Hold every mould build, design change and tryout shot on one record.

A mould maker sells one tool at a time. Each tool is a small project of plates, inserts, standard parts and many machine hours. This software keeps drawing, revision, build stages, outside processes and tryout results under the tool number.

At a glance

A mould is quoted from a part drawing and a target date. Between the order and the first good sample sit design review, steel cutting, milling, spark erosion, fitting, polishing and tryout, and any one of those can slip. The delay shows only when the moulder phones to ask for samples, by which time the steel is cut and the recovery options are few.

Every tool gets a number. Its design revision, bill of materials, build stages and tryout shots stay under that number, so toolroom managers, designers and sales staff read one record instead of three separate files.

How the work runs today

The day starts with the tools on the floor. A cavity block waits for wire cutting, a core insert is out for heat treatment, and a hot runner manifold has not arrived from the supplier. The toolroom manager sorts the work by the date each tool is promised. Operators on the milling and erosion machines book their hours to a tool number, so cost and progress build up together as the day goes on.

A designer receives a part change from the customer, updates the model and raises a revision. Fitters then need to know which inserts are affected. Tryout is booked on an injection machine, the shots are inspected, and the moulder either approves the sample or asks for corrections. Every step is noted under the tool number, so the designer, the manager and the salesperson can later see who asked for what and when.

Where it breaks

What goes wrong for plastic mould makers without a proper system.

Late part changes

Steel is already cut. A revised part drawing arrives while a cavity is half machined, and with no revision recorded the toolroom cannot say which inserts need rework or who agreed to pay.

Unbooked hours

Time goes on slips. Milling, erosion, grinding and fitting hours are written on paper or remembered, so the quotation was built on estimates and the real figure for each mould is never compared with it.

Inserts away

Hardening happens at an outside vendor. A core insert goes out on a slip, and no one records when it should return, so the fitter waiting on that cavity block stands idle.

Scattered tryout notes

Short shots, flash, sink marks and ejection marks are reported by phone or chat. The correction list is rebuilt each time, and the second tryout repeats a fault that the first one already showed.

Late stage bills

Payment is agreed in stages such as design approval, steel cut and first sample, yet nobody tells accounts when a stage completes. The invoice goes out late and cash waits.

What the software does

What we would build for plastic mould makers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Tool quotations and orders

Build the quotation from cavity count, steel grade, hot or cold runner and estimated hours. Keep every revision, and turn an accepted quote into a tool order with its promised date.

Part data and revisions

Store the customer’s model. Record each design revision with the tool, who approved the change and which plates and inserts it touches.

Mould bill of materials

List plates, cavity and core inserts, slides, lifters, ejector pins and cooling fittings. Each bought-out standard component carries its supplier and due date.

Toolroom stages

Break the build into cutting, milling, erosion, grinding, fitting and polishing, and see which machine and operator hold each tool right now.

Outside processes

Send inserts for hardening, nitriding or texture etching on a delivery note. The list shows what each vendor still holds and for how many days.

Tryout and approval

Log each tryout with machine, resin, settings and faults seen. Record the sample inspection result, the correction list and the customer’s decision.

Mould history

Every mould keeps its shot count, repairs and next service date. A returning tool arrives with its past already noted.

Before you talk to a supplier

A requirements checklist for plastic mould makers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for plastic mould makers.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

Plastic Mould Maker Management Software

Mould quotations, design revisions, bills of materials, toolroom stages, outside processes, tryouts, maintenance history and milestone billing for plastic mould makers.

See the product
Solutions inside

The business modules plastic mould makers use most.

Each one is also available on its own, or inside a system built for you.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Common questions

Questions plastic mould makers ask before they call.

Does it follow design changes?

Yes. Each design revision is stored against the tool number, along with the plates and inserts it affects. The toolroom sees the revision that applies before any further steel is cut.

Can it hold repair jobs too?

Yes. A repair or modification comes in as its own job against the existing mould number. The shot count, earlier repairs and the fault reported by the moulder sit on that record.

How are toolroom hours collected?

Operators book hours to a tool number and a stage, on a shared screen or a phone. Whether that is a screen beside the erosion machines or a phone, you choose it at the start.

Can quotes use our own rates?

Yes. Steel grades, block sizes, machine rates per hour and your standard component prices are entered first. Your export markets decide which currency and tax rules apply to each quotation.

What happens after I share my requirements?

An engineer reads what you send and replies within one business day. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements