Servicing and breakdowns for excavation fleets
Machine servicing and breakdowns gives every excavator and tipper its own service record. Intervals are set by hours, the hours come from the daily site log, and the history of repairs, hoses and bucket teeth stays on the unit. The yard plans greasing and servicing before a machine passes its limit.
What each machine’s service record holds
One record belongs to one unit and stays with it. It holds the interval, the greasing schedule, every repair and every breakdown. A new yard hand reads it and knows the whole machine. Memory is no longer the only copy.
Servicing planned around the dig
Servicing competes with digging for the same machine. The record shows a due date ahead of time, not on the morning it arrives. Work is then slotted into a gap in the programme instead of causing a stoppage. A planned stop is easier to absorb than a surprise one.
Who reads and writes service records
Yard and workshop staff write the entries. Operators and foremen add the first report of a fault, and owners read the cost. Each sees the record from a different side. Accounts match the bills.
Service record choices before set-up
Four decisions give the records their shape. Agree them with the yard lead and the owner before units are loaded. They are quicker to settle now than to correct on a full fleet.
How servicing links to hours, plan and cost
Servicing depends on facts held elsewhere. Hours arrive from the site log. Free time comes from the allocation plan. Cost reaches the job through accounts. The service record takes those in and gives back a due date and a repair history that other features read. The five links are set out below.
- Takes machine hours from daily site logs to move counters
- Hands service due dates to machine and operator allocation
- Reads fuel per hour from fuel issue and consumption for warning signs
- Shows days lost to breakdowns on jobs and programme
- Sends repair invoices to accounts for checking and payment
Where servicing records stop
This record reminds and remembers. It does not diagnose a fault, order a part or turn a spanner. Service intervals come from the manufacturer’s manual and the owner’s own practice, and the record follows them. Safety inspections, certificates and insurance conditions stay with the owner and the relevant inspector. A telematics feed is a separate connection, quoted on its own. One machine needs only a log book.
Frequently asked questions
How does a service become due by hours?
Each unit has an interval in hours. The daily site log adds the hours worked, so the counter rises as the machine digs. Hours remaining are shown on the record. Staff in the yard see the unit approach its limit.
Can we record a hose or bucket tooth replacement?
Each hose or tooth change is a repair entry with the date, the part, the cost and the machine’s hours. The history shows how soon each part wore. That informs the next purchase. It also shows which ground wears teeth.
What happens when an excavator breaks down mid-job?
The foreman enters the breakdown, and the machine is marked as out. The planner sees the gap and can move another unit or hire in. Days lost remain on the job record. Hired cover is entered under hired plant.
Can the yard plan greasing around the programme?
Greasing and services are scheduled against free time on the allocation plan. Yard staff pick a gap between stages or sites, whichever suits the dig. A booking is then placed against the machine. Nobody promises it elsewhere.
Does it store the manufacturer’s service schedule?
Intervals are entered unit by unit from the manual or the owner’s own rule. They are not supplied for you. Changes to an interval are made by whoever the firm names, and can be asked of GullySystem staff.
How this feature fits the system.
Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and estimates
Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.
Estimate/Quotation ManagementMachine and operator allocation
The planner sees which excavators, tippers and operators are free before a new job is promised a start date.
Resource AllocationOperator timesheets
Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.
Attendance & Time TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements