What to ask for when choosing software for avionics hardware manufacturers.
A checklist built from how avionics hardware manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Approved sources and goods inward
- Bill of materials and build standard
- Kitting and moisture control
- Board line and inspection records
- Firmware and test record
- Repair and return history
Roles that need their own access
Who logs in, and what each person may see or change.
- For engineering leads
- For purchasing staff
- For line supervisors
- For test technicians
- For quality staff
Reports to ask for
Ask to see each one with your own sample data.
- Date codes and lots used in each unit serial
- Parts on allocation and the builds they affect
- Moisture-sensitive packages past floor life
- Firmware version loaded against build standard
- Burn-in and acceptance failures by fault and part
- Repairs by modification applied
Systems it may need to connect to
Note which ones you already run.
- Test equipment data import
- Firmware repository link
- Barcode and label printers
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- Can I see which date codes are inside a particular unit?
- How does the system handle approved alternates?
- Is a warning given for moisture-sensitive parts?
- Are firmware versions stored?
- How are repairs recorded?
- Can we separate parts on allocation?
- Will it certify us for airworthiness?
- Is test equipment connected?
- What does it cost?
- Can we take the serial histories with us later?
- When could goods inward and the board line start recording against serials?
- What should purchasing and test have to hand before we begin?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Date codes are lost after kitting
- Substitute parts are agreed by phone
- Firmware versions drift from the build standard
- Moisture exposure is not tracked
- Repairs return to the wrong standard
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Bill of materials and build standard
What changes when a component or quantity is substituted?
Take one entry from “Bill of materials and build standard” and change an input in a test copy. Review the resulting material requirement and cost with the person who approves production.
Background reading: ERPNext: bills of materials
Board line and inspection records
Who decides whether a failed result blocks the next step?
For “Board line and inspection records”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.
Background reading: ERPNext: inspection criteria
Prefer to talk it through? See the avionics hardware manufacturers page.
