Progress claims and invoices for earthworks

Progress claims and invoices turn measured quantities and agreed stages into a bill. Variations and dayworks carry the site log entries behind them, retention is tracked on each job, and the office sees what every client still owes. Accounts raise the claim, and the owner reads the balance.

What an excavation claim records

One claim bills one job. It covers work done to date. It lists the quantities and stages, the variations and dayworks, the retention held and the amount due. The earlier claims are shown above it, so only new work is billed.

Quantities and stages claimed

It lists what has been dug and hauled so far, as measured volumes by stage or as stages the client has agreed are done. Earlier claims are carried forward. Only the new work is billed.

Variations and dayworks lines

Variation and dayworks lines sit beside the main work, each tied to the site log entries behind it. The client’s instruction, the hours, the machines and the photographs are attached. Nothing is argued from memory.

Retention held back

The contract’s retention is recorded on each claim as an amount held. Release is entered when the client agrees it. The held amount stays visible, and the running total for the job is shown on every claim.

Invoice, receipt and balance

The claim becomes a tax invoice in the form the client needs, with the job and claim numbers. Receipts are posted against it. The balance each client still owes is what remains unpaid across all jobs and claims.

From measured quantity to cleared payment

A claim is built at the end of a stage or a period, from facts already entered. Nobody starts from a blank sheet. The path from the cut to the bank runs through four moments, each with its own check.

Measuring at the stage end

The bulk dig is complete. Surveyed quantities and hauled loads are set against the priced figures, and the claim lines fill. The client’s representative agrees the measure. Any shortfall is shown before the claim is sent.

Attaching a variation

The client asked for a wider batter in the middle of the dig. The log entry with the instruction, the hours and the photograph is attached to the variation line. The claim goes out with its evidence.

Sending and chasing

Claims go out by email or a messaging app. Accounts see which claims are unpaid and how old each is. A call to the client starts with the file open. The file holds the history.

Posting the receipt and closing out

Payment arrives and is posted against the claim. At close-out, final quantities are agreed with the client and retention is entered for release. The job’s actual cost is then set beside the estimate in the cost report.

Who raises, reads and relies on claims

Claims are raised by accounts, but they rest on facts from the cut. Four roles touch them. Each depends on what the others entered earlier. A weak entry upstream becomes a weak line in the claim.

Accounts raise and chase

Accounts raise claims and invoices, check hired plant bills, post receipts and prepare data for the accountant. They see each client’s balance. Chasing a late payer starts from the claim itself, not from a hunch.

Owners watch cash and retention

Owners read claims raised, paid and held back as retention, and which claims are unpaid by client. A client slow to pay is spotted early on the list. Work pauses only on the owner’s word.

Foremen back the claim with logs

Foremen supply the evidence by logging hours, loads, weather and client instructions on the day, with photographs. A variation line is only as strong as the entry behind it. Write the request down at the time.

Estimators check quantities

Estimators compare claimed quantities with those priced. A job that dug more than quoted may justify a variation, if the contract allows. They agree the position with the owner and accounts before the claim leaves.

Claim layouts and rules to settle first

Four decisions shape the first claim. Settle them with accounts, the owner and a sample contract before the layout is built. Clients differ in how they certify progress, so the signed contract leads.

Who may change a claim

Decide who can edit a claim after it has gone to the client and who approves a credit note. A figure altered silently destroys the client’s trust in the figures. Keep each version and its date.

What the claim leaves out

Decide whether materials delivered but not yet used, standing time and small extras are claimed on the same sheet or invoiced apart. Follow the contract. Write the choice into the template, so every claim is laid out alike.

How unpaid claims come across

Outstanding claims are loaded from the sheets in use now, with client, job, amount, date and retention held. Live jobs come with them. The office spot-checks a few before the first new claim is raised.

Which report to read first for Progress claims and invoices

Start with claims raised, paid and held back as retention. It shows what is owed, what is waiting and what is locked up. Read it before pay day. Then add job cost against estimate once jobs close.

How claims connect to the rest of the product

A claim is the last link in a chain that starts at the quote. Quantities come from the job, evidence from the site log, spoil from the load tickets and cost from timesheets and hire. It gathers them and leaves with the bill. The hand-offs run as follows.

  • Takes measured quantities and stages from jobs and programme
  • Attaches daily site logs behind variations and dayworks lines
  • Reads spoil removed from haulage and load tickets
  • Takes the agreed price and unit rates from enquiries and estimates
  • Prepares data for the accountant through the accounting software export

Where claims and invoices stop

The software builds the claim and tracks what is paid. Deciding what is owed is not its job. It does not certify a quantity or settle a dispute. Retention terms, notice periods and the validity of a variation are contract matters for the owner and a legal adviser. Tax on the invoice follows the accountant’s rules for your country. A one-off hire job can go on an invoice book.

FAQ

Frequently asked questions

Can a claim follow agreed stages instead of volumes?

Whichever basis the contract sets, the claim follows it. Stage-based jobs bill the stages the client has agreed as complete. Volume-based jobs bill measured quantities to date. A lump sum can be claimed in agreed parts.

How do daily logs support a dayworks line?

Each dayworks line points to the log entries behind it, with hours, machines, instruction and photographs. Accounts attach them to the claim. The client sees the day, the names and the work, not only a total.

How is retention tracked across several claims?

Retention is recorded on each claim as an amount held, and a running total is kept for the job. A release of retention is entered when the client agrees to it. Every balance shows in the report.

Can we see what each client still owes?

Each client has a balance made up of unpaid claims and invoices, with their age and the job each belongs to. Receipts posted reduce it. The owner reads the list without opening each job. Age is shown for chasing.

Can clients pay online from the invoice?

Where a payment gateway is connected, the invoice can carry a way to pay. The gateway is priced as its own part of the project. Receipts then post to the claim. Without it, receipts are posted by hand.

Where it fits

How this feature fits the system.

Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and estimates

Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.

Estimate/Quotation Management

Machine and operator allocation

The planner sees which excavators, tippers and operators are free before a new job is promised a start date.

Resource Allocation

Operator timesheets

Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.

Attendance & Time Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements