Skip to main content
GullySystem

Manufacturing · Medical Device Manufacturer Management SoftwareDevice records, lots, inspections and complaints for medical device makers.

Manage device master records, production orders, resin and tubing lots, serial numbers, inspections, supplier approvals, complaints and shipments in one system. Each finished lot carries the parts that went into it, the checks it passed and the hospitals that received it. Quality teams open one record to trace a device forwards or backwards. Production sees the same plan.

  • Device families, component lists and inspection plans entered the way your quality system defines them
  • Part masters, supplier lists and open orders migrated
  • Changes to routings, forms and approval steps made by GullySystem staff when asked

Medical Device Manufacturer Management Software holds bills of materials, production orders, lot records, inspections and complaints for device makers. GullySystem configures it for your plant. Every finished lot links to its component lots, inspection results and shipments. Corrective actions stay beside the complaint that raised them. Document rules and approval steps follow the quality system you already run.

Where it breaks today

What goes wrong before the software.

Lot records sit in several files

Component receipts, moulding steps and dispatch lists live in separate sheets. Tracing one catheter or syringe back to its resin, tubing and pouch lots means opening every one of them, and a recall deadline makes that painful.

Revisions of a device are hard to pin down

A bill of materials changes when a supplier moves a polycarbonate grade or a gasket is replaced. Floor staff may still hold a printed copy of revision B, so the first article fails inspection.

Inspection results are kept on paper

Incoming, in-process and final checks are signed on forms. Finding the Shore A hardness, luer fit, seal peel, endotoxin or bioburden result for one lot later means a hunt through binders. It is slow.

Complaints and corrective actions drift apart

A customer complaint arrives by email or phone, the action is written in another sheet, and the nonconformance report links back to it only when someone remembers. Threads go missing.

Supplier approval is tracked by hand

Approved supplier lists, audit dates and ISO certificates are held by one person. Purchasing can order moulded housings or Tyvek pouches from a source whose approval has lapsed, and nobody sees it until the audit.

Outside processing leaves no clear trail

Parts go out for gamma or ethylene oxide sterilisation, parylene coating, passivation or machining. They return with a certificate filed away from the lot it covers, so the record is hard to produce on request.

How it runs

How the work flows through it, step by step.

Illustration with sample figures. Your screens are built around your own records.
  1. 1

    Enquiry and quotation

    A hospital, distributor or brand owner asks for a device or a contract run. Your device price list and its quantity breaks feed each quotation, and the specification revision is noted on it.

  2. 2

    Order and production plan

    A confirmed order becomes a production order against the current bill of materials revision. Planners see which components, mould tools and extruders are needed. The routing starts at the first operation.

  3. 3

    Receiving and approved parts

    Components arrive from approved suppliers and wait in quarantine until incoming inspection is signed, so nothing reaches the cleanroom early. Each receipt creates a component lot, and gowning and area logs link to it.

  4. 4

    Production and inspection

    Operators record each step against the lot, including mould cavity, extrusion line or autoclave cycle. In-process and final checks follow the inspection plan, and a failed burst or leak test blocks release until quality decides on rework or scrap.

  5. 5

    Release and shipment

    A released lot is packed and shipped with its serial numbers or lot number, and the customer, the lot and the invoice are linked. Dispatch is one step. The device history record closes complete.

  6. 6

    Feedback and corrective action

    Complaints and returns are logged against the lot. Investigations, corrective and preventive actions and approvals are recorded until closure, and a trend by device and cause feeds the management review.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Quotations and price lists

Build quotations for devices, accessories and contract runs from your own price lists, with quantity breaks, mould tooling charges and every revision kept for the customer file.

Bills of materials with revision history

Hold each device as a list of components with quantities, a revision letter and an effective date. A new revision replaces the old one on the floor from that date.

Production orders and routings

Release a production order for each lot with its routing, press, mould cavity, extrusion line, operator and planned date. Record each step as it finishes, with the cleanroom area and the equipment used.

Lot, serial and UDI records

Number every component lot and finished lot, assign serial numbers where needed, and hold label data including UDI-DI and UDI-PI fields. Trace a device forwards to hospitals or backwards to resin. One search does both.

Incoming, in-process and final inspection for device lots

Set an inspection plan for each part and device, with sampling levels, lumen and torque limits, particulate counts, seal peel strength and acceptance limits. Record measurements and pass or fail results. A failed lot is held from release.

Complaints and corrective actions

Log each complaint with its lot and investigate it. Assign a corrective and preventive action with an owner, record any biocompatibility query, and close it with an approval and a trend by device and cause.

Controlled documents and approvals

Keep procedures, work instructions, specifications and validation protocols with revision numbers, reviewers and approval dates. Floor staff open the current copy, while superseded sheets are withdrawn from every workstation.

Supplier approval and purchasing

Hold the approved supplier list with audit dates, quality agreements and certificates. Raise purchase orders only to approved sources, and compare rates and delivery record across moulders, pouch printers and resin vendors.

Outside processing and sterilisation

Send parts or finished lots to an outside processor under an outside processing dispatch note, then record the return and file the sterilisation or coating certificate against the lot it covers.

Stock and goods receipt

Record every receipt, issue and return of components and finished goods by bin location. Reorder levels and shelf-life expiry of adhesives and pouches show beside the stock, and quarantine stock is kept apart from released stock.

Orders, shipments and invoices

Confirm customer orders, pack against released lots, print delivery notes and raise invoices in the currency and tax settings of each country. Export the entries to your accounting software.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Bill of Materials

    Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.

  • Work Order Management

    Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.

  • Batch and Serial Tracking

    Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.

  • Quality Control

    Inspection plans for parts and devices hold measurements and pass or fail results, and a failed check keeps the lot from release.

  • Ticket Management

    A complaint becomes a numbered record tied to its lot, with an owner, an investigation, a corrective action and a closing approval.

  • Document Management

    Procedures, work instructions and specifications are stored with revision numbers and approval dates, so staff on the floor open the current copy.

  • Job Work Management

    Parts leave on a dispatch note for an outside processor, and the return, its certificate and the lot it covers are recorded together.

  • Vendor Management

    Approved supplier status, audit dates and certificates sit on each supplier, and purchasing sees the status before a purchase order is raised.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners and quality heads

See lots in production, orders due, open complaints, supplier reviews and stock value on one screen. Every figure opens the records behind it, down to the individual lot.

For quality and regulatory teams

Run inspections, review complaints, approve documents and pull a trace report for any lot. Open corrective actions and overdue supplier audits are listed first, ahead of everything else.

For production planners

Plan orders against components, mould tools and extruders, and release production orders with the right revision. Shortages are flagged before release. No order starts without its parts.

For operators and technicians

See assigned production orders, record steps and gauge readings, and flag a problem from a shop floor screen. Work instructions open at the step being done, with the pin gauge and limit shown.

For purchasing and stores

Raise orders to approved suppliers, receive goods, hold them in quarantine and issue approved lots to production. Expiry dates and reorder levels show on the stock screen.

Reports

The numbers the owner asks for.

  • Lot trace from finished device to component lots and shipments
  • Production orders by status, machine and due date
  • Inspection results and failures by part and supplier
  • Complaints by device, cause and closure status
  • Corrective actions open, overdue and closed
  • Supplier approval status and certificate expiry
  • Stock of components and finished goods by location
Good fit

Who this is built for.

  • Makers of single-use and disposable devices such as syringes, catheters and dressings
  • Manufacturers of diagnostic kits, monitoring devices and electronic medical equipment
  • Contract manufacturers that build devices under another company’s brand
  • Producers of orthopaedic, dental and surgical instruments in small and mid-sized plants
  • Device makers that sell through distributors and direct to hospitals
Honest answer

When it is not the right choice.

  • A distributor that only buys and resells finished devices needs stock and invoicing more than production records.
  • A hospital or clinic that only uses devices, not makes them, is better served by Hospital Operations Management Software.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Your device families and parts

Part numbers, bills of materials, revision rules and routings are loaded as your quality system describes them, and device families are grouped the way your regulator files them.

Inspection plans and forms

Checks, measurement fields and acceptance limits are set for each part and device, so operators fill in what your procedures ask for at incoming, in-process and final stages.

Approval steps

Who reviews a document, a complaint or a release is set to your own sign-off order. Your quality head reviews that order during implementation, and later changes are made on request.

Labels and tax settings

Label fields, document layouts, currencies and tax rules are set for each market you ship to, with UDI data held where a market asks for it.

Records brought across

Part masters, supplier lists, open orders and stock balances are imported from your spreadsheets or present system. Quality staff test a sample against shelf stock first.

Hosted by GullySystem

GullySystem hosts the system, so quality, production and stores work from the same records. Edits come from our staff, and your quality head signs off each change before it goes live.

Works alongside

  • Email
  • SMS
  • WhatsApp and other messaging
  • Barcode and label printers
  • Accounting software export
  • Spreadsheet import
Make an informed decision

Checks to bring to your product demo.

Review these scenarios against the product configuration and record anything that still needs to be agreed.

Stock and goods receipt

What happens to movements entered while a count is being checked?

For “Stock and goods receipt”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

Incoming, in-process and final inspection for device lots

Who decides whether a failed result blocks the next step?

For “Incoming, in-process and final inspection for device lots”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Common questions

Questions owners ask before a demo.

Does it follow one particular quality standard?

No single standard is built in. It is a record system, not a certificate. Forms, approval steps and document rules are set to your own quality system, and the fit with your regulator’s expectations is reviewed during implementation.

Can a device be traced back to its component lots?

Yes. Each finished lot links to the component lots consumed and to the customers shipped to. The trace works in both directions from one search, which helps when a supplier reports a bad resin lot.

Can it handle serial numbers as well as lot numbers?

Yes. Some devices are tracked by serial number and others by lot. The choice is made for each part, and labels print with the fields you set, including the barcodes your customers scan.

How are complaints linked to corrective actions?

A complaint is logged against a lot. Root cause, containment and the corrective action all hang from the complaint itself. Each step has a named owner and a date, and the record stays open until the quality head signs.

What happens when a bill of materials changes?

A new revision is created with an effective date, and production orders released after that date use it. Orders already open keep the revision they started with, so one lot is never built on mixed documents.

Can parts sent for sterilisation or coating be followed?

Yes. An outside processing dispatch note records what left, who holds it and when it is due back. The returning sterilisation or parylene certificate is attached to the lot it covers.

Can we bring in our existing part and supplier lists?

Yes. Part masters, bills of materials, supplier lists and open orders are imported from spreadsheets, and your quality team verifies a sample of lots before production moves over.

Do operators need a computer at each machine?

A tablet or a shared screen at each cell is enough. Operators pick an order, record steps and gauge readings, and flag a problem, scanning the barcode on the lot being built.

Who owns our production records?

You do. The format and route by which your lot records are handed back are written into the quotation, ahead of any build work.

How is pricing arrived at for a device maker?

Device families and parts to load, the users across production, quality and stores, and the inspection plans and approval steps to build drive the cost. Label printers and records brought across add effort. We demonstrate on your own device first. Any module can be dropped from the itemised quotation to see what changes.

How soon can the production floor use it?

Lot records lead. Release one is made up of bills of materials with revisions, production orders and routings, lot and serial records and inspection. Complaints, controlled documents, supplier approval and outside processing follow. The time needed depends on how many parts and revisions must be loaded. Sequence and calendar are set in the proposal.

What should a manufacturer have in hand first?

Have the part and supplier lists, bills of materials for your device families, and current inspection forms. Add a sample production order, a complaint record and the approval route for documents. Name a quality lead, a planner and a stores person to answer our questions and review screens. The label printer must be reachable.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Your requirements

See Medical Device Manufacturer Management Software set up around your records.

Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements