Skip to main content
GullySystem

Controlled documents and approvals for device makers

Procedures, work instructions, specifications and validation protocols are kept with revision numbers, reviewers and approval dates. Floor staff open the current copy at the step they are working on. Superseded sheets are withdrawn from every workstation, and the earlier revisions stay on file for quality staff and auditors.

What each controlled document record keeps

A controlled document has one live revision. Each is stored with a number, a revision, an author and an approval date. Procedures, work instructions, specifications and validation protocols all follow the same pattern, whatever their length or the team that owns them.

Number, revision and status

Each document carries its number, a revision number and a status of draft, approved or withdrawn, shown at the top of the page. Only an approved revision is live. Earlier revisions stay in the file as history.

Reviewers and approval dates

Every revision lists who reviewed it and who approved it, with the date of each signature. The order follows your own sign-off steps. A revision without its approval never goes live, so a draft cannot reach the floor.

Procedures and work instructions

Procedures describe how the plant works. Work instructions describe how one step is done at a cell. Both sit in the same store, and a work instruction opens from the production step it belongs to.

Specifications and validation protocols

Material and part specifications sit beside the validation protocols for processes such as sealing or a sterilisation step. Each keeps its own revision history. An auditor who asks for a protocol sees the version that applied on the day.

One work instruction revision, drafted to withdrawn

Several hands touch every document change, however small. Here is the life of one work instruction for a sealing step. It runs from the first edit to the withdrawal of the old sheet at every bench on the shop floor, in every area.

A quality engineer drafts the change

A quality engineer opens the sealing work instruction and starts a new revision. The change is typed as a draft. Reviewers are named, and the reason for the change is noted in the file for later readers.

Reviewers sign in turn

The production manager reviews first, and the head of quality approves last, as your sign-off order says. Each signature is dated. A reviewer who disagrees can say so on the record, which keeps the discussion with the document.

The floor switches over

On the effective date every cell on the floor opens the new revision. The superseded sheet is withdrawn from every workstation at once, in all areas. The old copy cannot be opened. It stays in history.

An auditor asks about last year

An auditor asks which sealing instruction applied during a past lot. Quality opens the document history. It shows the revision that was live on that date, with its reviewers, their dates and the approvals attached.

Who writes, approves and opens each document

Some people write documents and others only read them. The system treats these jobs separately. Authors and approvers see drafts as well as live copies, while the floor sees approved copies only and nothing else.

For quality and regulatory teams

These staff draft, review and approve documents and manage every revision. Documents waiting for a signature come first. They can open any past revision, with its reviewers and dates, in a few clicks from the document list.

For operators and technicians

Operators open the work instruction at the step they are doing on the cell screen. That copy is always current. Limits, pin gauge sizes and cautions appear beside the step, so no one hunts for the right page.

For production planners

Planners see which revision of a work instruction stands behind each routing before they release an order. A pending change is visible in the list. They can time the release around the effective date of the new revision.

For owners and quality heads

Owners see the count of documents waiting for approval. Heads of quality read the list of revisions made lately, with the people who signed them and the date of each signature. The list opens to the documents themselves.

Decisions to settle before documents are loaded

Loading documents is easy. Agreeing what counts as controlled is harder. Settle the points below with the quality head, a production manager and whoever writes your procedures today. The answers shape how strict the system feels.

Who may approve a revision for Controlled documents and approvals

Set the sign-off order for each type. A work instruction may need two names, while a validation protocol may need three names. Your quality head reviews the order during set-up, and later changes are made on request.

What counts as controlled

Decide which documents sit under revision control and which stay as plain files in a shared folder. Completed forms and records are not procedures. Draw the line once, write it down and apply it the same way.

How current documents come across

Approved copies are loaded with their present revision numbers and dates. Superseded copies can stay in your archive. Quality staff open a sample on the floor screens and compare each one with the paper original before go-live.

Which list opens first for Controlled documents and approvals

Choose the list the quality office sees on arrival. Documents awaiting approval is the natural choice here. Documents due for review is another choice. The chosen list loads first at sign-in, and either can be changed later on request.

How controlled documents connect to production and quality

Documents are used by almost every other feature. Routings open instructions from them, inspection plans cite their specifications and corrective actions change them over time. A document that is wrong in one place is wrong everywhere, which is why one shared store matters to every team on site.

  • Opens work instructions at each routing step on orders
  • Supplies specification revisions to quotations and bills of materials
  • Holds validation protocols cited by inspection plans
  • Receives procedure changes raised by corrective actions
  • Links supplier quality agreements to approval records

Where controlled documents stop

This feature stores documents, revisions and approvals. It does not write your procedures or decide which documents your quality system or regulator requires. Those choices belong to your quality head and regulatory adviser. The legal standing of an electronic signature also rests with your adviser. A plant with very few documents may be content with a shared folder and a log.

FAQ

Frequently asked questions

What happens to a superseded work instruction?

It is withdrawn from every workstation on the effective date of its replacement. The revision stays in the file as history. Quality marks it as superseded. Quality staff can still open it to answer an audit question.

Can more than one person review before approval?

Reviewers are named on each revision in the order your quality system sets. Each one signs with a date. The final approval comes only after the reviewers have finished, and all of their signatures stay visible on the record.

How does an operator know a copy is current?

The operator opens the instruction from the production step, and the system offers only the approved revision. Its revision number and approval date show at the top of the page. A withdrawn sheet is not offered.

Can a corrective action change a document?

A corrective action can name the procedure or work instruction that must change. Quality then drafts a new revision. The approved revision is linked back to the action that asked for it, so the reason for the change is easy to find later.

Where do validation protocols sit?

They sit with the other controlled documents in the store, each with its revision, reviewers and approval date. Inspection plans and routings can cite them. A protocol that is revised keeps its earlier versions available for audit.

Where it fits

How this feature fits the system.

Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Bills of materials and revisions

Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.

Bill of Materials

Production orders and routings

Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.

Work Order Management

Lot, serial and UDI records

Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.

Batch and Serial Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements