Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for drone component manufacturers.

A checklist built from how drone component manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Prepreg cold store and out-time
  • Layup and cure records
  • Motor winding and balance
  • Thrust stand and propeller tests
  • Cell grading and pack building
  • Board firmware and test

Roles that need their own access

Who logs in, and what each person may see or change.

  • For plant managers
  • For composite technicians
  • For motor and propeller line staff
  • For test engineers
  • For stores staff

Reports to ask for

Ask to see each one with your own sample data.

  • Prepreg rolls by remaining life
  • Cure cycle results by mould and oven
  • Thrust and vibration results by motor lot
  • Cell grades and pack capacity by cell lot
  • Firmware versions shipped by board serial
  • Rejects by part family and cause

Systems it may need to connect to

Note which ones you already run.

  • Email
  • Test stand data import
  • Oven controller export
  • Barcode and label printers
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • How is prepreg out-time handled?
  • Can cure cycles be kept with each frame?
  • How are battery packs traced?
  • Can thrust test results be stored per motor?
  • Is propeller balance recorded?
  • Does it track firmware on boards?
  • Does it handle rules for shipping lithium packs?
  • Can we run several part families at once?
  • How is the price set?
  • Can our serial data be exported?
  • How long before a line floor is logging builds?
  • What should we gather before the build?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Prepreg life expires unseen
  • Cure cycles live on the oven controller
  • Cells are mixed without grading
  • Thrust readings are scattered
  • Shipping rules for cells are an afterthought

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Shipping rules for cells are an afterthought

Can a partial delivery be distinguished from a completed order?

For “Shipping rules for cells are an afterthought”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Prefer to talk it through? See the drone component manufacturers page.