What to ask for when choosing software for cement product manufacturers.
A checklist built from how cement product manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Cement, sand and aggregate intake
- Mix batch register
- Moulding output by product
- Curing yard and tank age
- Cube and strength tests
- Breakage and handling losses
- Truck loading and delivery notes
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners
- For the batching and moulding crew
- For the yard and lab teams
- For dispatch and drivers
- For accounts
Reports to ask for
Ask to see each one with your own sample data.
- Cement used against pieces made, by product
- Mix batches outside recipe limits
- Stack stock by product, age and location
- Cube results by batch and age
- Breakage by stage, product and shift
- Dispatch by dealer, truck and product
- Dealer dues and credit notes
Systems it may need to connect to
Note which ones you already run.
- SMS
- Weighbridge
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- Does it set the mix by recipe?
- How does it handle sand moisture?
- Can I stop young stacks being sold?
- Are cube results tied to what was sold?
- Can the system handle breakage claims?
- Does it connect to a weighbridge?
- Do I need to enter every bucket of cement?
- What does the demo show?
- What can be exported?
- What decides the price for a block or pipe yard?
- When can the yard begin moving stacks on it?
- What does a yard need to have on hand?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Mix quantities are only roughly kept
- Curing age is not on the stack
- Cube tests are not tied to batches
- Breakage hides in several places
- Trucks are loaded by estimate
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Truck loading and delivery notes
Can a partial delivery be distinguished from a completed order?
For “Truck loading and delivery notes”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.
Background reading: ERPNext: delivery notes
Trucks are loaded by estimate
Which assumptions stop being valid when the quotation changes?
For “Trucks are loaded by estimate”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Prefer to talk it through? See the cement product manufacturers page.
