What to ask for when choosing software for electrical equipment manufacturers.
A checklist built from how electrical equipment manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Order-wise bill of materials with revisions
- Shortages turned into purchase orders
- Job cards through each shop stage
- Test readings and inspection hold
- Powder coating and outside machining
- Dispatch, invoices and order outstanding
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners
- For production planners
- For shop floor supervisors and operators
- For stores and purchase staff
- For accounts and dispatch
Reports to ask for
Ask to see each one with your own sample data.
- Work orders still open, grouped by stage and promised week
- Production by stage, machine and operator each shift
- Material consumed against the bill of materials
- Rejection and scrap by stage and reason
- Job work out, returned and short, by job worker
- Bar, sheet and resin stock against shortages
- Dispatches and buyer outstanding by order
Systems it may need to connect to
Note which ones you already run.
- SMS
- Payment links and gateways
- Accounting software export (quoted separately)
- Barcode or label printers
- Weighing scales
- Biometric attendance devices
Questions for any vendor
Put these to every supplier you are comparing.
- Can a bill of materials nest levels?
- How is material issue tied to a work order?
- Can we plan against machine capacity?
- Does it give the cost of a batch?
- Can rejections and scrap be counted stage by stage?
- Does it track outside job work?
- Can operators mark cards on a phone?
- What about drawing revisions?
- Will these figures go into my accounting package?
- Do we need this with two machines?
- How soon could the shop floor run job cards on it?
- What does a factory prepare before the first meeting?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Drawing approval stalls unnoticed
- Bought-out items arrive after the enclosure
- The wiring bay builds from an old print
- Test reports are typed again for each dispatch
- The last instalment drifts out of sight
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Order-wise bill of materials with revisions
Which version applies to work that has already started?
Use a revised example from “Order-wise bill of materials with revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Shortages turned into purchase orders
Does receiving less than ordered leave the correct quantity open?
Bring a short delivery to the “Shortages turned into purchase orders” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.
Background reading: ERPNext: purchase receipts
Prefer to talk it through? See the electrical equipment manufacturers page.
