What to ask for when choosing software for electrical contractors.
A checklist built from how electrical contractors work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- BOQ with point and metre rates
- Store room and site material ledger
- Measurement sheet and running account bills
- Teams and piece-rate work
- Testing and approval records
- Maintenance contracts and call-backs
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners
- For estimators and the office
- For site supervisors
- For store keepers
- For technicians
Reports to ask for
Ask to see each one with your own sample data.
- Quotations and tenders open, won and lost by client
- Site cost against billing for each job
- Cable, conduit and switchgear issued to each site, and stock below reorder
- Technician and wireman attendance and labour cost by site
- Running bills raised, approved and pending, with the MB behind each
- Client balances, mobilisation and other advances, and retention held
- Service contracts and inspection visits due
Systems it may need to connect to
Note which ones you already run.
- SMS
- Bank transfer and payment gateway
- Accounting package export
- Biometric attendance
Questions for any vendor
Put these to every supplier you are comparing.
- Can the builder’s engineer approve a measurement before it is billed?
- Can quotations be built from our own point rates?
- Can material be tracked site by site?
- Does it handle RA bills against a BOQ?
- Can supervisors use it from the site without signal?
- Can job bills go into accounting software?
- Can maintenance contracts be managed?
- Can open sites and stock be moved in?
- Who owns the data?
- What does it cost?
- How soon can site supervisors begin logging material and attendance?
- What registers and rate lists should the estimator pull out?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Metres do not reconcile
- Copper price erodes margin
- Point counts are disputed
- Test reports go missing
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
BOQ with point and metre rates
Which assumptions stop being valid when the quotation changes?
For “BOQ with point and metre rates”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Maintenance contracts and call-backs
What proves that a planned task was actually completed?
Select an overdue entry in “Maintenance contracts and call-backs”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.
Background reading: ERPNext: maintenance plans
Prefer to talk it through? See the electrical contractors page.
