Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for deep drawing companies.

A checklist built from how deep drawing companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Coil and blank register
  • Draw stage routing
  • Press and tool register
  • Annealing and washing batches
  • Wall thickness and height checks
  • Defect and scrap log
  • Outside plating and polishing

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For press supervisors
  • For the tool room
  • For quality inspectors
  • For stores and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Coils issued and remaining, with blanks cut and offcut weight
  • Lots by stage with count in, count out and the gap
  • Tool sets by strokes since polish, with sets due
  • Scrap by defect, press, stage and tool set
  • Wall thickness and height readings by lot
  • Plating counts out against counts back, by vendor
  • Orders due with the stage each lot has reached

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp or other messaging
  • Barcode and label printers
  • Weighing scales
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Where do lost shells show up?
  • Can I tell which coil a lot came from?
  • Does it track how worn a draw ring is?
  • How are anneal loads recorded?
  • Can thin-wall complaints be answered from the system?
  • Does it handle plating done outside?
  • Does the software approve parts?
  • Do operators need to type a lot of data?
  • What decides the price?
  • Can tool and lot data be taken out?
  • How long before the press shop counts lots here?
  • What should the shop floor bring along?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Stage counts and quantities drift apart
  • Sheet gauge and temper are not tied to the job
  • Tools are sharpened on feel
  • Annealing and plating batches mix
  • Wall thickness complaints arrive late

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Draw stage routing

Is the plan based on demand that is still open?

Review “Draw stage routing” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Prefer to talk it through? See the deep drawing companies page.