Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for excavation companies.

A checklist built from how excavation companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Estimates and bids
  • Jobs and daily site logs
  • Machines, operators and allocation
  • Haulage and load tickets
  • Fuel, servicing and breakdowns
  • Progress claims and variations
  • Subcontract crews and rented machines

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For estimators
  • For site foremen
  • For the yard and workshop
  • For accounts

Reports to ask for

Ask to see each one with your own sample data.

  • Estimates open, won and lost by job type
  • Job cost against estimate
  • Machine hours and utilisation by excavator and tipper
  • Loads hauled by job, material, tare and tip
  • Fuel issued against hours worked
  • Claims raised, paid and held back as retention
  • Hired plant, dumpers and subcontract cost by job

Systems it may need to connect to

Note which ones you already run.

  • Email
  • SMS
  • WhatsApp or other messaging
  • Payment gateway
  • Accounting software export
  • Telematics feeds

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it cost each job from machine hours?
  • Does a foreman need a laptop to log a day on the dig?
  • Does it handle unit-rate and lump-sum pricing?
  • Can we track our own tipper trucks and load tickets?
  • Can it show when a machine is due for service?
  • Can hired machines and subcontractors be tracked?
  • Can existing jobs and unpaid claims be loaded?
  • Who owns the data?
  • What does it cost?
  • What would foremen be using ahead of the rest of the office?
  • What should the estimator and yard have in hand before we start?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Machine hours are not tied to a job
  • Haul loads are hard to count
  • Variations are lost
  • Fuel and maintenance drift
  • Hire and subcontract costs are tracked apart

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Subcontract crews and rented machines

Can you account for what is still with the outside processor?

In “Subcontract crews and rented machines”, reconcile material sent out against good returns, scrap and material still held. Ask how an unexplained difference would be investigated before closing the job.

Background reading: ERPNext: subcontracting records

Estimates and bids

Which assumptions stop being valid when the quotation changes?

For “Estimates and bids”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Prefer to talk it through? See the excavation companies page.