Match every debit note to the invoice, part number and lot it names, then set it beside your own dispatch and rejection records before accepting it. That needs lot-wise records kept as parts are made. GullySystem’s production management product keeps work orders, stage rejections and dispatch together. Matching debits is an added register.
Ganesh HS, Strategy and Technology, GullySystem · · 3 min read
Sort debit notes by reason before anything else
Buyers raise debits for several reasons. Line rejections, short receipts, rate differences, packing deviations and freight recoveries each need a different check. Sorting them first tells you which record to pull.
Keep one list per buyer with the debit number, date, invoice referred to, part number, quantity and reason. A spreadsheet is enough to begin. What matters is that nobody accepts a debit before it is on the list.
- Line or field rejection of a part
- Shortage between invoice and the buyer’s receipt
- Rate difference after a price revision
- Packing, labelling or bin deviation
- Freight or sorting charges recovered
Match each debit to an invoice and a lot
A debit names an invoice, and an invoice covers a dispatch. If the dispatch record shows which work order and lot each bin came from, the debit leads back to production.
This is why lot-wise bin labels matter. A label carrying part number, quantity and lot links the buyer’s complaint to your floor. Handwritten labels break that link.
Where the buyer’s receipt shows less than you invoiced, check the delivery challan and the transporter’s copy. The gate entry at the buyer’s end settles many of these.
Set rejection debits beside your own inspection data
A line rejection says your part failed at the buyer’s assembly. Your job cards and final inspection readings for that lot show what you saw before it left. Both belong in the reply.
Count your internal rejection per part number, by stage and reason. If the buyer reports a defect your inspection never recorded, review the check itself. If your records show it too, the lot should not have shipped.
- Job cards for the lot, with shift and machine
- Final inspection readings for that lot
- Rejection and rework recorded at each stage
- Material lot issued to the work order
Decide who accepts, contests or escalates
Accounts usually sees the debit first, on a payment advice. Quality owns the technical answer, and sales owns the relationship with the buyer’s purchase team. Write down who decides at each step.
Keep the rule simple. Accounts logs, quality checks, and the owner approves anything contested. Debits left unanswered tend to stand.
File the buyer’s reply and your corrective action report with the debit. The next complaint on that part starts from that history.
What software can and cannot do here
Production software helps when work orders, stage rejections, lots and dispatch sit in one record. The trace from a debit to its lot then runs through one system instead of several files.
It does not decide whether a debit is fair. That judgement stays with your quality and commercial teams, and your agreement with the buyer sets the terms. Ask your adviser where a clause is unclear.
Supplier portals differ by buyer. Some offer exports of debits and receipts, which can be loaded instead of typed.
Debit note register
A sheet per buyer with columns for debit number, date, invoice, part number, lot, quantity, reason and status. Add a column for the record you checked and who decided. Open rows show which debits still need an answer.
Open a blank worksheet to printQuestions owners ask
Can the software read debit notes from a vehicle maker’s portal?
Not on its own. Debits are typed in or loaded from the export file a portal provides. A direct link depends on what each portal allows, and it is scoped buyer by buyer.
Does every debit need a corrective action report?
Not always. Shortages and rate differences need a commercial check. Quality debits usually bring a corrective action request from the buyer, and your reply belongs in the same register.
What if our bin labels carry no lot number today?
Start there. Print part number, quantity and lot on every bin label from the dispatch record. Without the lot, a rejection only leads back to an invoice.