Enquiries and estimates for excavation bids
Enquiries and estimates gives an earthworks estimator one record for each price asked for. It holds the measured cut and fill, swell, machine and tipper rates, labour, shoring and tip charges, and every revision sent to the builder or developer. Owners follow open quotes, and an accepted bid opens the job.
What an excavation estimate keeps
Each enquiry becomes a record the estimator can reopen months later and still read. It keeps the client, the site, the quantities measured and the rates applied. Revisions are kept beside the first figure. A basement bid and a culvert bid sit side by side in one list.
A week of quoting for dig jobs
Bids arrive from builders, developers and utility clients with no fixed pattern. The estimator works them as they come. The record keeps each one at the stage it has reached, from site visit to sent quote to won or lost.
What each person sees on a bid
Every role reads the same bid. Each looks at a different part of it. Estimators build it, the owner reviews open quotes, the foreman receives what was priced, and accounts later bill against it.
Estimating decisions for an excavation firm
Decide a few points before the first bid is entered. They shape every figure after it. The owner and the estimator settle them together, before any stored rate goes in.
How estimates feed the rest of the product
An estimate is the start of a job’s paper trail, not a separate file. Quantities and rates priced here are the figures later stages measure against. The job inherits them, the site log tests them and the claim finally bills them. Each hand-off is listed below.
- Opens a job with quantities and stages from the won bid
- Takes machine and tipper rates from the stored rate lists
- Sends priced machine hours to allocation so free excavators show
- Compares priced loads with weighbridge tickets from load tickets
- Sets the agreed price beside quantities in progress claims
Limits of excavation estimating here
It prices a job and keeps its history. It does not measure the ground, so the cut and fill figures come from the estimator’s takeoff from drawings or a site survey. It does not decide the margin, accept risk on unknown ground or settle contract wording, which stays with the owner and a legal adviser. A one-excavator owner quoting a day’s hire from a rate card does not need this much.
Frequently asked questions
Can we reprice an old bid with new rates?
Open the earlier bid and start a new revision from it. Change the rates or quantities that have moved. The first version stays as it was sent, so the two can be compared side by side.
Does the estimate include tip charges and shoring?
Both are priced lines in the bid, alongside machines, tippers and labour. Shoring has its own item. Tip charges follow the tip named for the job, whose rate is stored. A job with a dewatering pump adds the pump hire the same way.
What happens to the bid once the job is won?
Marking it won opens the job with the quantities, stages and rates carried over. Start dates are then added. The bid stays on file, so job cost can later be set against it in the report.
Can swell and bulking be set for different soils?
Swell factors are stored values, so clay, sand and rock can each carry their own. Each stage takes its own factor. Your current figures go in first, as the firm prices today. Nobody retypes them per bid.
Does a lost bid stay on file?
A lost bid stays on file. Owners can then read lost work by job type and see where prices missed. A later enquiry from the same client starts with that history in view.
How this feature fits the system.
Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and estimates
Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.
Estimate/Quotation ManagementMachine and operator allocation
The planner sees which excavators, tippers and operators are free before a new job is promised a start date.
Resource AllocationOperator timesheets
Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.
Attendance & Time TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements