Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for electronic product manufacturers.

A checklist built from how electronic product manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Model master and bills of materials
  • SMT run and line records
  • Reel and moisture-sensitive part control
  • Test jig, ageing and final check
  • Packing, barcodes and carton counts
  • Dealer, brand and distributor orders
  • Warranty and dead-on-arrival returns

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners and plant managers
  • For production planners
  • For line supervisors and operators
  • For the quality and service teams
  • For purchasing and stores

Reports to ask for

Ask to see each one with your own sample data.

  • Runs by model, line and shift, with boards in, out and rejected
  • First-pass test yield by jig and by model
  • Opened dry bags and parts held for baking
  • Returns by date code, fault and supplier lot
  • Packed and dispatched quantities against each dealer order
  • Component cost against selling price by model
  • Outside assembly receipts and defect counts

Systems it may need to connect to

Note which ones you already run.

  • Barcode and label printers
  • Optical inspection and test jig logs
  • Email
  • SMS or WhatsApp
  • Accounting export
  • Courier tracking

Questions for any vendor

Put these to every supplier you are comparing.

  • How do colour and plug variants work?
  • Is the floor life of opened moisture-sensitive parts tracked?
  • How does a return lead back to a production run?
  • Can it print carton labels with barcodes?
  • Does it work with an outside SMT assembler?
  • What about brand-specific packing instructions?
  • Is a model costed before an order is accepted?
  • How long does it take to learn on the line?
  • What happens to our records if we leave?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Line yield is known only at month end
  • Moisture-sensitive parts expire unnoticed
  • A returned charger has no run behind it
  • Brand and dealer orders change often
  • Component prices move faster than quotations

Prefer to talk it through? See the electronic product manufacturers page.