Skip to main content
GullySystem
Manufacturing · Software for power distribution equipment manufacturers

Keep each transformer, ring main unit and distribution board on one build record.

Distribution equipment makers build oil-filled transformers, feeder pillars, ring main units and low voltage boards, often to a utility’s specification. The software records CRGO core stock, winding copper, routine test results and inspection calls, then ties each serial number to the order that bought it.

At a glance

Power distribution equipment is built to a utility or contractor specification, and the buyer often reviews the design before a single lamination is cut. Core stackers, winders, welders and oil-filling crews all work to one drawing and one delivery date. A distribution transformer needs different records from a feeder pillar, even when both arrive through one tender and leave on one schedule. The paperwork differs more than the steel does.

Build and test tracking here centres on the serial number, which ties core steel, winding copper and oil to the unit. The routine test report rides with dispatch. Each transformer leaves with its own test sheet.

How the work runs today

Tenders arrive from utilities and large contractors, carrying kVA rating, voltage class, loss limits, tapping range, impedance and delivery schedule. The estimator prices CRGO core steel, enamelled copper, oil, tank and fittings, and the offer carries a loss figure the plant must later meet on the test bay. Pricing is a promise. After the order is confirmed, the design office submits drawings and a parts list, and the utility returns marked-up copies repeatedly until one final set gets its signature. Round two is normal.

Core laminations are cut and stacked with step-lap joints, then coils are wound and baked, assembled on the core and dried in a vapour phase oven. The active part is lowered into the tank and fitted with bushings, tap changer, Buchholz relay and conservator before any oil goes in. Ratio, winding resistance, insulation and loss tests follow once the unit is full, and a utility inspector may be called to witness them. The date is fixed well ahead, so the unit must already be dry, oil filled and tested when the inspector walks in. Distribution boards and feeder pillars take a lighter route through sheet metal fabrication, busbar fitting and wiring, though dispatch still needs serial plates and a test report. No report, no truck.

Where it breaks

What goes wrong for power distribution equipment manufacturers without a proper system.

Loss figures are quoted, not tracked

A tender commits to no-load and load loss limits, yet the core steel lot and winding weight are never tied to the figure measured on the test bay. Nobody learns why a unit missed.

Core and copper are consumed untracked

Silicon steel coils and winding wire leave stock for many units at once, so costing one transformer is a guess when nothing is booked to a serial number.

Inspection calls are arranged by phone

The utility’s inspector needs notice well ahead. A unit that is not ready wastes the visit, and the dates sit in someone’s diary while the test bay plans its week without them.

Drawings go through several approvals

The utility returns a drawing with comments twice before approval, and the shop starts cutting laminations before the final revision arrives. Rework follows.

Serial plates and reports get separated

A unit leaves with a nameplate that does not match the routine test report in the consignment file, and the mismatch surfaces only at the buyer’s store.

What the software does

What we would build for power distribution equipment manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Tender and loss commitments

Price a unit from CRGO core, winding copper, oil and tank, and record the no-load and load loss limits promised to the buyer against that tender line.

Core and winding records

Track silicon steel by lot, winding wire by weight and each coil built, with the unit it went into, so a loss failure can be traced to a steel lot.

Unit build routing

Follow each unit through core stacking, winding, vapour phase drying, tanking, oil filling and testing, with the bay and crew noted at every stage.

Routine test reports

Hold ratio, winding resistance, insulation, vector group and loss readings per serial number, with the operator’s name, so the report prints from stored values.

Inspection call register

Book witness tests with the buyer’s inspector and keep the outcome with the unit, including any snag raised on the day.

Serial plates and dispatch

Print serial plate data from the approved specification and match it to the packing list, so the nameplate and the report never part ways.

Before you talk to a supplier

A requirements checklist for power distribution equipment manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for power distribution equipment manufacturers.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

Power Distribution Equipment Maker Software

Tenders, loss commitments, core and winding stock, unit routing, routine tests, inspection calls and dispatch for distribution transformer and board makers.

See the product
Solutions inside

The business modules power distribution equipment manufacturers use most.

Each one is also available on its own, or inside a system built for you.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Common questions

Questions power distribution equipment manufacturers ask before they call.

Can it compare promised and measured losses?

Yes. The loss limits in the tender are stored with the order, and the no-load and load values measured at test sit beside them for each serial number.

Does it cover boards and pillars as well as transformers?

Yes. Each product family has its own routing, and a feeder pillar skips winding, drying and oil filling while a transformer passes through every stage.

How are inspection calls handled?

A call is booked against the unit, readiness is checked before the date, and the result is recorded for the dispatch file.

We make a handful of units a month. Is that enough?

Probably not at that volume. A small repair-and-rewind workshop can manage with job sheets, whereas serial-numbered new builds under tender are where a shared record starts to help.

What happens after I share my requirements?

An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements