Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for cNC milling shops.

A checklist built from how cNC milling shops work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Part and operation masters
  • Programme library with revisions
  • Fixture and soft-jaw register
  • Plate and block stock
  • Inspection plans and reports
  • Outside finishing
  • Quotes with programming time

Roles that need their own access

Who logs in, and what each person may see or change.

  • For the programming desk
  • For setters and machine operators
  • For inspectors
  • For estimators and the front office
  • For owners

Reports to ask for

Ask to see each one with your own sample data.

  • Operations by machine, with pieces made and balance
  • Programming hours and setup count against the quote
  • Programme revisions in use, by part
  • Fixtures by part and shelf location
  • Plate and block stock by grade, with certificate status
  • Inspection results by lot and dimension
  • Parts out for anodising or heat treatment, by vendor

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp or other messaging
  • Accounting export
  • Barcode labels
  • File server links

Questions for any vendor

Put these to every supplier you are comparing.

  • Does the system generate toolpaths?
  • Can a part be tracked across several operations?
  • How are fixtures tied to parts?
  • Can quotes include programming hours?
  • Is material traceable by plate?
  • Can we print inspection reports for buyers?
  • What data do we need to start?
  • How is the proposal priced?
  • Which shop-floor records would the setters see before everything else is built?
  • What registers and drawings should the estimator and setters supply?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • The right programme is hard to find
  • Operations get skipped or repeated
  • Fixtures and vises are not tied to parts
  • Programming hours are never costed
  • Aluminium plate is cut without a trail

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Inspection plans and reports

What does one row mean before totals are combined?

Choose one period in “Inspection plans and reports” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Programme library with revisions

Which version applies to work that has already started?

Use a revised example from “Programme library with revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Prefer to talk it through? See the cNC milling shops page.