Compound batches, mould cavities and bonded inserts on one record.

Hold customer releases, Banbury mixes, preform weights, mould cavities, press cures, grit blasting, cover cement and peel tests in one system. Every part lot keeps its rheometer check, its mould and its cure, so a returned bush or engine mount traces to one press run. Planners, mixers, press operators and inspectors share one record. Nothing sits on a tray tag.

  • Part list, moulds and cavity layouts entered from your own drawings and toolroom cards, with nothing renamed for the software
  • Open releases, compound stock and customer balances migrated before the first press run is booked
  • Label and inspection report layouts matched to each buyer’s own format and part number style

Plan press runs against customer releases and record each mix, rheometer cure curve, preform weight, cavity shot count and peel test from one GullySystem build. Every bush or seal lot keeps its compound batch, mould and cure, and Shore A results and labels print from the same record.

Where it breaks today

What goes wrong before the software.

Schedules are read from emails

Monthly releases arrive as spreadsheets and email attachments, the planner retypes them into a press plan, and a revision may never reach the bench, so the wrong quantity is moulded. Stock piles up.

Compound identity is lost at the strip stage

A mixed slab from the mill is cut into strips and then into preforms for the press, and after that the batch number depends on a note taped to a tray. Trays get swapped on the floor.

Preform checks are inconsistent

Operators weigh preforms at the start of a shift, but between checks the cutter drifts, and a light preform means a short shot while a heavy one means flash on every cavity. Nobody notices for hours.

Cavity and mould wear are guessed

Shots are counted on a tag or not at all, so the first sign of cavity wear is flash that the trimmers complain about. Hundreds of marginal parts have gone through the tumble deflasher. Too late.

Bond failures are found at the customer

Grit blasting, primer and cover cement go on in a separate area and nobody records the drying time. A weak bond shows up only when the engine mount is under load at the customer.

Inspection reports are typed from bench sheets

Shore A hardness, gauge dimensions and visual counts are written on bench sheets by hand, then retyped into a report for the buyer. A transposed digit reaches the customer unseen.

How it runs

How the work flows through it, step by step.

  1. 1

    Schedule and order

    A customer release is entered or imported by part number and week, and a revision replaces the earlier figures while keeping the date of change. The planner sees exactly what moved since Friday.

  2. 2

    Run planning

    The planner assigns each part to a mould and press, checks compound and insert stock, and sets the changeover order by mould size so heavy platen changes sit together. Shortfalls show before booking.

  3. 3

    Mixing and preforms

    Compound batches are released after their Mooney viscosity and rheometer cure check. Preforms are cut, weighed against the part target and linked to the batch, so each strip keeps its number to the press.

  4. 4

    Insert preparation

    For bonded parts, steel inserts are grit blasted, coated with primer and cover cement, and dried, and the steps, oven times and operator are recorded against the insert lot. Nothing reaches the press unrecorded.

  5. 5

    Press and trim

    Shots are cured in the press, counted and removed, then parts are trimmed or cryogenically deflashed and rejects are logged by cavity. Cure time and platen temperature stay with the run.

  6. 6

    Inspect and ship

    Shore A hardness, gauge and bond peel checks are entered at the bench, then passed lots are labelled, boxed and dispatched against the schedule with the paperwork coming from the same record. No retyping.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Part master and drawings

Hold each rubber part with drawing revision, compound grade, Shore A target, preform weight, mould and packing rule, so planners and operators work from the same data. Old drawings stay filed.

Customer schedules

Load monthly releases and revisions, compare them with stock and press runs, and show shortfalls by part and week. Every change since the last run is marked, so a cancelled lot is not moulded.

Compound lot register

Record each mixed batch with its Mooney and rheometer check, the weights charged and the preforms cut from it, and hold a scorchy batch by number before it reaches a press. Scorch is caught early.

Preform weight checks

Save weighed preforms against the run, flag light or heavy samples, and keep the history for the batch. Cutter drift is visible within a shift. No pallet of flash.

Mould and cavity register

Count shots per mould and per cavity, record polishing, vent cleaning and repairs, and mark a cavity out of use when the toolroom blocks it. Wear is planned from counts, not trimmer complaints.

Press run and cure log

Open a run on a press with platen temperature and cure time, count shots, and close it with good and rejected quantities. Post-cure oven loads are logged too.

Insert prep and bond testing

Track insert lots through grit blasting, primer, cover cement and drying, and keep the peel or pull result with the bonded run. Note whether the failure was rubber tear or at the metal.

Trim, flash and inspection

Record the trimming or deflashing method, rejects by cause such as backrind, short shot or porosity, and Shore A and gauge readings. Failed lots are held until a supervisor decides.

Outside processes

Send parts or inserts for plating, post-cure or bonding elsewhere, record the quantities out and back against one vendor job, and follow what is still with the vendor. Shortfalls stay open.

Labels, packing and dispatch

Print part labels, packing lists and the dispatch paper from the run, then post the invoice and the dues by customer. Cartons carry the compound batch number the buyer asks for. Nothing is typed twice.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Order Management

    Monthly releases and revisions are held by part and week, so the planner sees quantities that changed after the press run was already set.

  • Batch and Serial Tracking

    Each mixed batch is numbered and its preforms and press runs carry that number onto the finished part lot and its label.

  • Production Planning

    Runs are planned by mould and press from the release, with changeover order and compound stock checked before the platen is booked.

  • Quality Control

    Shore A, gauge and visual results are compared with the part limits, and a failing lot is held until a supervisor decides.

  • Job Work Management

    Parts or inserts sent for plating or bonding are listed with quantities out, and returns are booked against the same vendor job.

  • Bill of Materials

    A part lists its compound grade, steel insert, cover cement and packing, so planners know material needs before the run is set.

  • Fixed Asset Register

    Moulds are held as assets with cavity maps, shot counts, repairs and polishing, so toolroom work follows usage and not complaints.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners

See press hours, mould condition, schedule shortfalls, rejects by part and customer balances, and judge which compound or tool is costing money.

For planners

Convert releases into runs, watch compound and insert stock, and plan changeovers by mould and platen size so that late releases are caught before a press sits idle.

For mixing and preform staff

Release batches after the rheometer check, cut preforms to target weight, and link both to the run, so that strips keep their batch number from the mill to the press. No loose trays.

For press operators and trimmers

Record shots and rejects at the press, and check the cavity map and any blocked cavities before each run starts. Flash is logged by cavity as it appears.

For inspectors and dispatch

Enter Shore A, gauge and peel results, then release the lot, print its label and ship it. A failing lot stays on hold with the reason shown, so it cannot ship by mistake.

Reports

The numbers the owner asks for.

  • Release against production by part and week, with the shortfall
  • Compound batches and the parts made from each
  • Shots and rejects by mould and cavity
  • Peel and pull results by insert lot, with failure mode
  • Preform weight drift by run
  • Plating and post-cure quantities out and returned
  • Customer returns by part and compound batch
Good fit

Who this is built for.

  • Moulders of gaskets, seals, diaphragms, grommets and O-rings in EPDM, nitrile, silicone or fluoroelastomer who must name the batch behind a returned part
  • Makers of rubber-to-metal bonded bushes and engine mounts
  • Compression and transfer press shops serving machine builders, pump makers and railway suppliers that ask for a batch number on every carton label
  • Plants that run their own Banbury or open mill, cut preforms from the slab and need every strip to carry its batch number to the press
  • Moulders who send parts out for plating or post-cure
Honest answer

When it is not the right choice.

  • A small shop that moulds a few custom pieces on one press can run on a job sheet and a calendar, and will find this heavier than it needs.
  • Plants that mainly make hose or belting will find Rubber Hose Manufacturer Management Software or Conveyor Belt Manufacturer Management Software closer.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Your parts and moulds

Part numbers, mould cavity maps, platen settings and shot limits are entered from your drawings and toolroom cards, using the names your press operators already say aloud.

Cure and bond rules

Your process engineers supply temperature, cure time and bond test steps for each part, and we enter them so the press and the peel bench follow the same sheet.

Schedule format

The release sheets your customers send are mapped once so they load without retyping, and a change in a buyer’s format is a small job rather than a project. We handle it.

Existing records

Releases in progress, compound stock and customer balances are brought across ahead of the switch, and the first week is checked against paper.

Works alongside

  • Barcode and label printers
  • Email
  • Spreadsheet import for customer schedules
  • Accounting export
Common questions

Questions owners ask before a demo.

Can it load a monthly release?

Yes. The customer’s sheet is mapped once and later releases are imported, and a revision replaces the old quantity while keeping the date of change. Nothing is retyped from the email.

How does it link parts to compound batches?

The mixed batch is selected when a press run is opened, and every part lot made in that run shows the batch on its record and label. A recall searches by batch number.

Does it keep bond test results?

Yes. Peel or pull results, the failure mode and the insert lot are saved with the run that used it. A bush returned for separation can be matched to its blasting and cement records.

Can one cavity be blocked?

Yes. The toolroom can block a mould or a single cavity with a reason, and the planner cannot book it until it is released. The press operator sees the block on the cavity map as well.

How are outside processes handled?

A vendor job lists the parts sent, the process and the expected return, and quantities back are booked against it. Anything short stays open until someone closes it with a reason.

Can it print inspection reports?

Yes. Shore A hardness, dimensions and peel results print in a layout agreed with each customer, so the report is not retyped from a bench sheet.

Does it need machine connections?

No. Operators enter shots and times at the press or the bench. Wiring a shot counter into a press can be quoted later as its own job, apart from the first build.

Is there a demo on our own parts?

Yes. We start by building a demo around a handful of your part numbers, moulds and one compound grade, and cost follows in a written proposal with setup and monthly lines kept apart.

How does stock work for finished parts?

Finished lots are booked into stock after release, by part and rack location. Dispatch reduces them against the order. A lot on hold cannot be picked for a truck.

Can records be exported?

Yes. Press runs, compound batches and inspection results can be saved to a file in a layout you choose early, so that the accountant and the buyer’s auditor both get what they need.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Industrial Rubber Parts Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements