Skip to main content
GullySystem

Operator timesheets for excavation crews

Operator timesheets record who worked on which site. Operators, tipper drivers, banksmen and labourers are marked present against a job, and their hours feed wages and overtime. Foremen mark the day, the office reviews the sheets, and each job’s labour cost builds from the same entries.

What an excavation crew timesheet records

A timesheet line ties a named person to a job, a date and a number of hours. That is all it needs. It is enough to price labour, because everything else is worked out from those lines. Corrections are made on the line itself.

Attendance by name and day

Each operator, tipper driver, banksman and labourer is marked present or absent for the day. Leave and sickness are marked the same way. The sheet shows who was meant to be on site and who was not.

Job and stage worked

The line names the job, and the stage where it matters. An operator who spent the morning on a trench and the afternoon on a basement has two lines. Labour cost then lands on the right job.

Hours and overtime

Start, finish and breaks give the hours. Hours past the normal day are marked as overtime under the rule the firm sets. The rule is entered once. Lines are not argued over each pay period.

Role and pay rate

Each person carries a role and a pay rate, so an operator’s hour and a banksman’s hour cost differently. Rates are kept by the office. A new starter is added with a role before the first sheet.

Marking the crew from morning to pay day

Timesheets are built a day at a time and read at the end of the pay period. The foreman marks the crew when work starts and adjusts if someone leaves early, and the office reads the totals later. Daily entries are what the pay run reads.

Marking attendance at the gate

At the start of the shift the foreman marks who has turned up on the phone. Late arrivals are marked late. A banksman who is absent is marked absent, so the sheet matches who is really on the dig.

Moving a labourer between jobs

A labourer starts on the trench and is sent to the basement after the morning break. The hours are split across the two jobs. Each job picks up its share of labour cost, so neither site carries the other’s wages.

Recording overtime on a long dig

The bulk dig runs late because tippers are queuing at the tip. Extra hours are recorded against the operators who stayed. The overtime is charged to the job that caused it. The cause is on the record.

Closing the pay period

At the end of the period the office reviews the sheets, queries gaps with foremen and approves the hours. Wages and overtime then follow from the approved entries. Totals go to the accountant as data.

Who sees and signs the timesheet

Timesheets pass through four sets of hands. Foremen mark, accounts checks and pays, the owner reads cost, and the estimator learns from the hours. Each sees the same lines, laid out for a different question.

Foremen mark the crew

Foremen mark attendance on a phone for their own site, add hours and assign people to jobs from the day’s crew list. They correct a line the same day, while the work is fresh in mind. Late corrections need a reason.

Accounts review and approve

Accounts review the sheets, query odd hours and work out wages and overtime from the approved lines. They pass totals to the accountant. Tax and statutory deductions stay with the accountant. They also read the hours beside the site log before approving.

Owners watch labour cost

Owners read labour cost against the estimate by job, and how much overtime a site is running. A job burning overtime early is a warning on the programme. They act before the claim is raised.

Estimators compare hours

Estimators read actual labour hours from finished jobs and set them against the hours they priced. The gap changes the labour line on the next bid, as the hours show. Rates alone would hide it.

Timesheet rules to agree with the office

Four decisions give the sheets a settled meaning. Agree them with the owner, the accounts lead and the senior foreman before anyone is marked present. Changing them mid-year reopens old sheets.

Who may change a line for Operator timesheets

Decide who may edit a timesheet line once the foreman has marked it, and who approves a change after pay day. A correction without a name behind it invites a dispute. Keep the original line visible.

Who is left off the sheet

Decide whether office staff, fitters and subcontract crews appear here or elsewhere. Subcontract crews are paid on their own invoices and sit under hired plant and subcontractors, where they are checked against the site log. Keeping them apart avoids paying anyone twice.

How people and rates come across

Names, roles and pay rates are loaded from the payroll sheet in use today. The overtime rules are written down first. The office checks a few people against a recent payslip before the first sheet opens.

Which report to read first for Operator timesheets

Machine hours and utilisation by excavator and tipper sit beside operator hours, so read them together. A machine logged for more hours than its operator worked is the first thing to chase. Then chase the gap.

How timesheets link to jobs, sites and pay

Timesheets sit between the site and the office. The site log says who dug, the allocation plan says who was booked, and the wages run says what was paid. This feature checks the first two against each other and feeds the third. Each link follows.

  • Reads the day’s hours and site from daily site logs
  • Takes job and stage names from jobs and programme
  • Receives booked operators and drivers from machine and operator allocation
  • Feeds labour cost into the job cost against estimate report
  • Hands approved wages to accounts for the accountant’s export

Where operator timesheets stop

The timesheet records attendance and works out wages and overtime from the entries. It does not set pay rates, decide what overtime an agreement or the law requires, or file anything with an authority. Those rules come from the owner’s accountant and employment adviser. It does not clock anyone in by itself. A crew of two on short hires can keep a notebook.

FAQ

Frequently asked questions

Can a person be split across two jobs on one shift?

Hours are entered per job, so a labourer who worked the morning on a trench and the afternoon on a basement has two lines. Each job takes its share of labour cost. The day’s total stays the same.

How does overtime get worked out?

Overtime follows the rule the firm sets, such as hours past the normal day or hours on a rest day. The rule is entered once, and GullySystem staff will edit it when asked. Your adviser decides what is lawful.

Can tipper drivers and banksmen share one sheet?

Operators, tipper drivers, banksmen and labourers are all marked on one sheet. Each has a role and a rate. The foreman marks the crew for their own job. Roles keep each wage line straight, from driver to labourer.

What if a foreman forgets to mark a day?

The office sees a gap where a booked person has no hours. Accounts query the foreman, and the line is added with a note saying who added it and when. Wages wait for that answer.

Can wages be sent to our accountant?

Approved hours and wage totals are prepared as data for the accountant, using the accounting software export. Tax, deductions and filings stay with the accountant. The export carries names, jobs and hours. Accounts review it before it goes.

Where it fits

How this feature fits the system.

Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and estimates

Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.

Estimate/Quotation Management

Machine and operator allocation

The planner sees which excavators, tippers and operators are free before a new job is promised a start date.

Resource Allocation

Operator timesheets

Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.

Attendance & Time Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements