Plating specifications and process routes

A plating shop runs the same part again and again, and each run has to meet the customer’s finish, thickness and test requirement. This feature holds those limits for every part, with the ordered tank steps that produce them. Planners write the route once. Operators and the laboratory then work from it.

A new drawing lands on the planner’s desk

A customer sends a drawing for a part the shop has never run. Nobody can issue a work order until the finish, thickness and tests are written down. The planner builds the part entry once. Every later lot of that part follows it. Nobody asks again.

A drawing arrives by email for specifications and process routes

Reading the callout for zinc, thickness and passivation comes first. Finish and limits are keyed against the part number. Steps the shop already runs make up the route. The drawing stays with the part entry.

The customer tightens a limit

One customer raises the minimum thickness on a housing. Amending the part entry comes next, with the date noted. Later lots use the new figure. Work already issued keeps its old limit.

The operator reaches the barrel

At the line, the operator opens the lot and sees the steps in order, from degrease through pickle and plate to passivate and bake. The next tank is named. Nobody relies on memory of how the part went last time.

The technician checks which test applies

The laboratory technician looks up which adhesion or salt spray check the part carries. The test sits on the part entry. No notebook holds it. A test added later applies from the next lot.

Specification fields and route steps held per part

Each part entry joins a requirement to a method. The requirement is what the customer’s drawing demands. The method is the shop’s own sequence of tanks. Keeping both on one record means a lot is judged against the limit that applies to it, nothing else.

Finish and plating type

Zinc, nickel, chrome, anodising or passivation, with any colour or class the customer names. This field decides which baths a lot will meet and which certificate wording applies. It is chosen from the shop’s own list.

Thickness limits and units

The minimum and maximum thickness from the drawing are stored with their unit. Inspection reads each gauge result against these two figures. A low reading stands out. It sits right beside the limit it missed on the lot.

Test requirement for the part

Adhesion, salt spray, appearance and gauge checks are listed per part and per finish. The laboratory sees only the checks that part needs. The customer asks for an extra test once. After that it stays on the part for good.

Ordered tank steps

The route lists each tank step in sequence, such as degrease, pickle, plate, passivate and bake. An anodising shop adds dye and seal. The operator follows the list, and a skipped step is easy to spot.

Who reads a route and who changes it

Everyone on the line meets a route, but only a few people should edit one. Each role below sees the same part entry in a different light. Planning owns the wording. The others rely on it being right.

For the planner who writes the routes

Creates the part entry, sets finish and limits, and picks the tank steps. Reads each customer’s drawing against what is keyed in. Later changes are theirs to make.

For the operator following the steps

Sees the next tank for the lot and the steps that follow. Marks each one done. Has no reason to read thickness limits, but sees the finish name so a zinc lot is never put into a nickel tank.

For the chemist and technician reading limits

Reads thickness limits and the tests attached to the part. Enters results against those limits. A test that is missing from the part is raised with the planner, not added quietly at the bench.

For the owner pricing a new part

Sees the steps a finish needs and which tanks it ties up. That is useful when a quote is prepared for a part with an unfamiliar finish. The work is visible. The price stays the owner’s decision.

Where a route and its limits get used

A stored route is read by nearly every other feature in the product. Finish, thickness limits and steps are copied forward as a lot is received, issued, inspected and certified. Edits happen in one place. The change flows through to every lot issued afterwards, so nobody chases copies.

  • Lot receiving looks up the finish by part number
  • Work orders copy the route and the required finish
  • Inspection judges readings against the stored thickness limits
  • Certificates quote the specification and the process used
  • Bath schedules follow the baths each route names

Choices to settle before routes are keyed in

Keying in the first hundred parts is quick. The harder work is agreeing how the shop will treat exceptions. A few rules set at the start save arguments on the line later. Planner and chemist should settle them together.

Who may amend a thickness limit

A limit copied from a drawing carries a customer’s authority. Decide whether the planner alone may amend it or the quality inspector confirms. Apply one answer to every part. Exceptions breed disputes.

One route or one per finish

A bracket may be zinc for one customer and nickel for another. Decide whether each pairing is its own part entry. Separate entries keep thickness limits apart. Certificate wording then stays simple.

Where a drawing revision is kept

Customers revise drawings at short notice. Choose whether the old revision stays on the part entry once a new one arrives. Parts on the racks may need the older limit to be judged fairly.

How today’s route sheets are keyed

The shop already has route cards on paper or in a spreadsheet. Decide which are brought in first, and who reads each entry against the card. Start with the parts that run every week.

Limits of a stored route

A route records the method the shop has chosen. It does not judge whether that method suits the part. It does not change bath chemistry. The customer sets the requirement and the chemist sets the process. Both stay outside the software. A shop with one finish and a handful of parts can keep a printed route card.

FAQ

Frequently asked questions

Can one part number carry two finishes?

Each pairing of part and finish is held as its own entry, with its own limits and steps. The lot picks the one the customer ordered. A zinc and a nickel version of one bracket never share thickness limits.

What happens to lots on the line when a drawing changes?

Orders already issued keep the limits they started with. New lots use the revised figures from the date recorded. The old entry stays readable, so a dispute about an earlier lot can still be settled. Records do not vanish.

Can a bake step follow the plating tank?

Bake is a step in the ordered list like any other. The operator sees it queued after passivation. The step order is whatever your line follows, and the planner can add or remove a step on the part.

Who writes the routes when we start?

Process routes, the bath list and finish specifications are keyed in from your route cards and the customers’ drawings. Your planner reads each entry before the line relies on it. Edits later on can be handled by GullySystem staff when asked. That saves your planner the work.

Can several parts share one route?

Parts with the same finish and steps can point to one route, and each keeps its own thickness and tests. Changing a shared step touches every part using it. That edit stays with the planner.

Where it fits

How this feature fits the system.

Plating Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Customer lots and receiving

Every delivery is booked in as a numbered lot with count and weight, so the same parts can be traced from the gate to dispatch.

Batch and Serial Tracking

Work orders and line scheduling

A work order carries the finish, thickness and due date, and each tank sees which lots are queued next on its route.

Work Order Management

Racks, barrels and loading

Lots with a compatible finish are grouped onto racks or into barrels by count and surface area, before they enter the first bath.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.