A production order is released for each device lot, with its routing, press, mould cavity or extrusion line, operator and planned date. Operators record each step as it finishes, with the cleanroom area and the equipment used. Planners, operators and quality staff then read one running record of the lot.

What a device production order records

One order covers one lot. It names the device, the bill of materials revision, the routing and the planned date, then collects every step that follows. The routing is the fixed sequence of operations. Each pass through it leaves a record.

Routing and bill of materials revision

Each order carries the routing for its device and the bill of materials revision current on the release date. Both sit at the top of the order. An older revision is not offered to the planner.

Machine, tool and operator

It names the press, the mould cavity set or the extrusion line, the operator and the planned date. These are chosen at release by the planner. A change of press is noted on the order itself.

Step results as they finish

A step is recorded when it ends. The operator enters the quantity made, the quantity rejected, the time and any gauge reading. Steps stay in routing order, so the record reads the way the shift ran.

Cleanroom area and equipment used

Every step also holds the cleanroom area and the equipment used, such as a mould cell or an autoclave cycle. Gowning and area logs link to the order. An auditor sees where each step happened.

Running a device lot from release to close

A lot passes through several hands between the planner’s desk and the pack-out bench. That order is the thread that joins them. Here is how that thread looks through one run of a moulded housing, from release to the last step.

The planner releases the order

The planner picks the device, confirms the components are in stock and checks that the mould tool and press are free. Shortages show before release. No order starts without its parts, so the cell never waits.

An operator opens the first step

At the moulding cell the operator selects the assigned order on a tablet. The work instruction opens at that step, with the pin gauge and its limit shown beside it. Recording takes a few taps.

An autoclave cycle finishes

A technician closes the autoclave step. The cycle that ran is entered by number. It sits beside the lot, so a later question about that load can be answered without hunting through the cell’s own log.

A gauge reading fails

An operator measures a part outside its limit and flags a problem from the screen. The lot is held. Quality then decides between rework and scrap, and that choice is recorded against the same step.

Who opens the order and what each sees

The order is one record with several views. People at the press, at the planning desk and in the quality office read different parts of it. None of them needs a printed traveller to know where the lot stands.

For production planners

Planners release orders against the current revision and read the components, mould tools and extruders each one needs. Orders are listed by status, machine and due date. Late ones are first. Late work is seen on opening.

For operators and technicians

Operators see the orders assigned to their cell on a tablet. They record steps and gauge readings and flag a problem from the shop floor screen. Instructions open at the step. Limits are shown beside it.

For quality and regulatory teams

Quality staff read each completed step, the cleanroom area and the equipment used. A lot that failed a check is visible at once. Records are complete first. Then the quality head considers the lot for release.

For owners and quality heads

Owners see lots in production and orders due on one screen. Each figure opens the orders behind it. A head of quality can reach any single step of any lot in a couple of clicks.

Choices to make before orders are released

Routings are loaded once and used every day. Shaping them well early saves repeated edits. Settle the points below with the production manager and the quality head. They decide how much detail the floor will record.

Who may change a routing for Production orders and routings

Decide who can edit the sequence of operations for a device and who approves the edit. A routing change affects every later order. Your own sign-off order is applied, and the edit is dated and kept.

Which steps are recorded individually

Choose the steps that need their own entry and those that can be grouped. Moulding, assembly, sealing and pack-out can each be recorded one by one. Small handling moves can share one line. Operators then tap fewer times.

How open orders come across for Production orders and routings

Orders now on the floor can be imported with their routing and progress. Closed history stays in your old files unless you ask for it. Quality staff compare a sample against live paperwork first. That is the test.

Which list the planner reads first

Pick the opening view for planners. Orders by status, machine and due date is one listing. Some teams start from late orders only. The chosen view loads as soon as the planner signs in each day.

How production orders connect to other records

An order sits at the centre. It draws on the bill of materials and stock before release, and it hands results to inspection, lot records and shipping afterwards. Each link means a number is entered once and then read by the next team in line.

  • Takes components and revision from bills of materials
  • Passes the finished lot number to lot, serial and UDI records
  • Calls in-process and final inspection at the set steps
  • Opens work instructions from controlled documents at each step
  • Sends parts for outside processing on a dispatch note

Where production orders and routings stop

This feature records the work. It does not design the process, validate it or decide whether a step is safe. Process validation stays with your quality head and regulatory adviser. Machine upkeep and tool repair stay with the maintenance team. A one-press shop making a single short run may find a signed paper traveller enough.

FAQ

Frequently asked questions

What does an operator see at the cell?

The orders assigned to that cell, the step to be done and the work instruction opened at that step. Gauge limits show beside the entry field. A tablet or shared screen at the cell is enough.

How are component shortages shown before release?

The planner sees the components the order needs against stock and quarantine. A missing part is flagged before release. The order waits until the part is received and passed, or the planner moves the date.

Can two device families have different routings?

Each device carries its own routing. A syringe might run through moulding, assembly and pack-out, while a catheter adds extrusion and a bonding step. Every order picks up the routing for the device being built.

What happens when a step fails a gauge check?

The operator flags it. The lot goes on hold. Quality reviews the reading, then decides on rework or scrap. That decision is recorded against the step and the order stays open until it is settled.

Does the order record which press ran each step?

It does record them. The press, the mould cavity or extrusion line and the equipment used are held on the order and its steps. A later question about one machine is answered by looking up the orders it ran.

Where it fits

How this feature fits the system.

Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Bills of materials and revisions

Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.

Bill of Materials

Production orders and routings

Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.

Work Order Management

Lot, serial and UDI records

Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.

Batch and Serial Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements