Skip to main content
GullySystem

Lot, serial and UDI records for device makers

Every component lot and finished lot is numbered, and serial numbers are assigned where a device needs them. Label data, including UDI-DI and UDI-PI fields, is held with the lot. One search traces a device forwards to the hospitals that received it or backwards to the resin it was moulded from.

What the lot, serial and UDI record holds

A lot is a batch with a name. The lot record joins the numbers on a label to the parts, the production steps and the customers behind them. Some devices are tracked by lot and others by serial number, and that choice is made part by part.

Component lot numbers

Each receipt of resin, tubing, gaskets or pouches creates a component lot. The lot number follows the material into production. A supplier’s own lot number is held beside yours so the two can be matched.

Finished lot and serial numbers

A finished lot receives its number when the production order is released by the planner. Serial numbers are added to each unit where a device is tracked one by one. The choice is per part, not per plant.

UDI-DI and UDI-PI label fields

Label data sits with the lot record. The UDI-DI fields describe the device, while the UDI-PI fields change with each lot or serial. Both are held where a market asks for them, and label printers draw on them.

Links to parts and customers

Each finished lot links to the component lots it consumed and to the customers it was shipped to. These links make a trace possible in both directions. They are made as work is recorded. Nobody types them afterwards.

Lot records through a working week at the plant

Numbers begin at the dock. They are used at the press and read again at the despatch bench. Following one resin lot and one device lot through a single busy working week shows who touches the record, and exactly when.

Tubing arrives at goods receipt

A storekeeper receives silicone tubing at the dock, and the system creates component lot C-2210. The supplier’s lot number is typed beside it for matching later. The tubing waits in quarantine. It cannot reach the cleanroom early.

The cell consumes the lot

An operator scans the barcode on the lot being built and then on each component lot drawn. Each scan links the two records. Nobody copies numbers by hand, so a mistyped digit cannot break the chain.

Labels print for the finished lot

When inspection passes device lot D-0417, a technician prints labels at the bench. The fields come from the lot record, including the UDI-DI and UDI-PI values. No one retypes them. Customers can scan the barcode on arrival.

A bad resin lot is reported

A resin vendor warns that one lot may be out of specification. The quality head searches that lot number. One search lists every finished lot made from it, and each hospital that received them, with the shipment dates.

What each person sees on a lot record

One lot record has several views. Each role reads the part that matches its job. No one has to ask another department for a number, because the number is already linked.

For quality and regulatory teams

These staff run the trace report for any lot, in either direction, forwards or backwards. One page lists component lots, inspection results and shipments for the lot. Audits start there. So do customer questions about a single device.

For operators and technicians

Operators scan lot barcodes at the cell and see only what is needed. Each scan adds a component lot to the order. They record the step and carry on. The link is made for them.

For purchasing and stores

Stores create component lots at receipt and issue them by lot to production. Buyers can open a supplier’s lot and see the finished lots that used it. Returns are matched. The right lot goes back to the vendor.

For owners and quality heads

Owners see lots in production and lots awaiting release. Counts are shown. Any figure on the screen opens to the lot behind it. A head of quality can answer a hospital’s query by opening one record instead of three separate files.

Decisions to settle before numbering starts

Numbering rules are hard to change once labels are in hospital stores. Agree them with quality, stores and production before the first real lot is created. A short workshop settles the points below.

Who may change a lot record for lot serial and udi records

Decide who can edit label fields and lot data, and at what point the record is locked. After release, changes should need a reason and a second name. Your quality head signs off the rule.

Which parts are tracked and how

List the parts tracked by lot, those tracked by serial number and those not tracked at all. A cleaning wipe may not need a lot record. A catheter hub probably does. The list is yours.

How earlier lot history comes across

Open lots and current stock are imported from your spreadsheets or present system with their numbers intact. Closed history can stay in your old files. Quality staff test a few traces against shelf stock before go-live.

Which trace to open first

Choose the trace the team will run first. Lot trace from finished device to component lots and shipments is a natural choice. Pin it to the quality head’s screen, so that it opens first each day.

How lot records connect to the other features

Lot numbers run through everything. They begin in goods receipt, pass through production and inspection, and end on a delivery note at the despatch bench. Each feature adds its own facts to the lot, so the record is built as work goes on, step by step.

  • Takes component lots from stock and goods receipt
  • Receives finished lot numbers from production orders
  • Attaches inspection results to each lot record
  • Passes lot and serial numbers to delivery notes
  • Gives complaints the lot a customer reports

Where lot, serial and UDI records stop

This feature holds numbers, label fields and links. It does not decide which UDI format your market requires, and it does not register devices with any authority. Those choices belong to your regulatory adviser. Any recall decision rests with your quality head. A maker with a single product and one batch sheet may not need more than paper.

FAQ

Frequently asked questions

What does a trace report show for one lot?

It shows the component lots consumed, the inspection results, the production order and the customers shipped to. Everything sits on one page. A hospital query or an audit question can be answered from that page.

Where does a supplier’s own lot number fit?

It is stored beside your component lot number. Your number is used inside the plant, while the supplier’s number lets you match their certificates and warnings. Either can be searched, and both lead to the same record.

Which label fields are held with a lot?

The fields you set, including UDI-DI and UDI-PI values, the lot or serial number and any text your customer asks for. Label printers draw on these fields. Your regulatory adviser decides which ones a market requires.

What happens to the lot record when a lot is rejected?

The record stays. Its status shows it as held or rejected, and the failed result remains attached. Nothing is deleted, so the lot can still be traced later, and the decision on rework or scrap sits beside it.

How is a returned device matched to its lot?

The operator or quality clerk enters the lot or serial number printed on the pack. The complaint opens against that lot. From there the full history of parts, steps and checks is one click away.

Where it fits

How this feature fits the system.

Medical Device Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Bills of materials and revisions

Each device is stored as a revisioned list of components and quantities, so planners release production against the current build and not an older printout.

Bill of Materials

Production orders and routings

Every lot gets a production order with its routing, press and operator, and each step is recorded as the cell finishes it.

Work Order Management

Lot, serial and UDI records

Component lots, finished lots and serial numbers are linked, so one search follows a device to its hospitals or back to its resin.

Batch and Serial Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements