Skip to main content
GullySystem
Heavy equipment and mining · Software for excavation companies

Keep each dig’s quantities, machine hours, haul loads and progress claims on one record.

Excavation company software holds each job as one record. The job carries its quoted quantities, the machines and operators sent to it, the loads hauled away, fuel burned and the claims raised against the work done. The office, the site foreman and the yard read the same figures. Hired plant and subcontractors are tracked beside your own fleet.

At a glance

An excavation contractor strips topsoil, digs foundations and trenches, grades sites, loads spoil and brings in fill. The work is priced by the cubic metre, by the hour or as a lump sum. Machines are the main cost, and every hour of one is money.

Most firms track those hours on paper tickets, in driver notes and in a foreman’s phone. Excavation software joins them to the job. Quantities, hours and claims then come from one source. The estimator, the foreman and the accounts clerk then work from the same quantities, the same machine rates and the same load tickets, rather than from three private copies.

How the work runs today

A builder, a developer or a utility asks for a price. An estimator reads the drawings, measures the cut and fill, notes the soil and the access, and prices machine hours, trucks, labour, disposal and any hired plant. The quote is lump sum or by unit rate. Once it is accepted, a job is opened and a programme set with the start date and the machines needed. Quantities are agreed on paper before the first machine arrives, and every later change to the cut depth or the haul distance has to be written against that same page.

On site, operators dig and load. Truck drivers carry loads to a tip or to another site. A foreman keeps a daily log of hours, weather, loads and any extra work the client asked for. Fuel is drawn from a bowser or a tanker. Machines are serviced in the yard at set hours. At month end, progress claims are raised on measured quantities, and variation items are argued from the log. A thin log makes a thin claim. Rain days count too.

Where it breaks

What goes wrong for excavation companies without a proper system.

Machine hours are not tied to a job

An excavator works on three sites in a week. Hours are noted on a slip, and the cost of each job is worked out later, if at all.

Haul loads are hard to count

Trucks carry spoil to a tip or bring fill in. Load tickets pile up in cabs and are matched to the job at month end. Some never arrive.

Variations are lost

A client asks for extra depth or a second trench. The request is verbal, and the claim has no written trail to support it. The extra cost is absorbed.

Fuel and maintenance drift

Fuel is drawn across several machines and sites. Service intervals are noted in the operator’s head, and a breakdown follows.

Hire and subcontract costs are tracked apart

Rented machines and subcontract trucks arrive with their own timesheets. Their cost is not set against the job until the supplier’s invoice shows up. By then the job is closed.

What the software does

What we would build for excavation companies.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Estimates and bids

Price each job from measured quantities, machine rates, truck rates, labour and disposal, and keep every revision of the bid.

Jobs and daily site logs

Open a job for each site and record daily hours, loads, weather and instructions from the client in a log the foreman fills on a phone.

Machines, operators and allocation

Plan which machine and which operator go to which site, and record the hours each one worked against the job.

Haulage and load tickets

Record each truck load with its material, source, destination and ticket number, and total the loads by job and by supplier.

Fuel, servicing and breakdowns

Log fuel issued to each machine, set service intervals by hours, and keep a history of repairs for every unit in the fleet.

Progress claims and variations

Raise claims from measured quantities, attach the log entries behind any variation, and track what has been paid and what is held back.

Subcontract crews and rented machines

Record hired machines and subcontract crews against each job, with their rates and hours, and check their invoices against the log.

Before you talk to a supplier

A requirements checklist for excavation companies.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Ready product

A product already built for excavation companies.

It is adapted to how your business works before it goes live, and anything your trade needs that it lacks is added then.

Excavation Company Management Software

Estimates, jobs, daily site logs, machine and operator allocation, haulage tickets, fuel, servicing, hired plant, dayworks and progress claims for excavation companies.

See the product
Solutions inside

The business modules excavation companies use most.

Each one is also available on its own, or inside a system built for you.

Worldwide

Where we work with excavation companies.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, Tally reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Common questions

Questions excavation companies ask before they call.

Can it cost each job by machine hours?

Yes. Hours recorded in the daily log are priced at each machine’s rate and added to the job. Fuel, trucks, labour and hired plant are set beside them, so the margin on a job can be read.

Can foremen enter site logs from a phone?

Yes. A foreman opens the job in a phone browser, notes hours, loads, weather and client instructions, and attaches photographs. It runs online, so a remote pit without signal has to wait.

Does it handle both unit-rate and lump-sum jobs?

Yes. A job can be priced by the cubic metre, by the hour or as a lump sum. Claims follow the measured quantities or the agreed stages, as the contract sets.

Can it track hired machines and tipper trucks?

Yes. Hired machines and subcontract trucks go onto the job with their hire rates and hours. Their invoices are checked against what the log shows. Gaps are flagged.

What happens in the free technology audit?

We look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough to start. You get a report ordered by priority, and there is no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. The audit settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of these wider groups.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements