What to ask for when choosing software for cNC machining companies.

A checklist built from how cNC machining companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Drawing revisions held on the order
  • Operations and machines per part
  • Job cards by operation
  • Inspection readings and lot hold
  • Bar and forging stock by grade and size
  • Outside processing notes
  • Tool life and insert usage
  • Customer call-off schedule
  • Gauge and instrument calibration
  • Rejection and rework register

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For production planners
  • For shop floor supervisors and operators
  • For stores and buyers
  • For accounts and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Work orders still open, grouped by stage and promised week
  • Production by stage, machine and operator each shift
  • Material consumed against the bill of materials
  • Rejection and scrap by stage and reason
  • Job work out, returned and short, by job worker
  • Bar, sheet and resin stock against shortages
  • Dispatches and buyer outstanding by order

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateways
  • Accounting software export (quoted separately)
  • Barcode or label printers
  • Weighing scales
  • Biometric attendance devices

Questions for any vendor

Put these to every supplier you are comparing.

  • Can a bill of materials nest levels?
  • How is material issue tied to a work order?
  • Can we plan against machine capacity?
  • Does it give the cost of a batch?
  • Can rejections and scrap be counted stage by stage?
  • Does it track outside job work?
  • Can operators mark cards on a phone?
  • What about drawing revisions?
  • Will these figures go into my accounting package?
  • Do we need this with two machines?
  • How soon could the shop floor run job cards on it?
  • What does a factory prepare before the first meeting?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • The wrong drawing revision reaches the machine
  • Setup and first-piece time go uncounted
  • Rejections surface only at month end
  • A failed lot cannot be traced to its bar
  • Job work quantities never reconcile

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Drawing revisions held on the order

Which version applies to work that has already started?

Use a revised example from “Drawing revisions held on the order” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Inspection readings and lot hold

Who decides whether a failed result blocks the next step?

For “Inspection readings and lot hold”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.