Skip to main content
GullySystem

Bills of materials with revisions for devices

Each device is held as a list of components and quantities, with a revision letter and an effective date. When a supplier changes a polycarbonate grade or a gasket is replaced, a new revision takes over on the floor from its date. Planners, quality staff and operators all build from one current list.

What a device bill of materials records

A bill of materials is the recipe for one device. It lists every component, its quantity and the revision letter, together with the date that revision takes effect. Notes record why the list changed. Housings, tubing, gaskets, pouches and labels all sit on the same list.

Components and quantities

Each line holds a part number, a description, a unit of measure and the quantity used per device. Housings, gaskets and pouches are counted one by one on the line. Tubing is given as a cut length.

Revision letter and effective date

Every list carries a letter such as A, B or C and the date it starts. The date decides what the floor builds. Revision B stays on record after revision C arrives, so history is complete.

The reason for each change

A revision records what moved and why. A supplier may switch a polycarbonate grade, or a worn gasket may be replaced by another size. The note stays with the revision, ready for an auditor or a new engineer.

Approver and release status

A draft list is not a live list. Each revision shows who prepared it, who approved it and the date it was released. Only an approved revision can be picked by a production order, which keeps drafts off the floor.

A revision moving through the plant

A device change never stays on the drawing board. It passes from engineering to the planner, the cleanroom and the stores shelf. Follow one revision on its way. The steps below show where an old printed list used to cause trouble.

Engineering raises revision C

A resin vendor drops a grade. Engineering swaps the housing material for an alternative grade. The engineer copies revision B, edits the housing line and sets an effective date. Nothing changes on the floor until that date arrives.

The planner releases the next lot

A planner opens a production order after the date. The system offers revision C. It is the only one on offer. Orders opened before the date keep revision B, so no single lot is ever built from mixed lists.

An operator checks the screen

At the moulding cell, an operator opens the order and sees the components for the revision named on it. A printed sheet of revision B on the wall no longer matters. The screen is current.

Stores picks the right part

A stores clerk reads the pick list for the lot and sees the new housing resin. The old one is gone. Leftover stock of the earlier grade is flagged so it is not issued to the new order by habit.

Who reads the bill of materials and how

Everyone builds from the same list, but each person looks at a different part of it. Roles see what they need and little else. That keeps the screen quick to read at a press or a bench.

For quality and regulatory teams

These staff review each revision before release and compare it with the previous letter. The differences are listed line by line. Approval and its date are kept, so the record answers an auditor’s question directly.

For production planners

Planners pick the revision a production order will use and read the components it needs. A shortage shows up before release. That gives time to buy or move the order. A part missing from stock is seen early.

For operators and technicians

Operators see only the components for the step in front of them on the cell screen. A gasket size or a tubing length appears beside the work instruction. They flag a mismatch. Nobody guesses at the bench, and nobody builds from memory.

For purchasing and stores

Buyers read the bill to see which parts each revision needs and which vendors supply them. Stores see when an older component stops being consumed. They plan the last receipts. Returns to the vendor are planned too.

Choices to make before loading device lists

Loading bills of materials is the heaviest part of set-up, so a few decisions help early. Settle them with the quality head and a senior planner. They set how strict the revision rules will be on the floor. Each choice is plain to explain.

Who may create a revision

Choose who can draft a new revision and who must approve it. Engineers draft. The quality head approves. Your own sign-off order decides who signs. Both names are recorded, and a revision cannot take effect without the second one.

What stays off the list for bills of materials with revision history

Decide whether consumables such as cleaning wipes, gloves or packing tape belong on the bill. Some makers include them, others cost them separately. The list should hold what a regulator or customer expects to see.

How current lists come across for bills of materials with revision history

Existing lists are imported from your spreadsheets or present system, with their revision letters intact. Quality staff test a sample against the controlled drawings. Differences are corrected before any order uses a list. Nothing goes live untested.

Which comparison to read first for bills of materials with revision history

Pick the check the team will run first. Some start by comparing two revisions of one device. Others begin with a where-used list for a component. Whichever you choose is opened first on the screen.

How the bill of materials feeds other records

The list is read by almost every other part of the product. A production order takes its components from it, stores picks against it and inspection plans refer to its parts. When the list is right, those later records start right too. That is why it is loaded first.

  • Gives production orders their components and quantities
  • Names parts that incoming inspection must check
  • Lets stock show shortages before a lot is released
  • Pulls specification revisions from controlled documents
  • Supplies component lots to lot, serial and UDI records

Where the bill of materials stops

This feature holds the list and its history. It does not design the device, judge whether a material change is safe or decide whether a change needs a regulator’s notice. Those calls stay with engineering, your quality head and your regulatory adviser. If you make one simple device with a handful of fixed parts, a controlled spreadsheet may be enough.

FAQ

Frequently asked questions

Can I see what changed between revision B and C?

Both revisions stay on record. They can be compared line by line on one screen, with added, removed and changed components listed together and the reason noted. That is the first question an auditor asks.

What if a revision is wrong after release?

Raise a new revision with a corrected list. The faulty one stays on record, marked as superseded. History is never overwritten, so anyone reading later can see what was built, from which list and on which date.

Can one component appear on several device lists?

It can appear on several lists. A common gasket or pouch is held once as a part and used on every list that needs it. A where-used search shows every device a component touches, which helps when a supplier changes it.

Do open production orders switch revision automatically?

No, an order keeps the revision it started with. One lot is built from one list. Orders released after the effective date pick up the new revision. Planners can see which orders still carry the old one.

Can a draft revision be prepared in advance?

Engineering can prepare a draft ahead of time and leave it unreleased. The floor never sees it. No order can pick it by accident, and nobody builds from an unapproved list. Once approved, it takes effect on the chosen date and replaces the earlier letter from that point.

Where it fits

How this feature fits the system.

Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Bills of materials and revisions

Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.

Bill of Materials

Production orders and routings

Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.

Work Order Management

Lot, serial and UDI records

Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.

Batch and Serial Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements