Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for aerospace CNC part manufacturers.

A checklist built from how aerospace CNC part manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Drawing and revision control
  • Material traceability
  • First article inspection
  • Special process tracking
  • Nonconformance and concession
  • Data pack and shipment

Roles that need their own access

Who logs in, and what each person may see or change.

  • For quality managers
  • For planners
  • For machinists
  • For inspectors
  • For stores staff

Reports to ask for

Ask to see each one with your own sample data.

  • Lots held for first article approval or for a missing process certificate
  • Cast numbers issued and the brackets, ribs and fittings cut from each
  • Nonconformances by part number, cause and disposition
  • Turnaround of anodisers and penetrant testing houses by vendor
  • Quoted hours and material against actual cost for each closed lot
  • Drawing revisions released and the work orders running on each

Systems it may need to connect to

Note which ones you already run.

  • Email
  • CMM and gauge data import
  • Barcode and label printers
  • Accounting export
  • Document storage

Questions for any vendor

Put these to every supplier you are comparing.

  • Can a work order be released only against the current drawing revision?
  • How does heat number traceability work?
  • Can the first article report be entered here?
  • What if the part goes out for anodising or penetrant testing?
  • Does it record nonconformances and customer concessions?
  • Is serialising of individual parts supported?
  • Does the system certify us to a quality standard?
  • How are small lots quoted?
  • How is pricing decided?
  • Is an export available for a customer audit?
  • How long before the shop floor works from it?
  • What do you need from us before starting?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • A heat number gets separated from its part
  • Programs run at the wrong revision
  • Special process paperwork trails behind
  • First article reports are rebuilt by hand
  • Nonconformances stay informal

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Drawing and revision control

Which version applies to work that has already started?

Use a revised example from “Drawing and revision control” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Material traceability

Can you follow a suspect input through to the affected deliveries?

Pick one real record from “Material traceability”. Ask the team to trace its origin and identify the later work or deliveries it affected, including any split quantities.

Background reading: ERPNext: forward and backward traceability

Prefer to talk it through? See the aerospace CNC part manufacturers page.