Heavy equipment and mining · Software for excavation companiesHold each dig’s bank quantities, bucket hours, tipper loads and progress claims on one record.

Excavation software keeps each dig on one record. It carries the quoted bank cubic metres, the excavators and articulated dump trucks sent out, the tipper loads taken to landfill and the diesel drawn from the bowser. Progress claims are raised from those same figures, and the foreman, the estimator and the yard clerk all read one page. Wet-hired plant is listed beside your own.

At a glance

An excavation contractor strips topsoil, benches slopes, digs sewer trenches and footings, backfills, loads spoil onto tippers and brings in hardcore for the subgrade. Work is priced by the cubic metre, by the hour or as a lump sum, and the machines carry the cost. An idle excavator is money gone.

Most firms track those hours on paper dockets stuffed in cabs, in driver notes, on a yard whiteboard and on a foreman’s phone, then reconcile them at month end. Excavation software joins every one to the job. Estimator, foreman and accounts clerk then work from the same bank quantities, machine rates and tipper tickets, not three private copies of them.

How the work runs today

A developer or utility asks for a price. An estimator reads the drawings, measures cut and fill from the longitudinal sections, and notes the soil, the groundwater, the haul road and the access to the pit. The price covers machine hours, trucks, labour, landfill gate fees, geotextile and any hired plant, with a line for swell and bulking of the spoil. The quote is lump sum or unit rate. Once accepted, a job opens with a programme. Pegs and a benchmark go in first. Quantities are agreed on paper. Every later change to cut depth, haul distance or disposal site must be written against that same page and signed by the client’s representative before the work starts.

On site, operators dig and load, banksmen guide the tippers in and out, and drivers run spoil to landfill, to a stockpile or to another site. A foreman keeps a daily log of hours, weather, loads, dewatering and any extra work the client asked for, and photographs the face before it is backfilled. Fuel is drawn from a bowser. Service falls due at set engine hours. At month end, progress claims are raised on measured quantities, and any variation or dayworks item is argued from the log, line by line. A thin log makes a thin claim. Rain days count too.

Where it breaks

What goes wrong for excavation companies without a proper system.

Machine hours are not tied to a job

One 20-tonne excavator strips topsoil on Monday, digs a sewer trench on Wednesday and loads hardcore on Friday, and its hours go on one paper docket. Job cost comes later, if at all.

Haul loads are hard to count

Tippers carry spoil to landfill or bring fill in, and the weighbridge tickets pile up in cabs until someone matches them to the job at month end. Some tickets never arrive at all.

Variations are lost

A client asks for extra depth, a second trench or a rock breaker by phone, so the request is verbal and the claim has no trail. The extra cost is absorbed.

Fuel and maintenance drift

Diesel is drawn across several machines with no log against the job, and service intervals for grease nipples, track tension and hoses live in the operator’s head. A split hose ends the week.

Hire and subcontract costs are tracked apart

Rented machines and subcontract tippers arrive with their own timesheets, and their cost is not set against the job until the supplier’s invoice shows up. By then the job is closed.

What changes

What excavation companies gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Machine hours charged to the right job

Each excavator and articulated dump truck is allocated to a job and a day, and operators log hours against it. The estimator later sees how long the dig took against the priced hours. Hired plant joins the same record. The comparison is made from the log, not memory.

Haul tickets counted at the gate

Every tipper load to landfill has a ticket with the truck, the time and the gate fee. The foreman counts loads against the quoted bank cubic metres. Short counts show on the day. The landfill invoice is checked against the ticket list. Disputes with the landfill start from tickets.

Variations recorded when the ground changes

When groundwater or rock changes the dig, the foreman notes it in the daily site log with a photograph. The note becomes a variation with its machine hours. The client sees what changed. Progress claims then include the agreed variation. The record stays with the job from the first photograph.

Diesel and servicing tied to each machine

Bowser draws are posted to the machine that took them. The workshop sees hours since the last service and books the oil change before a breakdown. Fuel per machine hour can be compared across excavators. A thirsty machine stands out. Maintenance becomes a plan, not a reaction.

Progress claims raised from site figures

The quantity dug, the loads hauled and the rented plant used all feed the claim. The estimator, the foreman and accounts read from one record. The claim goes out with its support attached. Subcontract crews are paid from the same measured work. Nothing is claimed that was not dug.

What the software does

What we would build for excavation companies.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Estimates and bids

Price each job from measured cut and fill, swell and bulking, machine rates, truck rates, labour and landfill fees, and keep every revision of the bid.

Jobs and daily site logs

Open a job for each site, and the foreman fills a daily log on a phone with hours, loads, weather, dewatering and the client’s instructions.

Machines, operators and allocation

Plan which excavator, backhoe, dozer or roller and which operator go to which site, and record the hours each one worked against the job.

Haulage and load tickets

Record each truck load with its material, source, destination and ticket number, total the loads by job and by tip, and flag any ticket with no weighbridge slip.

Fuel, servicing and breakdowns

Log diesel issued to each machine, set service intervals by engine hourmeter, and keep a repair history for every unit, from dozer undercarriage to breaker hoses.

Progress claims and variations

Raise claims from measured quantities, attach the log entries behind any variation or dayworks sheet, and track what is paid and what retention holds back.

Subcontract crews and rented machines

Record wet-hired machines and subcontract crews against each job with their rates and hours, and check each supplier invoice against the log before it is approved.

Utility and service plans

Before a dig opens, the estimator files the utility plans, the located services and any permit to dig. The foreman sees where cables and mains run. A strike or near miss is logged against the job.

Ground conditions and test pits

Trial pit logs, groundwater levels and soil descriptions are kept with the job. Estimators compare them with what the crew finds. Variations cite them when the ground differs from the tender.

Operator tickets and tool checks

Excavator and dump truck operators have a licence, ticket and expiry date on file. Yard staff see who is cleared for which machine.

Before you talk to a supplier

A requirements checklist for excavation companies.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules excavation companies use most.

Each one is also available on its own, or inside a system built for you.

Estimate/Quotation Management

The estimate builds from bank cubic metres, swell and bulking, machine hours, truck cycles and landfill gate fees. Unit rate and lump sum quotes both work. Accepted figures become the job’s budget.

Learn more

Resource Allocation

Excavators, articulated dump trucks and gangs are assigned to each dig for set dates. The planner sees a machine double-booked across two sites. Wet-hired plant is placed beside your own.

Learn more

Attendance & Time Tracking

The foreman marks operators, banksmen and labourers present at each site. Hours go against the job and against the machine that was worked. Casual labour needs no second entry.

Learn more

Vehicle and Trip Management

Tipper trips are logged from pit to landfill with the load ticket and cycle time. Haul road delays are visible by truck. Haulage cost per cubic metre follows from these trips.

Learn more

Fuel and Driver Records

Diesel drawn from the bowser is booked to a machine, a driver and a site. Excavators burning more than their pattern are flagged.

Learn more

Asset AMC Tracking

Excavators and dump trucks carry service intervals by hour meter and annual cover on hydraulics. The yard sees which machine is due before it goes to site. Breakdown history stays with each machine.

Learn more

Vendor Management

Plant hire firms, landfill operators and geotextile suppliers each have rates and past jobs on file. Wet-hire invoices are checked against hours signed on site. Preferred names show first.

Learn more

Invoice Management

Progress claims are raised from agreed quantities, measured site volumes and approved variations. Retention and earlier payments appear as deductions. Clients see the full build-up behind every figure claimed.

Learn more
AI by department

Where AI can help excavation companies.

Each one reads records you already keep, and a person approves every decision.

Worldwide

Where we work with excavation companies.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Subcontract crews and rented machines

Can you account for what is still with the outside processor?

In “Subcontract crews and rented machines”, reconcile material sent out against good returns, scrap and material still held. Ask how an unexplained difference would be investigated before closing the job.

Background reading: ERPNext: subcontracting records

Estimates and bids

Which assumptions stop being valid when the quotation changes?

For “Estimates and bids”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Common questions

Questions excavation companies ask before they call.

Can it cost each job by machine hours?

Yes. Hours in the daily log are priced at each machine’s rate and added to the job, with diesel, trucks and labour beside them. The margin on a dig can be read.

Can foremen enter site logs from a phone?

Yes. A foreman opens the job in a phone browser, notes hours, loads, weather and client instructions, and attaches photographs of the cut. It runs online. A remote pit without signal has to wait.

Does it handle both unit-rate and lump-sum jobs?

Yes. A job can be priced by the cubic metre, by the hour or as a lump sum, and claims follow measured quantities or agreed stages as the contract sets.

Can it track hired machines and tipper trucks?

Yes. Hired machines and subcontract tippers go onto the job with their hire rates and hours, and their invoices are checked against the log. Gaps are flagged.

How is an earthmoving system quoted?

Size depends on concurrent jobs, the excavators, dump trucks and wet-hired plant to list, and the estimators, foremen and yard clerks who use it. Fuel tracking and progress claims may be in the first release or come later. Linking haulage or accounts is extra.

What should an excavation contractor bring to the first review?

Bring a recent bid with its cut and fill workings, daily site logs, load tickets, the fuel bowser register and a progress claim with variations. Nominate an estimator, a foreman and a yard clerk who can check screens.

Who holds job logs and claims if the contractor moves on?

The contractor, and the code stays with the contractor too. Daily logs, load tickets, fuel draws and variations can be taken as plain files whenever the contractor wants. Build and support sit with one team. GullySystem hosts it unless you tell us to do otherwise.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of these wider groups.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.