Controlled documents and approvals for device makers
Procedures, work instructions, specifications and validation protocols are kept with revision numbers, reviewers and approval dates. Floor staff open the current copy at the step they are working on. Superseded sheets are withdrawn from every workstation, and the earlier revisions stay on file for quality staff and auditors.
What each controlled document record keeps
A controlled document has one live revision. Each is stored with a number, a revision, an author and an approval date. Procedures, work instructions, specifications and validation protocols all follow the same pattern, whatever their length or the team that owns them.
One work instruction revision, drafted to withdrawn
Several hands touch every document change, however small. Here is the life of one work instruction for a sealing step. It runs from the first edit to the withdrawal of the old sheet at every bench on the shop floor, in every area.
Who writes, approves and opens each document
Some people write documents and others only read them. The system treats these jobs separately. Authors and approvers see drafts as well as live copies, while the floor sees approved copies only and nothing else.
Decisions to settle before documents are loaded
Loading documents is easy. Agreeing what counts as controlled is harder. Settle the points below with the quality head, a production manager and whoever writes your procedures today. The answers shape how strict the system feels.
How controlled documents connect to production and quality
Documents are used by almost every other feature. Routings open instructions from them, inspection plans cite their specifications and corrective actions change them over time. A document that is wrong in one place is wrong everywhere, which is why one shared store matters to every team on site.
- Opens work instructions at each routing step on orders
- Supplies specification revisions to quotations and bills of materials
- Holds validation protocols cited by inspection plans
- Receives procedure changes raised by corrective actions
- Links supplier quality agreements to approval records
Where controlled documents stop
This feature stores documents, revisions and approvals. It does not write your procedures or decide which documents your quality system or regulator requires. Those choices belong to your quality head and regulatory adviser. The legal standing of an electronic signature also rests with your adviser. A plant with very few documents may be content with a shared folder and a log.
Frequently asked questions
What happens to a superseded work instruction?
It is withdrawn from every workstation on the effective date of its replacement. The revision stays in the file as history. Quality marks it as superseded. Quality staff can still open it to answer an audit question.
Can more than one person review before approval?
Reviewers are named on each revision in the order your quality system sets. Each one signs with a date. The final approval comes only after the reviewers have finished, and all of their signatures stay visible on the record.
How does an operator know a copy is current?
The operator opens the instruction from the production step, and the system offers only the approved revision. Its revision number and approval date show at the top of the page. A withdrawn sheet is not offered.
Can a corrective action change a document?
A corrective action can name the procedure or work instruction that must change. Quality then drafts a new revision. The approved revision is linked back to the action that asked for it, so the reason for the change is easy to find later.
Where do validation protocols sit?
They sit with the other controlled documents in the store, each with its revision, reviewers and approval date. Inspection plans and routings can cite them. A protocol that is revised keeps its earlier versions available for audit.
How this feature fits the system.
Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Bills of materials and revisions
Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.
Bill of MaterialsProduction orders and routings
Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.
Work Order ManagementLot, serial and UDI records
Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.
Batch and Serial TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements