Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for construction material manufacturers.

A checklist built from how construction material manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Orders, price lists and dealer accounts
  • Mix designs and bills of materials
  • Production batches and planning
  • Test results and quality records
  • Raw material and finished stock
  • Weighbridge, dispatch and vehicles
  • Invoices, claims and dealer dues

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners and plant heads
  • For the sales and order desk
  • For production supervisors
  • For the lab and quality team
  • For stores, dispatch and accounts

Reports to ask for

Ask to see each one with your own sample data.

  • Orders open and delivered by dealer
  • Production by batch, line and shift
  • Raw material used against the mix design
  • Test results by product and batch
  • Finished stock by stage
  • Loads dispatched by vehicle and destination
  • Dues by dealer, oldest first

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp or other messaging
  • SMS
  • Email
  • Weighbridge indicator
  • Barcode scanners
  • Accounting software export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it handle products that need curing or firing?
  • Can a dispatched load be traced to its batch?
  • Can we compare actual material use with the mix design?
  • Does it work with a weighbridge?
  • Can dealers log in?
  • How are breakage claims handled?
  • Can open orders and stock be moved?
  • Who owns the data?
  • What does it cost?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Batches are not linked to tests
  • Mix and consumption drift apart
  • Stock is counted in several states
  • Dealer terms are scattered
  • Dispatch and billing are separate

Prefer to talk it through? See the construction material manufacturers page.