What to ask for when choosing software for beverage manufacturers.
A checklist built from how beverage manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Packing material and ingredient stock
- Batch and production sheet
- Batch code and shelf-life stock
- Quality readings per batch
- Distributor and route orders
- Returnable empties ledger
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners
- For production planners
- For shop floor supervisors and operators
- For stores and purchase staff
- For accounts and dispatch
Reports to ask for
Ask to see each one with your own sample data.
- Work orders still open, grouped by stage and promised week
- Production by stage, machine and operator each shift
- Material consumed against the bill of materials
- Rejection and scrap by stage and reason
- Job work out, returned and short, by job worker
- Bar, sheet and resin stock against shortages
- Dispatches and buyer outstanding by order
Systems it may need to connect to
Note which ones you already run.
- SMS
- Payment links and gateways
- Accounting software export (quoted separately)
- Barcode or label printers
- Weighing scales
- Biometric attendance devices
Questions for any vendor
Put these to every supplier you are comparing.
- Can a bill of materials nest levels?
- How is material issue tied to a work order?
- Can we plan against machine capacity?
- Does it give the cost of a batch?
- Can rejections and scrap be counted stage by stage?
- Does it track outside job work?
- Can operators mark cards on a phone?
- What about drawing revisions?
- Will these figures go into my accounting package?
- Do we need this with two machines?
- How soon could the shop floor run job cards on it?
- What does a factory prepare before the first meeting?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- A batch cannot be traced to its materials
- Empties and deposits do not reconcile
- Line output is counted after the shift
- Packing material runs short without warning
- Distributor claims are hard to check
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Batch code and shelf-life stock
What happens to movements entered while a count is being checked?
For “Batch code and shelf-life stock”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.
Background reading: ERPNext: stock reconciliation
Packing material and ingredient stock
What changes when a component or quantity is substituted?
Take one entry from “Packing material and ingredient stock” and change an input in a test copy. Review the resulting material requirement and cost with the person who approves production.
Background reading: ERPNext: bills of materials
Prefer to talk it through? See the beverage manufacturers page.
