Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for plating companies.

A checklist built from how plating companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Customer lots and receiving
  • Process routes and work orders
  • Racks, barrels and loading
  • Bath analysis and chemical additions
  • Thickness, adhesion and inspection results
  • Rejects, rework and stripping
  • Certificates, packing and dispatch
  • Rack and barrel maintenance
  • Effluent and waste treatment log
  • Customer specification and plating standard

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For planners and the front office
  • For line operators
  • For chemists and lab technicians
  • For stores and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Lots on the line by stage and due date
  • Bath analyses overdue by tank
  • Thickness readings by lot and specification
  • Rejects by cause, customer and part
  • Rework and strip cost by customer
  • Chemical use by tank and month
  • Dispatched lots awaiting invoice

Systems it may need to connect to

Note which ones you already run.

  • Email
  • SMS
  • Accounting software export
  • Spreadsheet import
  • Barcode or label printing
  • Gauge readings by file import

Questions for any vendor

Put these to every supplier you are comparing.

  • Are customers’ parts kept separate on the line?
  • Can it work for anodising, galvanising or electroless nickel?
  • How are bath analyses recorded?
  • Can thickness readings be attached to a lot?
  • How does it price a lot?
  • Can it print a certificate of conformance?
  • Are rework and rejects tracked?
  • Are effluent and waste records held?
  • Can we move our customer lists and open lots?
  • What is the price, and how do we see a demo?
  • How long before the line runs lots through it?
  • What should the plating shop bring beforehand?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Lots lose their identity
  • Bath records sit on a clipboard
  • Thickness results are not tied to the lot
  • Pricing changes by customer and part
  • Rework and rejects are not costed

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Process routes and work orders

Is the plan based on demand that is still open?

Review “Process routes and work orders” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Thickness, adhesion and inspection results

Who decides whether a failed result blocks the next step?

For “Thickness, adhesion and inspection results”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Prefer to talk it through? See the plating companies page.