Progress claims and invoices for earthworks
Progress claims and invoices turn measured quantities and agreed stages into a bill. Variations and dayworks carry the site log entries behind them, retention is tracked on each job, and the office sees what every client still owes. Accounts raise the claim, and the owner reads the balance.
What an excavation claim records
One claim bills one job. It covers work done to date. It lists the quantities and stages, the variations and dayworks, the retention held and the amount due. The earlier claims are shown above it, so only new work is billed.
From measured quantity to cleared payment
A claim is built at the end of a stage or a period, from facts already entered. Nobody starts from a blank sheet. The path from the cut to the bank runs through four moments, each with its own check.
Who raises, reads and relies on claims
Claims are raised by accounts, but they rest on facts from the cut. Four roles touch them. Each depends on what the others entered earlier. A weak entry upstream becomes a weak line in the claim.
Claim layouts and rules to settle first
Four decisions shape the first claim. Settle them with accounts, the owner and a sample contract before the layout is built. Clients differ in how they certify progress, so the signed contract leads.
How claims connect to the rest of the product
A claim is the last link in a chain that starts at the quote. Quantities come from the job, evidence from the site log, spoil from the load tickets and cost from timesheets and hire. It gathers them and leaves with the bill. The hand-offs run as follows.
- Takes measured quantities and stages from jobs and programme
- Attaches daily site logs behind variations and dayworks lines
- Reads spoil removed from haulage and load tickets
- Takes the agreed price and unit rates from enquiries and estimates
- Prepares data for the accountant through the accounting software export
Where claims and invoices stop
The software builds the claim and tracks what is paid. Deciding what is owed is not its job. It does not certify a quantity or settle a dispute. Retention terms, notice periods and the validity of a variation are contract matters for the owner and a legal adviser. Tax on the invoice follows the accountant’s rules for your country. A one-off hire job can go on an invoice book.
Frequently asked questions
Can a claim follow agreed stages instead of volumes?
Whichever basis the contract sets, the claim follows it. Stage-based jobs bill the stages the client has agreed as complete. Volume-based jobs bill measured quantities to date. A lump sum can be claimed in agreed parts.
How do daily logs support a dayworks line?
Each dayworks line points to the log entries behind it, with hours, machines, instruction and photographs. Accounts attach them to the claim. The client sees the day, the names and the work, not only a total.
How is retention tracked across several claims?
Retention is recorded on each claim as an amount held, and a running total is kept for the job. A release of retention is entered when the client agrees to it. Every balance shows in the report.
Can we see what each client still owes?
Each client has a balance made up of unpaid claims and invoices, with their age and the job each belongs to. Receipts posted reduce it. The owner reads the list without opening each job. Age is shown for chasing.
Can clients pay online from the invoice?
Where a payment gateway is connected, the invoice can carry a way to pay. The gateway is priced as its own part of the project. Receipts then post to the claim. Without it, receipts are posted by hand.
How this feature fits the system.
Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and estimates
Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.
Estimate/Quotation ManagementMachine and operator allocation
The planner sees which excavators, tippers and operators are free before a new job is promised a start date.
Resource AllocationOperator timesheets
Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.
Attendance & Time TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements