Lot, serial and UDI records for device makers
Every component lot and finished lot is numbered, and serial numbers are assigned where a device needs them. Label data, including UDI-DI and UDI-PI fields, is held with the lot. One search traces a device forwards to the hospitals that received it or backwards to the resin it was moulded from.
What the lot, serial and UDI record holds
A lot is a batch with a name. The lot record joins the numbers on a label to the parts, the production steps and the customers behind them. Some devices are tracked by lot and others by serial number, and that choice is made part by part.
Lot records through a working week at the plant
Numbers begin at the dock. They are used at the press and read again at the despatch bench. Following one resin lot and one device lot through a single busy working week shows who touches the record, and exactly when.
What each person sees on a lot record
One lot record has several views. Each role reads the part that matches its job. No one has to ask another department for a number, because the number is already linked.
Decisions to settle before numbering starts
Numbering rules are hard to change once labels are in hospital stores. Agree them with quality, stores and production before the first real lot is created. A short workshop settles the points below.
How lot records connect to the other features
Lot numbers run through everything. They begin in goods receipt, pass through production and inspection, and end on a delivery note at the despatch bench. Each feature adds its own facts to the lot, so the record is built as work goes on, step by step.
- Takes component lots from stock and goods receipt
- Receives finished lot numbers from production orders
- Attaches inspection results to each lot record
- Passes lot and serial numbers to delivery notes
- Gives complaints the lot a customer reports
Where lot, serial and UDI records stop
This feature holds numbers, label fields and links. It does not decide which UDI format your market requires, and it does not register devices with any authority. Those choices belong to your regulatory adviser. Any recall decision rests with your quality head. A maker with a single product and one batch sheet may not need more than paper.
Frequently asked questions
What does a trace report show for one lot?
It shows the component lots consumed, the inspection results, the production order and the customers shipped to. Everything sits on one page. A hospital query or an audit question can be answered from that page.
Where does a supplier’s own lot number fit?
It is stored beside your component lot number. Your number is used inside the plant, while the supplier’s number lets you match their certificates and warnings. Either can be searched, and both lead to the same record.
Which label fields are held with a lot?
The fields you set, including UDI-DI and UDI-PI values, the lot or serial number and any text your customer asks for. Label printers draw on these fields. Your regulatory adviser decides which ones a market requires.
What happens to the lot record when a lot is rejected?
The record stays. Its status shows it as held or rejected, and the failed result remains attached. Nothing is deleted, so the lot can still be traced later, and the decision on rework or scrap sits beside it.
How is a returned device matched to its lot?
The operator or quality clerk enters the lot or serial number printed on the pack. The complaint opens against that lot. From there the full history of parts, steps and checks is one click away.
How this feature fits the system.
Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Bills of materials and revisions
Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.
Bill of MaterialsProduction orders and routings
Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.
Work Order ManagementLot, serial and UDI records
Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.
Batch and Serial TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements