Rejects, stripping and replating log

Rejected pieces cost acid, labour and tank time twice. This feature logs each reject with its cause, sends the pieces to strip and replate, and joins the cost to the same lot. The owner sees what rework costs by customer and by part. The line sees which cause keeps coming back.

From a rejected rack to a replated lot

A rack comes out of the tank and something is wrong. Parts are burnt at the edges, or rough, or too thin. Without a record, the pieces simply go back through the line. With one, the shop learns what each failure costs. That is the point.

Burning found at unloading

An operator spots burnt edges on a rack of housings. The pieces are logged against the lot with burning as the cause. The count rejected is entered. The rest of the lot continues. Nothing gets mixed up.

The strip tank queue

Rejected pieces are sent to strip. The record shows which lots wait for the strip tank and why. The supervisor sees the queue next to ordinary work. Rework does not get lost behind new lots.

A replated lot returns to inspection

After strip and replate, the pieces go back through the route. They meet the gauge again. A second failure is logged against the same lot. The history shows every attempt, not only the last.

The cost question at month end

At month end, which customers cost more than the rest to rework? Answers come from the log. Answers arrive by customer and part. Strip and replate cost sits against each. A part that quietly loses money becomes visible.

Reject fields behind the cost figures

A reject entry is short, but its value comes from being consistent. Cause, count and cost are recorded the same way each time. Only then can the shop compare one customer or one part with another. Sameness makes comparison fair.

Cause chosen from the shop’s list

Burning, roughness, low thickness and the shop’s other causes are picked from a list, not typed freely. Free text cannot be counted. A short list lets the log show which cause leads and which tank sits behind it.

Pieces rejected per lot

Each entry states the number of pieces that failed out of the lot. The rest carry on. The count feeds the dispatch tally, so the shortfall against the delivery note is explained. Nothing vanishes without a record.

Strip and replate steps taken

Strip, then replate, then inspection makes up the rework route, and it is recorded. A piece may go round more than once. Each pass is logged. The record shows the number of attempts a lot needed.

Rework cost against the lot

The acid, labour and tank time spent on each rework job are costed to the lot. Totals by customer and part follow. The figures are the shop’s own. The system adds them up and shows them side by side.

Who logs a reject and who reads the cost

Rejects are logged at the bench but read in the office. The two ends need to agree on what each entry means. Entries stay short.

For the operator logging a cause

Picks the cause from the list and enters the count. Does not need to cost anything. A quick entry at the unloading bench means the cause is fresh, not a vague recollection at the end of the shift.

For the quality inspector choosing strip

Reviews a failed lot and decides whether to strip and replate. Records the decision against the lot. Sees whether the same cause keeps appearing. The pattern may point at a bath or a rack.

For the planner rebooking the lot

Receives the rework as a new queue entry on the schedule. Moves it up if a due date is close. Tells the customer when the lot will be ready. Answers are factual. They come from the record, not from a guess.

For the owner reading rework cost

Sees rework and strip cost by customer, and rejects by cause and part. Decides which parts need a price review. Knows which customer’s work is eating margin. Action starts from the figures.

How rejects connect to the rest of the line

A reject entry is rarely the end of the story. It starts from an inspection result and ends in a replated lot. On the way it touches the schedule, the bath records and the invoice. Each link keeps the story in one place. It runs from first failure to final delivery.

  • Failed inspection results open the reject entry
  • Strip and replate steps join the lot’s route
  • Replated lots return to thickness and inspection
  • Rework cost by customer informs price list reviews
  • Reject causes point back to baths and racks

Settling how rework is named and counted

Rework data is only useful when it is consistent. Different habits at the bench make the figures meaningless. A few agreements come first. They decide whether the cost figures can be trusted at all.

Which causes appear on the list

A list of three causes is too crude. A list of thirty is ignored. Agree a working set with the supervisor and the quality inspector. Revisit it once the log shows which causes really occur.

Who authorises a strip

Stripping uses acid and tank time. Decide whether the quality inspector alone can send pieces to strip, or the planner must agree. The authoriser’s name is recorded. It settles later arguments.

How rework cost is counted

Acid, labour and tank time can be costed by the hour, by the load or by a flat figure. Choose one method and keep to it. Different methods across lots make the totals incomparable.

Whether the customer hears first

Some customers want to be told before rework begins. Others only care about the delivery date. Record which is which per customer. The planner then knows who to call before the pieces go to strip.

What the reject log leaves to the owner

The log shows what failed, what it cost and which cause led. It does not decide whose fault a failure was, and it does not charge a customer for rework. Pricing and blame stay with the owner. A shop that rarely rejects a piece may only need a note in a book. Volume decides the matter.

FAQ

Frequently asked questions

Can the same piece be rejected twice?

Each pass through strip, replate and inspection is logged against the lot. A second failure adds a second entry with its own cause. The history shows every attempt. Repeated rework on one lot is plain.

How are reject causes chosen?

The shop keeps a short list, with causes such as burning, roughness or low thickness. The operator picks one at the bench. Free text is avoided so the totals by cause are counted without a clean-up.

Where does the cost of stripping come from?

Acid, labour and tank time are the shop’s own figures. They are entered for each rework job and tied to the lot. The system adds them up by customer and part. Totals appear on one screen.

Does a replated lot need a new work order?

The rework joins the schedule as a queue entry linked to the same lot. The planner can raise its priority. The lot number stays, so the customer’s paperwork still points to one delivery from start to finish.

Can we see which part loses money on rework?

Strip and rework cost is reported by customer, and rejects are reported by cause, customer and part. Read together, they show which part keeps returning to strip. The pricing decision stays with you, the owner.

Where it fits

How this feature fits the system.

Plating Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Customer lots and receiving

Every delivery is booked in as a numbered lot with count and weight, so the same parts can be traced from the gate to dispatch.

Batch and Serial Tracking

Work orders and line scheduling

A work order carries the finish, thickness and due date, and each tank sees which lots are queued next on its route.

Work Order Management

Racks, barrels and loading

Lots with a compatible finish are grouped onto racks or into barrels by count and surface area, before they enter the first bath.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements