Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for power distribution equipment manufacturers.

A checklist built from how power distribution equipment manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Tender and loss commitments
  • Core and winding records
  • Unit build routing
  • Routine test reports
  • Inspection call register
  • Serial plates and dispatch

Roles that need their own access

Who logs in, and what each person may see or change.

  • For design engineers
  • For tender estimators
  • For winding and assembly supervisors
  • For the test bay
  • For dispatch staff

Reports to ask for

Ask to see each one with your own sample data.

  • Units by build stage and by order
  • Quoted against measured losses per unit
  • CRGO and winding wire consumed by order
  • Witness calls booked with outcomes
  • Drawings awaiting buyer approval
  • Rewind jobs open by customer

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp
  • Accounting export
  • Label printer
  • Drawing file storage

Questions for any vendor

Put these to every supplier you are comparing.

  • Can the promised loss be checked against the test result?
  • How is core steel tracked?
  • Can it follow oil filling?
  • Does it manage the buyer’s witness test?
  • Can pillars and boards use the same system?
  • How are repairs recorded?
  • What decides the price?
  • Can we keep drawings in the system?
  • How do we bring in existing data?
  • Does it certify our products?
  • How long before the works routes units through it?
  • What should we have at hand first?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Loss figures are quoted, not tracked
  • Core and copper are consumed untracked
  • Inspection calls are arranged by phone
  • Drawings go through several approvals
  • Serial plates and reports get separated

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Routine test reports

What does one row mean before totals are combined?

Choose one period in “Routine test reports” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Drawings go through several approvals

What needs fresh approval after a record is changed?

For “Drawings go through several approvals”, change a material detail after approval during a scoped walkthrough. Agree the next responsible person and the evidence needed before the work can continue.

Background reading: ERPNext: approval transitions

Prefer to talk it through? See the power distribution equipment manufacturers page.