Incoming, in-process and final inspection for device lots
An inspection plan is set for each part and device, with sampling levels and acceptance limits for lumen, torque, particulates and seal peel strength. Inspectors record measurements and a pass or fail result at the incoming, in-process and final stages. A failed lot is held from release until quality decides what happens to it.
What an inspection plan and its results record
A plan lists the checks. A result is what was measured on one lot. The two are kept apart. A plan can be revised later without altering anything recorded under the earlier version. That matters when a hospital asks about an old lot.
Inspection from the dock to the pack-out bench
Checks happen at three points. Components are looked at when they arrive, parts are measured while they are made, and the finished lot is tested before release. One ordinary day in a device plant touches all three, from the dock to the pack-out bench.
Who records and who reviews inspection results
Inspection records are read by more people than write them. Failed lots are listed before passed ones, so the urgent items come first on every screen.
Decisions to settle before plans are built
Plans reflect your quality system. The first job is to gather the forms you already use. Sit down with the quality head, a senior inspector and a planner. They will settle the points below.
How inspection links to other device records
Results are the evidence behind a release. They arrive from the floor, attach to the lot and travel on to every report that asks whether a device was checked. The connections below are the ones planners and quality staff notice every day of the week.
- Holds incoming lots in quarantine stock until passed
- Reads the parts to check from bills of materials
- Blocks release of failed lots on production orders
- Attaches every result to the lot, serial and UDI record
- Shows failures by supplier on supplier approval records
Where inspection records stop
This feature stores plans and results. It keeps a failed lot from release. It does not choose your sampling levels or acceptance limits, calibrate gauges or run laboratory tests. Those stay with your quality head and the people who own the equipment. A maker with a single simple device and a short check list may find a signed sheet is enough.
Frequently asked questions
Can each part have its own inspection plan?
Each part and each device has its own plan. A moulded housing is checked for different things than a pouch or a catheter. Stages differ too. Incoming, in-process and final checks of a device hold separate limits.
What stops a failed lot from being shipped?
A fail places the lot on hold. A held lot cannot be released on its production order or packed against a customer order. It stays held until quality records a decision on rework or scrap.
Where do outside laboratory results go?
They are recorded on the lot, against the check they answer. Examples are endotoxin and bioburden. The inspector enters the figure or attaches the laboratory’s report. Both routes leave the result visible beside the other checks.
Can operators enter in-process gauge readings themselves?
They can, and it takes little time. Operators record steps and gauge readings from the shop floor screen, with the limit shown beside the field. Any reading outside the limit is flagged on entry. The operator can raise a problem straight away.
How do failures by supplier get reviewed?
A report lists inspection failures by part and by supplier. Quality and purchasing open it together. They do this before a supplier review. It shows which vendor’s lots failed, on which check and on which date.
How this feature fits the system.
Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Bills of materials and revisions
Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.
Bill of MaterialsProduction orders and routings
Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.
Work Order ManagementLot, serial and UDI records
Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.
Batch and Serial TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements