its own shot count and reject log, so a worn cavity can be blocked at the press until the toolroom has repaired and polished it.

Can customer schedules be loaded?

Yes. A monthly release is entered, or imported from a sheet, and the planner converts it into runs by mould and press.

Do compound lots link to finished parts?

Yes. The mixed lot is recorded on the run, so every part lot made from it shows that compound on its label and its record, even months after shipment.

What do moulding system costs hinge on?

Your first parts, say compound lots or mould registers or cure logs, fix the starting figure. Think of presses, shifts and the staff count. Do mention a rheometer link. Cure logs can be priced alone.

Gathering for the moulding system: what first?

Bring compound lot records, a mould list, press cure logs and bond test sheets. Contacts from planning, the press shop and quality are needed. Copies of press cure logs are welcome.

Who owns the compound lots after we stop?

Compound lots, mould registers and cure logs all belong to the rubber shop, code included. Compound lots export as plain files. The moulding system builders keep supporting compound lots.

What happens after I share my requirements?

An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. A senior engineer reads your answers. Nobody phones first.
  2. Within one business day you get a written note: what we understood, what we would start with, and the questions we still have.
  3. If it fits, a proposal follows with the order of work, what we need from you and what you receive at each step.
  4. No call is booked and nothing is paid until you have read the note. Your details stay with us.

Start with your requirements

Seven short steps that tell us what you need. A senior engineer reads them before anyone gets in touch.

Share your requirements