Skip to main content
GullySystem

Manufacturing · Software for medical device manufacturersTrace every device lot to its parts, its checks and its customers.

A device that reaches a patient carries a long paper trail behind it: which parts went in, who checked it and where it was sent. The medical device manufacturer software holds that device history record as one chain per lot. Inspections, supplier approvals, nonconformances and complaints attach to the same record, and your quality team sets the forms.

At a glance

Medical device plants make everything from single-use syringes and catheters to electronic patient monitors. The product differs, but the records they must keep look alike: component lots, routing steps, inspection results, UDI labels, sterilisation certificates, shipments and complaints.

Production and quality software for device makers keeps those records joined, so a quality manager can search one lot and see the parts, the checks and the customers together. The system holds the records. Recall questions get one answer.

How the work runs today

A hospital group, distributor or brand owner places an order or a contract run, and planners release a production order against the current revision of the bill of materials. Components from approved suppliers must be in stock. Incoming goods wait in quarantine until the inspector signs the receipt. Then the lot goes to the floor.

Operators record each step at the cell, from injection moulding or assembly in the cleanroom to leak testing and pouch sealing, while inspectors take in-process and final measurements against the plan. Parts that need ethylene oxide or gamma sterilisation, or a coating, go to an outside processor and return with a certificate. A released lot is labelled, shipped and invoiced. Nothing ships without a release. When a complaint arrives weeks later, the quality team opens the lot and works back from there.

Where it breaks

What goes wrong for medical device manufacturers without a proper system.

Trace records live in separate files

Goods receipts, production sheets and shipping lists sit in different places, so a trace from one finished device to its resin batch or circuit board means opening each of them. An audit day stretches.

Old revisions stay in circulation

A device master record is updated, but a printed copy of the earlier bill of materials stays at a workstation. Parts are built to the wrong list. Rework follows.

Inspection forms are filed away from the lot

Signed torque, leak and dimensional checks are stored in binders by date, so finding the result for one lot months later takes a search through boxes.

Complaints and actions are tracked apart

A complaint arrives by email, while the investigation and the CAPA are written in other documents. Closure then depends on memory, and the nonconformance report is filed separately.

Supplier approval lapses unnoticed

Audit dates, quality agreements and sterilisation certificates sit with one person, so purchasing can raise an order to a source whose approval has expired. Nobody sees it until an auditor asks.

What changes

What medical device manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

One search from lot to customer

A quality manager types a finished lot number and sees the resin batch or circuit board, the checks, the sterilisation certificate and every shipment. A recall question gets one answer on one screen. Audit days no longer stretch across several folders. Trace drills take minutes. Auditors see the same chain.

Production built to the current revision

Operators see only the current bill of materials for a device, and superseded lists are locked from use. A printed copy at a workstation can no longer be built from. Rework from wrong parts stops being a surprise discovered at final inspection. Floor staff trust the screen.

Inspections that stay with the lot

Torque, leak and dimensional results are signed at the cell and attached to the lot they measured. The inspector’s name and time sit beside each figure. A hospital buyer asking for a lot’s final checks gets the real sheet, not a reconstruction. The record speaks first. Buyers get paper they can file.

Supplier approval visible at goods receipt

The storekeeper sees at the door whether a component supplier is approved. Incoming goods stay in quarantine until the inspector signs. Nonconformances raised against a supplier build a history the buyer reads at the next review. Poor performers stand out. Contracts are renewed on evidence. Approved lists stay current at the door.

Complaints linked back to the build

A complaint naming a catheter lot opens the lot’s device history record, with parts, checks and shipments in view. The team sees which other customers received that lot. Investigation starts from facts and finishes with a documented closure. Closure is dated and signed. Repeat complaints on one part stand out quickly.

What the software does

What we would build for medical device manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Bills of materials and revisions

Hold each device as a revisioned list of components and labels, with an effective date so the floor builds to the current revision. Superseded lists are locked from use.

Production orders and routings

Release an order for each lot with its routing, work cell, tooling and operator, and record each step as it is completed, from moulding through assembly to final pack.

Lot and serial traceability

Link component lots, finished lots, serial numbers, UDI codes and shipments, so a recall trace runs forwards to customers or backwards to the resin and board suppliers from one search.

Inspection and release

Record incoming, in-process and final results against a sampling plan. A failed lot is held in quarantine until a reviewer decides what happens to it, and the decision is signed.

Complaints and corrective actions

Log each complaint against its lot and carry the investigation, the nonconformance report, the CAPA and the closing approval on one record, with due dates and owners.

Supplier approval and outside processing

Keep approved supplier status, audit dates and sterilisation or coating certificates, and send parts out on a delivery note that returns with its processing paperwork and lot numbers.

Cleanroom environment and gowning log

Logs particle counts, differential pressure and gowning checks for each cleanroom shift. The production head sees any reading out of range before a lot is started. Entries sit beside the lot made that day.

Gauge and test equipment calibration

Lists each gauge, torque driver and leak tester with its calibration date and next due date. Inspectors see an overdue instrument before use. Measurements link back to the instrument that took them.

Label and instructions artwork

Keeps the label and instructions for use for each device model, with revision and approval date. The packing supervisor prints only from the approved artwork. Withdrawn versions are locked.

Market registrations and certificates

Tracks the registration files and quality certificates held for each market, with expiry dates. The regulatory lead sees which are due for renewal. Distributors request copies from here.

Before you talk to a supplier

A requirements checklist for medical device manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules medical device manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Bill of Materials

A catheter or syringe model lists each resin, tube, needle and sterile pouch against a revision number. A changed component issues a new revision. Old lots keep the revision they were built on.

Learn more

Work Order Management

A production order releases only components the inspector has cleared from quarantine for that lot. Operators record each cell step, from moulding to pouch sealing. Skipped steps hold the lot.

Learn more

Batch and Serial Tracking

Every implant or device carries a lot or serial number linked to its parts, its operators and its destination hospital. A field query lists every unit that shares a suspect component. Recall lists come from this link.

Learn more

Quality Control

Incoming components wait in quarantine until the inspector signs the receipt. In-process and final checks are measured against the inspection plan. A failed lot is held and marked.

Learn more

Ticket Management

A hospital reports a torn pouch or a stopped pump, and a numbered complaint opens against the lot. Investigation and corrective action stay under that number. Quality signs the closure.

Learn more

Document Management

Device master files, work instructions, validation protocols and supplier certificates are held with a revision and approval date. Operators see only the current version at the cell. Superseded copies stay for audit.

Learn more

Job Work Management

Parts that need ethylene oxide or gamma sterilisation travel to an outside site on a delivery note. The sterilisation certificate returns with the load. Lots wait until it arrives.

Learn more

Vendor Management

Approved supplier lists carry each resin, needle and packaging vendor with audit date, certificate and delivery record. Lapsed audits block new orders. Purchasing sees the status before raising an order.

Learn more
AI by department

Where AI can help medical device manufacturers.

Each one reads records you already keep, and a person approves every decision.

Worldwide

Where we work with medical device manufacturers.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Bills of materials and revisions

Which version applies to work that has already started?

Use a revised example from “Bills of materials and revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Lot and serial traceability

Can you follow a suspect input through to the affected deliveries?

Pick one real record from “Lot and serial traceability”. Ask the team to trace its origin and identify the later work or deliveries it affected, including any split quantities.

Background reading: ERPNext: forward and backward traceability

Common questions

Questions medical device manufacturers ask before they call.

Does the software make us compliant with a device standard?

No software can do that alone. It holds the records your quality system calls for, such as the device history record and CAPA log. How well the forms match your regulator’s expectations is reviewed during implementation.

Can it manage labels with lot and serial data?

Yes. Label fields and UDI barcodes are set for each device, and the lot, serial number and expiry date printed are the ones held on the production record.

Does a small plant get value from it?

Often, yes. A plant with a few product lines and one quality manager can use the same lot, inspection and complaint records, with fewer approval steps set up.

Can contract manufacturing runs be kept separate?

Yes. Each customer’s devices, bills of materials and lots can be kept apart, with their own price lists, labels and shipping records.

How is a device maker’s system priced?

Product families and bills of materials, the lines and inspection points, supplier approvals to track and the users in production and quality all count. Label printing for lot and serial data is a separate part. Once your quality team’s forms have been read, we send the quotation.

What papers should a device maker line up first?

Gather the bill of materials with its revisions, a routing, a device history record, inspection forms, a complaint file and the approved supplier list. Name a quality manager and a production planner who can verify what is built.

Do device records stay with the manufacturer if it stops using the system?

They do. Lot histories, inspections, complaints and supplier files stay with the manufacturer, with the source code. A plain-file copy is available when wanted. We provide support after launch. Hosting is with GullySystem unless your quality team asks for it elsewhere.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements